Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-182274 | Discussion on quiet zone for NR RRM with 2 TRxP | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
withdrawn | [WTS] [JSN] | |
R5-182465 | Impact of Phase variation on UE antenna arrays beam pattern at mmWave | discussion | MVG Industries | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | |
R5-182473 | FR2 RefSens Test & Peak Beam Search Polarization | discussion | Qualcomm UK Ltd | Rel-15 |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-182474 | Statistical Testing (new)Annex H for 38.521-1/2/3 |
discussion revised to R5-183902 |
Qualcomm UK Ltd | Rel-15 |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | ||
R5-182521 | Discussion on test point selection for NR PRACH time mask in FR1 |
discussion revised to R5-183904 |
KTL | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | ||
R5-182522 | Discussion on test point selection for NR Transmit Intermodulation in FR1 |
discussion revised to R5-183905 |
KTL | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | ||
R5-182523 | Discussion on test point selection for NR PRACH time mask in FR2 |
discussion revised to R5-183907 |
KTL | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | ||
R5-182686 | Discussion on MIMO OTA performance conformance test |
discussion revised to R5-183700 |
CMCC | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | ||
R5-182726 | Discussion on TT calculation from MU in FR2 |
other revised to R5-183909 |
KDDI Corporation | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | |
R5-182789 | Proposal for Maximum Test System Uncertainty for NR FR1 TRx tests |
discussion revised to R5-183910 |
Anritsu, ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | |
R5-182790 | Discussion on the FR2 spurious emission test procedure (1) | discussion | Anritsu | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
withdrawn | [WTS] [JSN] | |
R5-182791 | Proposal on the coarse grid and offset value for FR2 TRx spurious test |
discussion revised to R5-183913 |
Anritsu | Rel-15 |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | ||
R5-182800 | Discussion on common test setup for FR2 TRx MU work | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-182808 | Discussion on test frequencies for spurious emissions test in FR2 | discussion | Rohde & Schwarz | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | |
R5-182809 | Discussion on FR1 MU | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
withdrawn | [WTS] [JSN] | ||
R5-182925 | FR2 MU and TT defining approach about test setup |
discussion revised to R5-183912 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | |
R5-182960 | Updates of 5G time plan about FR2 MU and TT |
discussion revised to R5-183933 |
NTT DOCOMO, INC., Anritsu, Dish Network, Ericsson, KDDI Corporation, KT Corp., KTL, LG Electronics, Samsung, SGS Wireless, Sharp, SoftBank Corp., Sony, Verizon | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | |
R5-182987 | FR2 MU factors for conducted part | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | |
R5-182994 | Discussion on EN-DC test cases definition in TS 38.521-3 | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | |
R5-182997 | Discussion on connection diagram structure in TS 38.508-1 Annex A |
discussion revised to R5-183915 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | |
R5-183000 | Discussion on test point selection for transmit modulation quality test cases in FR1 |
discussion revised to R5-183964 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | ||
R5-183007 | DFF and IFF test system assumptions for assessing the FR2 measurement uncertainty | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-183008 | On Beam Peak Search Measurement Grids for mm-wave | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-183009 | On TRP Measurement Grids for mm-wave | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-183012 | Discussion on test frequencies for SEM in FR2 | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-183039 | Analysis of Measurement Uncertainty Terms between methods in TR 38.903 | discussion | MVG |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | |||
R5-183257 | Updates of 5G time plan about FR2 MU and TT |
discussion revision of R5-183933 |
NTT DOCOMO, INC., Anritsu, AT&T, Dish Network, Ericsson, KDDI Corporation, KT Corp., KTL, LG Electronics, Samsung, SGS Wireless, Sharp, SoftBank Corp., Sony, T-Mobile US, Verizon | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | |
R5-183700 | Discussion on MIMO OTA performance conformance test |
discussion revision of R5-182686 |
CMCC | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-183701 | Discussion paper on UBF Message Contents and Procedure | discussion | Qualcomm CDMA Technologies | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-183902 | Statistical Testing (new)Annex H for 38.521-1/2/3 |
discussion revision of R5-182474 |
Qualcomm UK Ltd | Rel-15 |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-183904 | Discussion on test point selection for NR PRACH time mask in FR1 |
discussion revision of R5-182521 |
KTL | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-183905 | Discussion on test point selection for NR Transmit Intermodulation in FR1 |
discussion revision of R5-182522 |
KTL | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-183907 | Discussion on test point selection for NR PRACH time mask in FR2 |
discussion revision of R5-182523 |
KTL | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-183909 | Discussion on TT calculation from MU in FR2 |
other revision of R5-182726 |
KDDI Corporation | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | |
R5-183910 | Proposal for Maximum Test System Uncertainty for NR FR1 TRx tests |
discussion revision of R5-182789 revised to R5-183951 |
Anritsu, ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | |
R5-183911 | Way Forward on MU&TT |
other revised to R5-183952 |
ORANGE, Telecom Italia, Vodafone, CMCC, China Unicom, China Telecom, AT&T, Dish | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | ||
R5-183912 | FR2 MU and TT defining approach about test setup |
discussion revision of R5-182925 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | |
R5-183913 | Proposal on the coarse grid and offset value for FR2 TRx spurious test |
discussion revision of R5-182791 |
Anritsu | Rel-15 |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-183915 | Discussion on connection diagram structure in TS 38.508-1 Annex A |
discussion revision of R5-182997 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | |
R5-183932 | Required RMCs and parameters for few selected NR RF test cases |
discussion revised to R5-183950 |
Ericsson, Huawei, Rohde&Schwarz, Qualcomm | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | ||
R5-183933 | Updates of 5G time plan about FR2 MU and TT |
discussion revision of R5-182960 revised to R5-183257 |
NTT DOCOMO, INC., Anritsu, Dish Network, Ericsson, KDDI Corporation, KT Corp., KTL, LG Electronics, Samsung, SGS Wireless, Sharp, SoftBank Corp., Sony, Verizon | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
revised | [WTS] [JSN] | |
R5-183950 | Required RMCs and parameters for few selected NR RF test cases |
discussion revision of R5-183932 |
Ericsson, Huawei, Rohde&Schwarz, Qualcomm | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-183951 | Proposal for Maximum Test System Uncertainty for NR FR1 TRx tests |
discussion revision of R5-183910 |
Anritsu, ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | |
R5-183952 | Way Forward on MU&TT |
other revision of R5-183911 |
ORANGE, Telecom Italia, Vodafone, CMCC, China Unicom, China Telecom, AT&T, Dish | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] | ||
R5-183964 | Discussion on test point selection for transmit modulation quality test cases in FR1 |
discussion revision of R5-183000 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-79 AI: 5.3.14.16 |
noted | [WTS] [JSN] |
45 documents (0.33867692947388 seconds)