Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-184430 | TP on common test setup in FR2 | pCR | Anritsu | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
withdrawn | [WTS] [JSN] |
R5-184703 | MU budget for EIRP/TRP measurements with Near Field test range at mmWave | discussion | MVG Industries | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
withdrawn | [WTS] [JSN] | |
R5-184738 | pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave |
pCR revised to R5-185352 |
MVG Industries | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
revised | [WTS] [JSN] |
R5-184817 | Making Measurement Uncertainty Terms Common between methods in TR 38.90 | discussion | MVG Industries | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
withdrawn | [WTS] [JSN] | |
R5-184819 | pCR Making Measurement Uncertainty Terms Common between methods in TR 38.90 |
pCR revised to R5-185213 |
MVG Industries | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
revised | [WTS] [JSN] |
R5-184913 | Update MU factors for IFF | pCR | Keysight Technologies UK Ltd | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
withdrawn | [WTS] [JSN] |
R5-184976 | TP on Measurement Uncertainty Contributions in FR2 |
pCR revised to R5-185214 |
ROHDE & SCHWARZ | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
revised | [WTS] [JSN] |
R5-185212 | pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave |
pCR revision of R5-185352 |
MVG Industries | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
approved | [WTS] [JSN] |
R5-185213 | pCR Making Measurement Uncertainty Terms Common between methods in TR 38.90 |
pCR revision of R5-184819 |
MVG Industries | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
approved | [WTS] [JSN] |
R5-185214 | TP on Measurement Uncertainty Contributions in FR2 |
pCR revision of R5-184976 |
ROHDE & SCHWARZ | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
approved | [WTS] [JSN] |
R5-185352 | pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave |
pCR revision of R5-184738 revised to R5-185212 |
MVG Industries | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
revised | [WTS] [JSN] |
11 documents (0.34119892120361 seconds)