Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-240201 | Addition and correction to the NTN related abbreviations in 38.521-5 |
CR revised to R5-242031 |
MediaTek (Hefei) Inc. | 38.521-5 18.0.0 CR#2 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-240840 | Corrections on 5.3.3 for minimum guardband and transmission bandwidth configuration | CR | ZTE Corporation | 38.521-5 18.0.0 CR#3 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-240841 | Corrections on 6.2.2 for maximum output power reduction | CR | ZTE Corporation | 38.521-5 18.0.0 CR#4 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-240842 | Corrections on 6.2.3 for additional maximum output power reduction |
CR revised to R5-241805 |
ZTE Corporation | 38.521-5 18.0.0 CR#5 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-240843 | Corrections on 6.3.2 for Transmit OFF power | CR | ZTE Corporation | 38.521-5 18.0.0 CR#6 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-240844 | Corrections on 6.3.3 for Transmit ON OFF time mask |
CR revised to R5-241806 |
ZTE Corporation | 38.521-5 18.0.0 CR#7 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-240845 | Corrections on 6.4.1 for Frequency error | CR | ZTE Corporation | 38.521-5 18.0.0 CR#8 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
withdrawn | [WTS] [JSN] |
R5-240846 | Corrections on 6.5.2 for out of band emission | CR | ZTE Corporation | 38.521-5 18.0.0 CR#9 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-240847 | Corrections on 6.5.3 for spurious emission |
CR revised to R5-241807 |
ZTE Corporation | 38.521-5 18.0.0 CR#10 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-240848 | Corrections on 6.5.4 for transmit intermodulation | CR | ZTE Corporation | 38.521-5 18.0.0 CR#11 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
withdrawn | [WTS] [JSN] |
R5-240849 | Corrections on 7.3.2 for Reference sensitivity power level |
CR revised to R5-241877 |
ZTE Corporation | 38.521-5 18.0.0 CR#12 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-240850 | Corrections on 7.4 for maximum input level | CR | ZTE Corporation | 38.521-5 18.0.0 CR#13 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-240851 | Corrections on 7.5 for adjacent channel selectivity | CR | ZTE Corporation | 38.521-5 18.0.0 CR#14 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-240852 | Corrections on 7.6 for blocking characteristics | CR | ZTE Corporation | 38.521-5 18.0.0 CR#15 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-240853 | Corrections on A.3.2.1.1 for the reference channel for NTN PDSCH requirement | CR | ZTE Corporation | 38.521-5 18.0.0 CR#16 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-240854 | Update of 6.2.1 for maximum output power | CR | ZTE Corporation | 38.521-5 18.0.0 CR#17 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-240855 | Update of chapter 4 for RF general description |
CR revised to R5-241810 |
ZTE Corporation | 38.521-5 18.0.0 CR#18 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-240955 | Update to NTN Frequency Error TC | CR | Qualcomm Technologies Ireland | 38.521-5 18.0.0 CR#19 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
withdrawn | [WTS] [JSN] |
R5-240956 | Update to NTN Add Spurious Emission TC |
CR revised to R5-242008 |
Qualcomm Technologies Ireland | 38.521-5 18.0.0 CR#20 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-240957 | Update to NTN General Spurious emission TC |
CR revised to R5-242009 |
Qualcomm Technologies Ireland | 38.521-5 18.0.0 CR#21 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-240958 | Updates to NTN Spur emission UE Coex |
CR revised to R5-242010 |
Qualcomm Technologies Ireland | 38.521-5 18.0.0 CR#22 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-240959 | Update to NTN Tx Intermod TC |
CR revised to R5-242011 |
Qualcomm Technologies Ireland, ZTE | 38.521-5 18.0.0 CR#23 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-240960 | Update to NTN RefSens TC | CR | Qualcomm Technologies Ireland | 38.521-5 18.0.0 CR#24 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
withdrawn | [WTS] [JSN] |
R5-240961 | Update to NTN Annex F MU TT |
CR revised to R5-242012 |
Qualcomm Technologies Ireland | 38.521-5 18.0.0 CR#25 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-241148 | Update to PDSCH Mapping Type A test case for Satellite Access | CR | QUALCOMM Europe Inc. - Italy | 38.521-5 18.0.0 CR#26 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-241149 | General updates to RF NTN clauses | CR | QUALCOMM Europe Inc. - Italy | 38.521-5 18.0.0 CR#27 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-241361 | Splitting the NR NTN frequency error test case |
CR revised to R5-242013 |
ROHDE & SCHWARZ | 38.521-5 18.0.0 CR#28 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-241394 | UL RMCs updates for NR NTN |
CR revised to R5-242018 |
Keysight Technologies UK Ltd | 38.521-5 18.0.0 CR#29 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-241395 | Updates to NR NTN Frequency error test |
CR revised to R5-241808 |
Keysight Technologies UK Ltd | 38.521-5 18.0.0 CR#30 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-241396 | Updates to NR NTN Minimum output power test | CR | Keysight Technologies UK Ltd | 38.521-5 18.0.0 CR#31 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-241397 | Updates to NR NTN Transmit OFF power test | CR | Keysight Technologies UK Ltd | 38.521-5 18.0.0 CR#32 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-241398 | Updates to NR NTN Maximum Input Level test | CR | Keysight Technologies UK Ltd | 38.521-5 18.0.0 CR#33 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-241440 | Updates to NTN TC 6.3.3 on Tx on-off time mask | CR | Apple Benelux B.V. | 38.521-5 18.0.0 CR#34 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-241441 | Updates to NTN TC 6.5.2.2 on Spectrum emission mask | CR | Apple Benelux B.V. | 38.521-5 18.0.0 CR#35 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-241442 | Updates to NTN TC 6.5.2.4 on ACLR | CR | Apple Benelux B.V. | 38.521-5 18.0.0 CR#36 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-241805 | Corrections on 6.2.3 for additional maximum output power reduction |
CR revision of R5-240842 |
ZTE Corporation | 38.521-5 18.0.0 CR#51 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-241806 | Corrections on 6.3.3 for Transmit ON OFF time mask |
CR revision of R5-240844 |
ZTE Corporation | 38.521-5 18.0.0 CR#71 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-241807 | Corrections on 6.5.3 for spurious emission |
CR revision of R5-240847 |
ZTE Corporation | 38.521-5 18.0.0 CR#101 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-241808 | Updates to NR NTN Frequency error test |
CR revision of R5-241395 |
Keysight Technologies UK Ltd | 38.521-5 18.0.0 CR#301 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
withdrawn | [WTS] [JSN] |
R5-241810 | Update of chapter 4 for RF general description |
CR revision of R5-240855 |
ZTE Corporation | 38.521-5 18.0.0 CR#181 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-241877 | Corrections on 7.3.2 for Reference sensitivity power level |
CR revision of R5-240849 |
ZTE Corporation | 38.521-5 18.0.0 CR#121 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-242008 | Update to NTN Add Spurious Emission TC |
CR revision of R5-240956 |
Qualcomm Technologies Ireland | 38.521-5 18.0.0 CR#201 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-242009 | Update to NTN General Spurious emission TC |
CR revision of R5-240957 |
Qualcomm Technologies Ireland | 38.521-5 18.0.0 CR#211 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-242010 | Updates to NTN Spur emission UE Coex |
CR revision of R5-240958 |
Qualcomm Technologies Ireland | 38.521-5 18.0.0 CR#221 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-242011 | Update to NTN Tx Intermod TC |
CR revision of R5-240959 |
Qualcomm Technologies Ireland, ZTE | 38.521-5 18.0.0 CR#231 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-242012 | Update to NTN Annex F MU TT |
CR revision of R5-240961 |
Qualcomm Technologies Ireland | 38.521-5 18.0.0 CR#251 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-242013 | Splitting the NR NTN frequency error test case |
CR revision of R5-241361 |
ROHDE & SCHWARZ, Keysight Technologies UK Ltd, ZTE Corporation | 38.521-5 18.0.0 CR#281 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-242018 | UL RMCs updates for NR NTN |
CR revision of R5-241394 |
Keysight Technologies UK Ltd | 38.521-5 18.0.0 CR#291 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
agreed | [WTS] [JSN] |
R5-242031 | Addition and correction to the NTN related abbreviations in 38.521-5 |
CR revision of R5-240201 |
MediaTek (Hefei) Inc. | 38.521-5 18.0.0 CR#21 catF | NR_NTN_solutions_plus_CT-UEConTest | Rel-18 |
R5-102 AI: 5.3.10.4 |
withdrawn | [WTS] [JSN] |
49 documents (0.34332895278931 seconds)