Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R5-255635 Addition of EVM equalizer spectrum flatness for inter-band EN-DC including FR2 (2NR to 4NR CCs) CR

revised to R5-256841

Sporton International INC. 38.521-3 19.2.0 CR#2009 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-19 R5-109

AI: 5.3.1.5.1

revised [WTS] [JSN]
R5-255636 Addition of EVM equalizer spectrum flatness for inter-band EN-DC including FR2 (5NR to 8NR CCs) CR

revised to R5-256842

Sporton International INC. 38.521-3 19.2.0 CR#2010 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-19 R5-109

AI: 5.3.1.5.1

revised [WTS] [JSN]
R5-256217 Introduction of maximum output power test requirements for DC_4A_n41A, DC_4A_n78A and DC_20A_n41A CR vivo 38.521-3 19.2.0 CR#2017 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-19 R5-109

AI: 5.3.1.5.1

withdrawn [WTS] [JSN]
R5-256235 Introduction of maximum output power test requirements for DC_4A_n41A, DC_4A_n78A and DC_20A_n41A CR

revised to R5-256840

vivo 38.521-3 19.2.0 CR#2018 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-19 R5-109

AI: 5.3.1.5.1

revised [WTS] [JSN]
R5-256339 Update spurious emission band co-existence for inter-band R16 configurations DC_39_n41 and DC_66_n41 CR

revised to R5-256812

ZTE Corporation 38.521-3 19.2.0 CR#2026 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-19 R5-109

AI: 5.3.1.5.1

revised [WTS] [JSN]
R5-256812 Update spurious emission band co-existence for inter-band R16 configurations DC_39_n41 and DC_66_n41 CR

revision of R5-256339

ZTE Corporation 38.521-3 19.2.0 CR#20261 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-19 R5-109

AI: 5.3.1.5.1

agreed [WTS] [JSN]
R5-256840 Introduction of maximum output power test requirements for DC_4A_n41A, DC_4A_n78A and DC_20A_n41A CR

revision of R5-256235

vivo 38.521-3 19.2.0 CR#20181 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-19 R5-109

AI: 5.3.1.5.1

agreed [WTS] [JSN]
R5-256841 Addition of EVM equalizer spectrum flatness for inter-band EN-DC including FR2 (2NR to 4NR CCs) CR

revision of R5-255635

Sporton International INC. 38.521-3 19.2.0 CR#20091 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-19 R5-109

AI: 5.3.1.5.1

agreed [WTS] [JSN]
R5-256842 Addition of EVM equalizer spectrum flatness for inter-band EN-DC including FR2 (5NR to 8NR CCs) CR

revision of R5-255636

Sporton International INC. 38.521-3 19.2.0 CR#20101 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-19 R5-109

AI: 5.3.1.5.1

agreed [WTS] [JSN]

9 documents (0.38161396980286 seconds)