Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-220064 | Correction of test applicability of A-MPR |
CR revised to R5-221675 |
CAICT | 38.521-1 17.3.0 CR#1480 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
revised | [WTS] [JSN] |
R5-220071 | Addition of Test description and Test requirement for 6.3A.2.1 Transmit OFF power for 2UL CA | CR | CAICT | 38.521-1 17.3.0 CR#1481 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220072 | Correction of Table number in step 4 of 6.3A.4.2.1.4.1 | CR | CAICT | 38.521-1 17.3.0 CR#1482 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220073 | Correction of Test SCS in Table 6.2D.2.4.1-1 | CR | CAICT | 38.521-1 17.3.0 CR#1483 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220074 | Addition of missing clause titles for 6.5B, 6.5D.2_1.4 and 6.5D.2_1.4.1 | CR | CAICT | 38.521-1 17.3.0 CR#1484 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220075 | Correction of clause title styles | CR | CAICT | 38.521-1 17.3.0 CR#1485 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220080 | Adding additional tolerance to test requirement of Transmitter power test cases | CR | CAICT | 38.521-1 17.3.0 CR#1489 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220081 | Removal of Editor note about PC1 requirements in Rel-15 and Rel-16 | CR | CAICT | 38.521-1 17.3.0 CR#1490 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220252 | Editorial correction to minimum requirements in test 6.2D.2 | CR | Keysight Technologies UK Ltd | 38.521-1 17.3.0 CR#1513 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220253 | General corrections in FR1 6.3A.3.1 ONOFF time mask CA | CR | Keysight Technologies UK Ltd | 38.521-1 17.3.0 CR#1514 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220254 | Frequency correction for NS_27 in A-MPR test | CR | Keysight Technologies UK Ltd | 38.521-1 17.3.0 CR#1515 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220405 | Alignment of test points of ACLR with MPR |
CR revised to R5-221676 |
CAICT | 38.521-1 17.3.0 CR#1528 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
revised | [WTS] [JSN] |
R5-220537 | Correction on test procedure and initial condition for power tolerance test cases | CR | TTA | 38.521-1 17.3.0 CR#1531 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220770 | Corrections of Tx TCs having impact on ETSI EN 301 908-25 |
CR revised to R5-221677 |
China Unicom | 38.521-1 17.3.0 CR#1539 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
revised | [WTS] [JSN] |
R5-220892 | Correction to note of general spurious emissions |
CR revised to R5-221678 |
Anritsu | 38.521-1 17.3.0 CR#1557 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
revised | [WTS] [JSN] |
R5-220893 | Correction to test procedure of SRS time mask | CR | Anritsu | 38.521-1 17.3.0 CR#1558 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220898 | Correction to test requirement of 6.2.4 |
CR revised to R5-221679 |
Anritsu | 38.521-1 17.3.0 CR#1559 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
revised | [WTS] [JSN] |
R5-220899 | Correction to test requirement of NS_27 in 6.2.3 | CR | Anritsu | 38.521-1 17.3.0 CR#1560 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220900 | Correction to test requirement of NS_47 in 6.2.3 | CR | Anritsu | 38.521-1 17.3.0 CR#1561 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220901 | Correction to measurement timing for inter-band CA with FDD and TDD |
CR revised to R5-221680 |
Anritsu | 38.521-1 17.3.0 CR#1562 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
revised | [WTS] [JSN] |
R5-220905 | Correction to test CBW for Non-SUL carrier in 6.4C.2.2 | CR | Anritsu | 38.521-1 17.3.0 CR#1563 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220906 | Correction to test requirement of 6.5C.3.2 | CR | Anritsu | 38.521-1 17.3.0 CR#1564 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220907 | Editorial correction to SUL test cases |
CR revised to R5-221681 |
Anritsu | 38.521-1 17.3.0 CR#1565 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
revised | [WTS] [JSN] |
R5-220914 | Correction to RMC for PUCCH format 1 test cases | CR | Anritsu | 38.521-1 17.3.0 CR#1566 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220915 | Correction to connection diagram and test configuration for Tx SUL test cases | CR | Anritsu | 38.521-1 17.3.0 CR#1567 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-220919 | Correction to transmission slot in SRS time mask test case | CR | Anritsu | 38.521-1 17.3.0 CR#1568 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221052 | Correction of 6.2A.2 on UE MPR for CA | CR | ZTE Corporation | 38.521-1 17.3.0 CR#1572 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221106 | Correcting test applicabilities for MIMO test cases | CR | Huawei, Hisilicon | 38.521-1 17.3.0 CR#1573 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221107 | Correcting to NR test case 6.2A.1 MOP for CA | CR | Huawei, Hisilicon | 38.521-1 17.3.0 CR#1574 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221109 | Updating test case 6.2.3 AMPR for NS_03 and NS_03U | CR | Huawei, Hisilicon | 38.521-1 17.3.0 CR#1576 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221266 | Correction of in-band emissions test cases | CR | ROHDE & SCHWARZ | 38.521-1 17.3.0 CR#1604 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221267 | Correction of SRS time mask test case | CR | ROHDE & SCHWARZ | 38.521-1 17.3.0 CR#1605 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221322 | Update for 6.5C.3.3 Additional spurious emissions for SUL | CR | Qualcomm Korea | 38.521-1 17.3.0 CR#1606 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221323 | Editorial correction to clause 6.5.3.2 and 6.5.3.3 |
CR revised to R5-221682 |
Qualcomm Korea | 38.521-1 17.3.0 CR#1607 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
revised | [WTS] [JSN] |
R5-221365 | Introduction of AMPR modification in n30 | CR | Apple Portugal | 38.521-1 17.3.0 CR#1614 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
withdrawn | [WTS] [JSN] |
R5-221675 | Correction of test applicability of A-MPR |
CR revision of R5-220064 |
CAICT | 38.521-1 17.3.0 CR#14801 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221676 | Alignment of test points of ACLR with MPR |
CR revision of R5-220405 |
CAICT | 38.521-1 17.3.0 CR#15281 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221677 | Corrections of Tx TCs having impact on ETSI EN 301 908-25 |
CR revision of R5-220770 |
China Unicom | 38.521-1 17.3.0 CR#15391 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221678 | Correction to note of general spurious emissions |
CR revision of R5-220892 |
Anritsu | 38.521-1 17.3.0 CR#15571 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221679 | Correction to test requirement of 6.2.4 |
CR revision of R5-220898 |
Anritsu | 38.521-1 17.3.0 CR#15591 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221680 | Correction to measurement timing for inter-band CA with FDD and TDD |
CR revision of R5-220901 |
Anritsu | 38.521-1 17.3.0 CR#15621 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221681 | Editorial correction to SUL test cases |
CR revision of R5-220907 |
Anritsu | 38.521-1 17.3.0 CR#15651 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
R5-221682 | Editorial correction to clause 6.5.3.2 and 6.5.3.3 |
CR revision of R5-221323 |
Qualcomm Korea | 38.521-1 17.3.0 CR#16071 catF | 5GS_NR_LTE-UEConTest | Rel-17 |
R5-94-e AI: 5.3.1.4.1 |
agreed | [WTS] [JSN] |
43 documents (0.33518815040588 seconds)