Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R5-255961 | ICS for Rel-16 FR1 intra-band CA and 2-band CA | CR | Nokia | 38.508-2 19.1.0 CR#885 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-19 |
R5-109 AI: 5.3.1.2 |
agreed | [WTS] [JSN] |
| R5-256321 | Removal of pending R16 EN-DC configurations including FR1 and FR2 from implementation capabilities |
CR revised to R5-256976 |
ZTE Corporation | 38.508-2 19.1.0 CR#897 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-19 |
R5-109 AI: 5.3.1.2 |
revised | [WTS] [JSN] |
| R5-256322 | Corrections on supported release for three bands EN-DC configuration | CR | ZTE Corporation | 38.508-2 19.1.0 CR#898 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-19 |
R5-109 AI: 5.3.1.2 |
agreed | [WTS] [JSN] |
| R5-256371 | Adding PICS for R16 CA configurations | CR | Huawei, HiSilicon | 38.508-2 19.1.0 CR#903 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-19 |
R5-109 AI: 5.3.1.2 |
agreed | [WTS] [JSN] |
| R5-256976 | Removal of pending R16 EN-DC configurations including FR1 and FR2 from implementation capabilities |
CR revision of R5-256321 |
ZTE Corporation | 38.508-2 19.1.0 CR#8971 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-19 |
R5-109 AI: 5.3.1.2 |
withdrawn | [WTS] [JSN] |
5 documents (0.38517308235168 seconds)