Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R5-220039 Updated the related RRC information for DSS CR

revised to R5-221670

CMCC 38.508-1 17.3.0 CR#2167 catF 5GS_NR_LTE-UEConTest Rel-17 R5-94-e

AI: 5.3.1.1.4

revised [WTS] [JSN]
R5-220247 Added FR2 connection diagram using modulated interferer CR

revised to R5-221671

Keysight Technologies UK Ltd 38.508-1 17.3.0 CR#2190 catF 5GS_NR_LTE-UEConTest Rel-17 R5-94-e

AI: 5.3.1.1.4

revised [WTS] [JSN]
R5-220248 Correct TDD pattern for FR2 RF 60kHz SCS CR Keysight Technologies UK Ltd 38.508-1 17.3.0 CR#2191 catF 5GS_NR_LTE-UEConTest Rel-17 R5-94-e

AI: 5.3.1.1.4

agreed [WTS] [JSN]
R5-220778 Correction of 4.1.1 on removal of lower humidity limit in NR test environment CR

revised to R5-221672

Samsung R&D Institute UK, ZTE Corporation 38.508-1 17.3.0 CR#2244 catF 5GS_NR_LTE-UEConTest Rel-17 R5-94-e

AI: 5.3.1.1.4

revised [WTS] [JSN]
R5-220925 Correction to radioLinkMonitoringConfig for Scell CR Anritsu 38.508-1 17.3.0 CR#2260 catF 5GS_NR_LTE-UEConTest Rel-17 R5-94-e

AI: 5.3.1.1.4

withdrawn [WTS] [JSN]
R5-221066 Discussion on the lower humidity limit in temperature test environment discussion ZTE Corporation, Samsung R&D Institute UK R5-94-e

AI: 5.3.1.1.4

noted [WTS] [JSN]
R5-221349 Add new messages and procedure for test function to limit Pcell Power CR

revised to R5-221660

Apple Portugal 38.508-1 17.3.0 CR#2288 catF 5GS_NR_LTE-UEConTest Rel-17 R5-94-e

AI: 5.3.1.1.4

revised [WTS] [JSN]
R5-221620 Add new messages and procedure for test function to limit Pcell Power draftCR

revised to R5-221920

Apple Portugal 5GS_NR_LTE-UEConTest Rel-17 R5-94-e

AI: 5.3.1.1.4

revised [WTS] [JSN]
R5-221660 Add new messages and procedure for test function to limit Pcell Power CR

revision of R5-221349

Apple Portugal 38.508-1 17.3.0 CR#22881 catF 5GS_NR_LTE-UEConTest Rel-17 R5-94-e

AI: 5.3.1.1.4

withdrawn [WTS] [JSN]
R5-221670 Updated the related RRC information for DSS CR

revision of R5-220039

CMCC 38.508-1 17.3.0 CR#21671 catF 5GS_NR_LTE-UEConTest Rel-17 R5-94-e

AI: 5.3.1.1.4

agreed [WTS] [JSN]
R5-221671 Added FR2 connection diagram using modulated interferer CR

revision of R5-220247

Keysight Technologies UK Ltd 38.508-1 17.3.0 CR#21901 catF 5GS_NR_LTE-UEConTest Rel-17 R5-94-e

AI: 5.3.1.1.4

agreed [WTS] [JSN]
R5-221672 Correction of 4.1.1 on removal of lower humidity limit in NR test environment CR

revision of R5-220778

Samsung R&D Institute UK, ZTE Corporation 38.508-1 17.3.0 CR#22441 catF 5GS_NR_LTE-UEConTest Rel-17 R5-94-e

AI: 5.3.1.1.4

agreed [WTS] [JSN]
R5-221920 Add new messages and procedure for test function to limit Pcell Power draftCR

revision of R5-221620

Apple Portugal 5GS_NR_LTE-UEConTest Rel-17 R5-94-e

AI: 5.3.1.1.4

endorsed [WTS] [JSN]

13 documents (0.34745192527771 seconds)