Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S3-221763 New Solution for Security of Layer-2 based UE-to-UE Relay pCR InterDigital, Europe, Ltd. 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-221764 New solution: Restricted Peer UE IP Discovery with Layer-3 UE-to-UE Relay pCR

revised to S3-222364

InterDigital, Europe, Ltd. 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-221765 New solution: Privacy for Layer-3 UE-to-UE Relay based on IP routing pCR

revised to S3-222365

InterDigital, Europe, Ltd. 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-221831 A new solution for security mechanism for UE-to-UE Relay discovery pCR Qualcomm Incorporated 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-221832 A new solution for security mechanism for UE-to-UE Relay discovery in case of multiple ProSe services for an RSC pCR Qualcomm Incorporated 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-221833 A new solution for secure PC5 link establishment for UE-to-UE relay pCR Qualcomm Incorporated 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-221839 Key issue for secure ProSe multi-path transmission for UE-to-Network relay pCR Samsung 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-221912 New solution for PC5 link security when UE-to-UE relay is in coverage pCR

revised to S3-222354

Ericsson 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-221913 New solution for PC5 link security when UE-to-UE relay is out of coverage pCR

revised to S3-222355

Ericsson 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-221921 Solution for PC5 link security establishment for U2U Relay pCR

revised to S3-222402

China Telecom Corporation Ltd. 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-221924 New Solution UE-to-UE security pCR

revised to S3-222296

Philips International B.V. 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-221926 Solution for U2U Relay (model A) discovery security pCR China Telecom Corporation Ltd. 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-221927 Architectural assumption on out-of-coverage operation of UE-to-UE relay pCR Philips International B.V. 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

approved [WTS] [JSN]
S3-221929 New Key Issue on path switching between different N3IWFs pCR KPN N.V. 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-221930 Solution for U2U Relay (model B) discovery security pCR China Telecom Corporation Ltd. 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-221969 New solution on authentication procedure of UE-to-UE relay pCR OPPO 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-221971 New solution on end-to-end security establishmet for UE-to-UE relay pCR OPPO 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

withdrawn [WTS] [JSN]
S3-221979 new KI on Identity verification for UE-to-UE relay scenarios pCR OPPO 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

withdrawn [WTS] [JSN]
S3-222052 Update of KI#2 pCR

revised to S3-222306

OPPO 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-222053 New KI on U2U relay protection of remote UE traffic pCR OPPO 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-222054 New Solution on security negotiation of U2U relay protection of remote UE traffic pCR OPPO 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-222081 New Key Issue on Security and privacy of path switching between two indirect network communication paths for UE-to-Network Relaying pCR

revised to S3-222378

Huawei, HiSilicon 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-222082 New Key Issue on Security and privacy of path switch between L2 U2NW and direct connections pCR

revised to S3-222379

Huawei, HiSilicon 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-222083 New Key Issue on Security and privacy of multi-path transmission for UE-to-Network Relay pCR

revised to S3-222380

Huawei, HiSilicon 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-222188 New key issue on Identity verification for UE-to-UE relay scenarios pCR OPPO 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-222189 New solution on end-to-end security establishmet for UE-to-UE relay pCR

revised to S3-222341

OPPO 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-222216 New solution on Network-assisted Security Establishment Procedure for 5G ProSe Layer-3 UE-to-UE Relay pCR Beijing Xiaomi Mobile Software 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-222217 New solution on Non-network-assisted Security Establishment Procedure for 5G ProSe Layer-3 UE-to-UE Relay pCR

revised to S3-222371

Beijing Xiaomi Mobile Software 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-222218 New solution on Restricted 5G ProSe UE-to-UE Relay Discovery Model A pCR

revised to S3-222372

Beijing Xiaomi Mobile Software 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-222219 New solution on Restricted 5G ProSe UE-to-UE Relay Discovery Model B pCR

revised to S3-222373

Beijing Xiaomi Mobile Software 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

revised [WTS] [JSN]
S3-222296 New Solution UE-to-UE security pCR

revision of S3-221924

Philips International B.V. 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

approved [WTS] [JSN]
S3-222306 Update of KI#2 pCR

revision of S3-222052

OPPO 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

approved [WTS] [JSN]
S3-222341 New solution: End-to-end security establishment for Layer-2 UE-to-UE relay pCR

revision of S3-222189

OPPO 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

approved [WTS] [JSN]
S3-222344 TR 33.740 v0.2.0 Study on security aspects of Proximity Based Services (ProSe) in 5G System (5GS) phase 2 draft TR CATT FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

available [WTS] [JSN]
S3-222354 New solution for PC5 link security when UE-to-UE relay is in coverage pCR

revision of S3-221912

Ericsson 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

approved [WTS] [JSN]
S3-222355 New solution for PC5 link security when UE-to-UE relay is out of coverage pCR

revision of S3-221913

Ericsson 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

approved [WTS] [JSN]
S3-222364 New solution: Restricted Peer UE IP Discovery with Layer-3 UE-to-UE Relay pCR

revision of S3-221764

InterDigital, Europe, Ltd. 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

approved [WTS] [JSN]
S3-222365 New solution: Privacy for Layer-3 UE-to-UE Relay based on IP routing pCR

revision of S3-221765

InterDigital, Europe, Ltd. 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

approved [WTS] [JSN]
S3-222370 New solution on Network-assisted Security Establishment Procedure for 5G ProSe Layer-3 UE-to-UE Relay pCR Beijing Xiaomi Mobile Software 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

withdrawn [WTS] [JSN]
S3-222371 New solution on Non-network-assisted Security Establishment Procedure for 5G ProSe Layer-3 UE-to-UE Relay pCR

revision of S3-222217

Beijing Xiaomi Mobile Software 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

approved [WTS] [JSN]
S3-222372 New solution on Restricted 5G ProSe UE-to-UE Relay Discovery Model A pCR

revision of S3-222218

Beijing Xiaomi Mobile Software 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

approved [WTS] [JSN]
S3-222373 New solution on Restricted 5G ProSe UE-to-UE Relay Discovery Model B pCR

revision of S3-222219

Beijing Xiaomi Mobile Software 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

approved [WTS] [JSN]
S3-222378 New Key Issue on Security and privacy of path switching between two indirect network communication paths for UE-to-Network Relaying pCR

revision of S3-222081

Huawei, HiSilicon 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-222379 New Key Issue on Security and privacy of path switch between L2 U2NW and direct connections pCR

revision of S3-222082

Huawei, HiSilicon 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-222380 New Key Issue on Security and privacy of multi-path transmission for UE-to-Network Relay pCR

revision of S3-222083

Huawei, HiSilicon 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

noted [WTS] [JSN]
S3-222402 Solution for PC5 link security establishment for U2U Relay pCR

revision of S3-221921

China Telecom Corporation Ltd. 33.74 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S3-108-e

AI: 5.3

approved [WTS] [JSN]

46 documents (0.34256601333618 seconds)