Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-2304268 | Views on Interference Cancellation Feasibility in Sub-Band Full Duplex Operation for FR-2 Base Stations | discussion | Intel Corporation | FS_NR_duplex_evo | Rel-18 |
R4-106-bis-e AI: 5.20.2.2.2 |
noted | [WTS] [JSN] | |
R4-2304545 | TP to TR 38.858 section 10.5 Feasibility of FR2 Wide Area BS aspects | pCR | Ericsson | 38.858 0.2.0 | FS_NR_duplex_evo | Rel-18 |
R4-106-bis-e AI: 5.20.2.2.2 |
postponed | [WTS] [JSN] |
R4-2305204 | Discussion on implementation feasibility study of SBFD: FR2 BS Aspects | discussion | Samsung | FS_NR_duplex_evo | Rel-18 |
R4-106-bis-e AI: 5.20.2.2.2 |
noted | [WTS] [JSN] | |
R4-2305303 | Discussion on the feasibility of FR2 BS aspects | other | Huawei, HiSilicon |
R4-106-bis-e AI: 5.20.2.2.2 |
noted | [WTS] [JSN] |
4 documents (0.34608602523804 seconds)