Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2304192 study on feasibility at BS side discussion CMCC FS_NR_duplex_evo Rel-18 R4-106-bis-e

AI: 5.20.2.2.1

noted [WTS] [JSN]
R4-2304267 Views on Interference Cancellation Feasibility in Sub-Band Full Duplex Operation for FR-1 Base Stations discussion Intel Corporation FS_NR_duplex_evo Rel-18 R4-106-bis-e

AI: 5.20.2.2.1

noted [WTS] [JSN]
R4-2304431 TP for TR 38.858 Feasibility of FR1 Local Area BS aspects pCR CATT 38.858 0.3.0 FS_NR_duplex_evo Rel-18 R4-106-bis-e

AI: 5.20.2.2.1

noted [WTS] [JSN]
R4-2304433 Analysis on Local area BS feasibility for duplex evolution discussion CATT FS_NR_duplex_evo Rel-18 R4-106-bis-e

AI: 5.20.2.2.1

noted [WTS] [JSN]
R4-2304540 Discussion on BS RF feasibility for FR1 with TP to TR 38.858 other Nokia, Nokia Shanghai Bell FS_NR_duplex_evo Rel-18 R4-106-bis-e

AI: 5.20.2.2.1

noted [WTS] [JSN]
R4-2304543 TP to TR 38.858 section 10-1 Background for analysis pCR Ericsson 38.858 0.2.0 FS_NR_duplex_evo Rel-18 R4-106-bis-e

AI: 5.20.2.2.1

postponed [WTS] [JSN]
R4-2304544 TP to TR 38.858 section 10.2 Feasibility of FR1 Wide Area BS aspects pCR Ericsson 38.858 0.2.0 FS_NR_duplex_evo Rel-18 R4-106-bis-e

AI: 5.20.2.2.1

postponed [WTS] [JSN]
R4-2304882 TP to TR 38.858: feasibility of wide area BS aspects other Qualcomm CDMA Technologies Rel-18 R4-106-bis-e

AI: 5.20.2.2.1

postponed [WTS] [JSN]
R4-2304883 BS SBFD feasibility aspects other Qualcomm CDMA Technologies Rel-18 R4-106-bis-e

AI: 5.20.2.2.1

noted [WTS] [JSN]
R4-2305203 Discussion on implementation feasibility study of SBFD: FR1 BS Aspects discussion Samsung FS_NR_duplex_evo Rel-18 R4-106-bis-e

AI: 5.20.2.2.1

noted [WTS] [JSN]
R4-2305302 Discussion on the feasibility of FR1 BS aspects other Huawei, HiSilicon R4-106-bis-e

AI: 5.20.2.2.1

noted [WTS] [JSN]
R4-2305400 Further discussion on full duplex from FR1 BS perspective other ZTE Corporation R4-106-bis-e

AI: 5.20.2.2.1

noted [WTS] [JSN]

12 documents (0.34925103187561 seconds)