Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2315108 TP for TR 38.858“Feasibility of FR1 Local Area BS aspects” pCR

revised to R4-2316958

CATT 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

revised [WTS] [JSN]
R4-2315199 Discussion on SBFD BS RF requirement discussion CMCC FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

noted [WTS] [JSN]
R4-2315607 TP to TR 38.858: Summary for FR1 BS feasibility pCR Ericsson 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

noted [WTS] [JSN]
R4-2316298 TP to TR 38.858: Feasibility of FR1 MR BS pCR

revised to R4-2316959

Nokia, Nokia Shanghai Bell 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

revised [WTS] [JSN]
R4-2316299 TP to TR 38.858: Feasibility of FR1 LA BS pCR Nokia, Nokia Shanghai Bell 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

merged [WTS] [JSN]
R4-2316300 TP to TR 38.858: Feasibility of FR1 WA BS pCR Nokia, Nokia Shanghai Bell 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

merged [WTS] [JSN]
R4-2316301 Conclusions and TP on SBFD feasibility for FR1 base stations pCR Nokia, Nokia Shanghai Bell 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

noted [WTS] [JSN]
R4-2316384 TP to TR 38.858: Self-interference analysis for FR1 MR BS pCR Huawei, HiSilicon 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

merged [WTS] [JSN]
R4-2316385 TP to TR 38.858: Self-interference analysis for FR1 LA BS pCR Huawei, HiSilicon 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

merged [WTS] [JSN]
R4-2316528 Further discussion on full duplex from FR1 BS perspective other ZTE Corporation R4-108-bis

AI: 5.19.2.2.1

noted [WTS] [JSN]
R4-2316531 Maintenance TP to TR 38.858 Clause 9.3~9.4 pCR ZTE Corporation 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

approved [WTS] [JSN]
R4-2316602 SBFD implementation feasibility of FR1 BS and text proposal to TR 38.858 pCR

revised to R4-2316960

Samsung 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

revised [WTS] [JSN]
R4-2316958 TP for TR 38.858“Feasibility of FR1 Local Area BS aspects” pCR

revision of R4-2315108

CATT 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

approved [WTS] [JSN]
R4-2316959 TP to TR 38.858: Feasibility of FR1 MR BS pCR

revision of R4-2316298

Nokia, Nokia Shanghai Bell 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

approved [WTS] [JSN]
R4-2316960 SBFD implementation feasibility of FR1 BS and text proposal to TR 38.858 pCR

revision of R4-2316602

revised to R4-2317009

Samsung 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

revised [WTS] [JSN]
R4-2317009 SBFD implementation feasibility of FR1 BS and text proposal to TR 38.858 pCR

revision of R4-2316960

Samsung 38.858 1.0.0 FS_NR_duplex_evo Rel-18 R4-108-bis

AI: 5.19.2.2.1

approved [WTS] [JSN]

16 documents (0.34057307243347 seconds)