Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-1700063 | General discussion of UL power control for NR | other | Huawei, HiSilicon |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700064 | Detailed considerations on UL power control design for NR | other | Huawei, HiSilicon |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700085 | Discussion on system-level calibration for NR-MIMO | other | Huawei, HiSilicon |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700086 | Discussion on link-level calibration for NR-MIMO | other | Huawei, HiSilicon |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700142 | Discussion on UL power control for NR | other | ZTE, ZTE Microelectronics |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700144 | Further clarification on assumptions for Phase 1 NR MIMO calibration | other | ZTE, ZTE Microelectronics |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700236 | NR MIMO calibration results | discussion | CATT |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700287 | NR MIMO calibration results | discussion | Spreadtrum Communications | Rel-14 |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | ||
R1-1700358 | Discussion on UL Power Control | discussion | Intel Corporation | Rel-14 |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | ||
R1-1700395 | Summary of 87-30 email discussion on NR MIMO calibration |
other revised to R1-1701191, R1-1701490 |
ZTE, ZTE Microelectronics |
R1-ah-18511 AI: 5.1.2.4 |
revised | [WTS] [JSN] | |||
R1-1700439 | Phase 1 calibration results for NR MIMO | other | CMCC |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700488 | Phase I SLS calibration results for NR MIMO | discussion | LG Electronics |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700489 | Phase II SLS calibration results for NR MIMO |
discussion revised to R1-1701219 |
LG Electronics |
R1-ah-18511 AI: 5.1.2.4 |
revised | [WTS] [JSN] | |||
R1-1700490 | Phase I LLS calibration results for NR MIMO | discussion | LG Electronics |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700491 | Phase II LLS calibration results for NR MIMO | discussion | LG Electronics |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700492 | Discussion on UL power control for NR | discussion | LG Electronics |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700553 | Uplink power control for NR | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700601 | Uplink power control considering waveform switching | discussion | NTT DOCOMO, INC. |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700602 | System-level calibration result for NR MIMO | discussion | NTT DOCOMO, INC. |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700603 | Discussion on mobility model for MIMO phase-3 calibration | discussion | NTT DOCOMO, INC. |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700656 | System Level Simulation Result for NR MIMO Calibration – Phase I | other | Fujitsu |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700772 | On forming wide beams | other | Ericsson |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700773 | NR MIMO Phase 1 SNR system level calibration results for above 6 GHz | other | Ericsson |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700774 | NR MIMO Phase 1 SNR system level calibration results for below 6 GHz | other | Ericsson |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700775 | Phase 1 NR MIMO LLS Calibration Results | other | Ericsson |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700776 | Phase 3 NR MIMO calibration results |
other revised to R1-1701184 |
Ericsson |
R1-ah-18511 AI: 5.1.2.4 |
revised | [WTS] [JSN] | |||
R1-1700782 | NR MIMO Link Level Phase 2 Calibration Results | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700783 | NR MIMO System Level Phase 2 Calibration Results | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700812 | Phase 1 and Phase 2 calibration results for sub6GHz | discussion | Qualcomm Incorporated |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700813 | Phase 1 and Phase 2 calibration results for above 6GHz |
discussion revised to R1-1701438 |
Qualcomm Incorporated |
R1-ah-18511 AI: 5.1.2.4 |
revised | [WTS] [JSN] | |||
R1-1700848 | Initial Calibration Results of NR MIMO | discussion | CATR |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700850 | Simulation results on Phase 1 NR MIMO calibration | other | ZTE, ZTE Microelectronics |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700851 | Simulation results on Phase 2 NR MIMO calibration | other | ZTE, ZTE Microelectronics |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700868 | UL power control in multi-beam based approaches | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700935 | MIMO Phase-2 LLS calibration results on 4GHz frequency band | other | Samsung |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700936 | MIMO Phase-1 SLS calibration results on 30GHz frequency band | other | Samsung |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700937 | MIMO Phase-1 LLS calibration results on 30GHz frequency band | other | Samsung |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700938 | MIMO Phase-2 SLS calibration results on 30GHz frequency band | other | Samsung |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700939 | MIMO Phase-2 LLS calibration results on 30GHz frequency band | other | Samsung |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1700940 | UL power control aspects | other | Samsung |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1701108 | Dynamic network coordination for URLLC in the 5G New Radio | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1701109 | Power control for MIMO | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1701191 | Summary of 87-30 email discussion on NR MIMO calibration |
other revision of R1-1700395 |
ZTE, ZTE Microelectronics |
R1-ah-18511 AI: 5.1.2.4 |
withdrawn | [WTS] [JSN] | |||
R1-1701219 | Phase II SLS calibration results for NR MIMO |
discussion revision of R1-1700489 |
LG Electronics |
R1-ah-18511 AI: 5.1.2.4 |
available | [WTS] [JSN] | |||
R1-1701401 | WF on UL Power Control | discussion | Huawei, HiSilicon |
R1-ah-18511 AI: 5.1.2.4 |
withdrawn | [WTS] [JSN] | |||
R1-1701438 | Phase 1 and Phase 2 calibration results for above 6GHz |
discussion revision of R1-1700813 |
Qualcomm Incorporated |
R1-ah-18511 AI: 5.1.2.4 |
withdrawn | [WTS] [JSN] | |||
R1-1701453 | WF on uplink power control |
discussion revised to R1-1701513 |
Nokia |
R1-ah-18511 AI: 5.1.2.4 |
revised | [WTS] [JSN] | |||
R1-1701490 | Summary of email discussion [87-30] on NR-MIMO calibration |
discussion revision of R1-1700395 revised to R1-1701517 |
ZTE, ZTE Microelectronics |
R1-ah-18511 AI: 5.1.2.4 |
revised | [WTS] [JSN] | |||
R1-1701513 | WF on uplink power control |
discussion revision of R1-1701453 |
Nokia, ASB, Huawei, Intel, KDDI, NTT DOCOMO, Samsung, SoftBank |
R1-ah-18511 AI: 5.1.2.4 |
noted | [WTS] [JSN] | |||
R1-1701516 | WF on MIMO calibration | discussion | NTT DOCOMO, ZTE, ZTE Microelectronics, LG Electronics, Samsung, Xinwei, Spreadtrum, ETRI |
R1-ah-18511 AI: 5.1.2.4 |
noted | [WTS] [JSN] | |||
R1-1701517 | Summary of email discussion [87-30] on NR-MIMO calibration |
discussion revision of R1-1701490 |
ZTE, ZTE Microelectronics |
R1-ah-18511 AI: 5.1.2.4 |
agreed | [WTS] [JSN] | |||
R1-1701526 | NR MIMO Phase 1 and Phase 2 calibration results | discussion | ZTE, ZTE Microelectronics |
R1-ah-18511 AI: 5.1.2.4 |
agreed | [WTS] [JSN] |
52 documents (0.35062909126282 seconds)