Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-160408 | Measurement reporting in NB-IOT | discussion | CMCC | NB_IOT-Core | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
noted | [WTS] [JSN] | |
R2-160414 | NB-IoT Support for Re-establishment | discussion | ZTE Corporation | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
available | [WTS] [JSN] | ||
R2-160415 | RRC aspects for NB-IoT signaling optimization solution | discussion | ZTE Corporation | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
available | [WTS] [JSN] | ||
R2-160425 | Creation of 36.331 running CR | discussion | Neul Limited, Huawei, Hisilicon | NB_IOT-Core | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
postponed | [WTS] [JSN] | |
R2-160426 | Miscellaneous aspects for 36.331 | discussion | Neul Limited | NB_IOT-Core | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
noted | [WTS] [JSN] | |
R2-160430 | 36.331 Running CR to implement Stage 3 Agreements on NB-IoT | draftCR | Huawei | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
postponed | [WTS] [JSN] | ||
R2-160439 | Radio Link Failure criteria and procedures | discussion | Intel Corporation | NB_IOT-Core | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
noted | [WTS] [JSN] | |
R2-160440 | RAN impacts to enable CIoT optimizations | discussion | Intel Corporation | NB_IOT-Core | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
available | [WTS] [JSN] | |
R2-160454 | Interaction between solution 2 and 18 | discussion | CATT | NB_IOT-Core | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
noted | [WTS] [JSN] | |
R2-160466 | Measurement reporting in NB-IOT | draftCR | Ericsson | NB_IOT-Core | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
postponed | [WTS] [JSN] | |
R2-160467 | Measurement reporting in NB-IOT | discussion | Ericsson, China Mobile Com. Corporation | NB_IOT-Core | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
noted | [WTS] [JSN] | |
R2-160479 | NB-IOT - RRC connection control | discussion | Ericsson | NB_IOT-Core | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
noted | [WTS] [JSN] | |
R2-160481 | NB-IoT RRC connection establishment principles | discussion | QUALCOMM INCORPORATED | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
noted | [WTS] [JSN] | ||
R2-160483 | NB-IoT cell load management | discussion | QUALCOMM INCORPORATED | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
available | [WTS] [JSN] | ||
R2-160492 | RRC connection re-establishment in NB-IoT | discussion | Nokia Networks | NB_IOT-Core | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
available | [WTS] [JSN] | |
R2-160506 | NB-IOT - RRC Procedures | discussion | MediaTek Inc. | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
available | [WTS] [JSN] | ||
R2-160511 | Establishment cause value in Solution 2 and 18 | discussion | NEC | NB_IOT-Core | Rel-13 |
R2-ah-31965 AI: 5.1.1 |
available | [WTS] [JSN] |
17 documents (0.34474515914917 seconds)