Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2513089 Discussion on remaining issues of core requirements maintenance for RRM Phase 5 other OPPO NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

noted [WTS] [JSN]
R4-2513212 Discussion on the maintenance of RRM core requirements of NR RRM Ph5 discussion CATT NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

noted [WTS] [JSN]
R4-2513362 Discussion on RRM core requirements maintenance for NR RRM Phase 5 discussion China Telecom NR_RRM_Ph5-Core R4-116-bis

AI: 4.15.1

noted [WTS] [JSN]
R4-2513467 Discussion on FR2-1 L3 measurement delay by optimising CSSF outside gap in CA/DC discussion Huawei, HiSilicon NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

noted [WTS] [JSN]
R4-2513478 Draft CR on L3 measurement delay by utilising 3-searcher solution to optimise CSSF outside gap for Rel-19 draftCR Huawei, HiSilicon NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

endorsed [WTS] [JSN]
R4-2513501 On maintenance issues for RRM enh5 discussion vivo R4-116-bis

AI: 4.15.1

noted [WTS] [JSN]
R4-2513610 On core part maintenance for RRM phase 5 discussion Apple NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

noted [WTS] [JSN]
R4-2513712 draftCR on CSSF optimization solutions draftCR Nokia, Nokia Shanghai Bell NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

endorsed [WTS] [JSN]
R4-2513736 Discussion on RRM core requirements for FR2-1 SSB based L3 measurement delay reduction discussion CMCC R4-116-bis

AI: 4.15.1

noted [WTS] [JSN]
R4-2513881 Discussion on maintenance of R19 RRM FBS enhancements discussion ZTE Corporation, Sanechips NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

noted [WTS] [JSN]
R4-2513899 Discussion on the fast SCell activation for UE supporting Rel-18 EMR other ZTE Corporation, Sanechips NR_RRM_Ph5-Core R4-116-bis

AI: 4.15.1

noted [WTS] [JSN]
R4-2514037 Draft CR on solution 1 of R19 CSSF enh draftCR ZTE Corporation, Sanechips NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

endorsed [WTS] [JSN]
R4-2514038 Draft CR on R19 FBS enh draftCR

revised to R4-2514860

ZTE Corporation, Sanechips NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

endorsed [WTS] [JSN]
R4-2514065 Discussion on RRM core requirements on FR2-1 L3 measurement delay discussion Ericsson NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

noted [WTS] [JSN]
R4-2514071 (NR_RRM_Ph5-Core) CR on on Intra-frequency and inter-frequency cell identification for UE supporting L3 fast beam sweeping operation in FR2-1 draftCR Ericsson NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

postponed [WTS] [JSN]
R4-2514257 On remaining core requirements for RRM Phase 5 discussion Nokia NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

noted [WTS] [JSN]
R4-2514322 Fast SCell activation based on Rel-18 eEMR discussion Qualcomm Incorporated NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

noted [WTS] [JSN]
R4-2514401 Discussion on core part for FR2-1 SSB based L3 measurement delay reduction discussion MediaTek inc. NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

noted [WTS] [JSN]
R4-2514860 Draft CR on R19 FBS enh draftCR

revision of R4-2514038

ZTE Corporation, Sanechips NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

withdrawn [WTS] [JSN]
R4-2514873 Draft big CR on core maintenance for NR_RRM_Ph5 draftCR Ericsson, CATT NR_RRM_Ph5-Core Rel-19 R4-116-bis

AI: 4.15.1

endorsed [WTS] [JSN]

20 documents (0.3477840423584 seconds)