Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-181777 | On the environmental conditions for FR2 |
discussion revised to R5-182040 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | ||
R5-181778 | Analysis of potential RRM 5G NR Test Scenarios for FR2 |
discussion revised to R5-182038 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | ||
R5-181779 | On the RRM Baseline Test Setup for FR2 |
discussion revised to R5-182039 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | ||
R5-181780 | Discussion of NR FR1 Test Point for TX Spurious Emission test cases |
discussion revised to R5-182019 |
Qualcomm Inc. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | |
R5-181781 | Discussion on test point selection for NR Frequency Error in FR1 |
discussion revised to R5-182024 |
KDDI Corporation | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | ||
R5-181785 | Considerations for P-Max of UE Maximum Output Power in 5G NR RF conformance spec TS 38.521-1 |
discussion revised to R5-182001 |
CMCC | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | |
R5-181843 | Discussion on NR FR2 RF test spec progress | discussion | CAICT | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | ||
R5-181849 | Discussion on test procedure for waveform selection for NSA |
discussion revised to R5-182012 |
Ericsson | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | ||
R5-181859 | On the treatment of the low frequency range for FR2 Spurious Test | discussion | Anritsu |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | |||
R5-181860 | Proposal on the FR2 TRx spurious test procedure |
discussion revised to R5-182032 |
Anritsu |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | |||
R5-181861 | Proposal for uncertainty of Sub-6GHz NR TRx tests |
discussion revised to R5-182034 |
Anritsu |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | |||
R5-181862 | On the LTE anchor link power level for TRx OTA tests |
discussion revised to R5-182090 |
Anritsu |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | |||
R5-181863 | On extreme condition test for FR2 TRx | discussion | Anritsu |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | |||
R5-181865 | Priority of the RF test cases about MU and TT discussion | discussion | NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | |
R5-181866 | Priority of the test setup about defining MU |
discussion revised to R5-182007 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | |
R5-181867 | Time plan for defining MU and TT for RF tests |
discussion revised to R5-182092 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | |
R5-181868 | Remaining issue about defining FR2 Test Tolerance | discussion | NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | |
R5-181875 | Test Tolerance defining approach about FR2 RF tests | discussion | NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | |
R5-181876 | Applicability of the shared risk principle for FR2 RF tests | discussion | NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | |
R5-181878 | Testing time estimation about FR2 RF tests | discussion | NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | |
R5-181879 | Discussion on test point selection for NR In-Band in FR1 | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-181880 | Discussion on test point selection for NR ACS in FR1 | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-181881 | Overview Of TRP uncertainty vs sampling grid at mmWave | agenda | MVG Industries |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | |||
R5-181888 | Discussion on handling of test point analysis | discussion | Ericsson LM | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | |
R5-181901 | Basic assumptions for the FR2 MU and TT work |
discussion revised to R5-182006 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | ||
R5-181905 | Discussion on test point selection for NR Occupied Bandwidth in FR2 | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-181906 | Discussion on test point selection for NR SEM in FR2 |
discussion revised to R5-182028 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | ||
R5-181907 | Discussion on test point selection for NR ACLR in FR2 |
discussion revised to R5-182030 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | ||
R5-181908 | Discussion on test point selection for NR In-Band blocking in FR2 |
discussion revised to R5-182042 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | |
R5-181910 | Discussion on test point selection for NR ACS in FR2 |
discussion revised to R5-182044 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | ||
R5-181911 | Handling of the Extreme condition about FR2 RF tests | discussion | NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
withdrawn | [WTS] [JSN] | |
R5-181918 | Discussion on test procedure for NR Occupied Bandwidth in FR2 | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-181919 | Discussion on test procedure for NR SEM in FR2 | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-181920 | Discussion on test procedure for NR ACLR in FR2 | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-181928 | Discussion on MU in NR FR2 | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | ||
R5-181929 | Comparison of NR UL Signal CCDFs | discussion | Intel Deutschland GmbH | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | |
R5-181930 | Discussion on how to consider permitted testing methodologies within test procedures in TS 38.521-2 | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | ||
R5-181931 | Discussion on how to consider UE antenna implementation versus permitted test method |
discussion revised to R5-182033 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | ||
R5-181938 | Discussion on test point selection for NR Frequency Error in FR1 |
discussion revised to R5-182025 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | ||
R5-181940 | Discussion paper on test procedure for mmWave Demod testing |
discussion revised to R5-182036 |
Qualcomm Europe Inc.(France) | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | ||
R5-181941 | Discussion paper on signaling the RSRPB UE reporting requirements |
discussion revised to R5-182014 |
Qualcomm Europe Inc.(France) | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | ||
R5-182001 | Considerations for P-Max of UE Maximum Output Power in 5G NR RF conformance spec TS 38.521-1 |
discussion revision of R5-181785 revised to R5-182015 |
CMCC | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
revised | [WTS] [JSN] | |
R5-182006 | Basic assumptions for the FR2 MU and TT work |
discussion revision of R5-181901 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | ||
R5-182007 | Priority of the test setup about defining MU |
discussion revision of R5-181866 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | |
R5-182012 | Discussion on test procedure for waveform selection for NSA |
discussion revision of R5-181849 |
Ericsson | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-182014 | Discussion paper on signaling the RSRPB UE reporting requirements |
discussion revision of R5-181941 |
Qualcomm Europe Inc.(France) | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-182015 | Considerations for P-Max of UE Maximum Output Power in 5G NR RF conformance spec TS 38.521-1 |
discussion revision of R5-182001 |
CMCC | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | |
R5-182019 | Discussion of NR FR1 Test Point for TX Spurious Emission test cases |
discussion revision of R5-181780 |
Qualcomm Inc. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | |
R5-182024 | Discussion on test point selection for NR Frequency Error in FR1 |
discussion revision of R5-181781 |
KDDI Corporation | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-182025 | Discussion on test point selection for NR Frequency Error in FR1 |
discussion revision of R5-181938 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-182028 | Discussion on test point selection for NR SEM in FR2 |
discussion revision of R5-181906 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | ||
R5-182030 | Discussion on test point selection for NR ACLR in FR2 |
discussion revision of R5-181907 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-182032 | Proposal on the FR2 TRx spurious test procedure |
discussion revision of R5-181860 |
Anritsu |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | |||
R5-182033 | Discussion on how to consider UE antenna implementation versus permitted test method |
discussion revision of R5-181931 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | ||
R5-182034 | Proposal for uncertainty of Sub-6GHz NR TRx tests |
discussion revision of R5-181861 |
Anritsu |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | |||
R5-182036 | Discussion paper on test procedure for mmWave Demod testing |
discussion revision of R5-181940 |
Qualcomm Europe Inc.(France) | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-182038 | Analysis of potential RRM 5G NR Test Scenarios for FR2 |
discussion revision of R5-181778 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | ||
R5-182039 | On the RRM Baseline Test Setup for FR2 |
discussion revision of R5-181779 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
noted | [WTS] [JSN] | ||
R5-182040 | On the environmental conditions for FR2 |
discussion revision of R5-181777 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-182042 | Discussion on test point selection for NR In-Band blocking in FR2 |
discussion revision of R5-181908 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | |
R5-182044 | Discussion on test point selection for NR ACS in FR2 |
discussion revision of R5-181910 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | ||
R5-182090 | On the LTE anchor link power level for TRx OTA tests |
discussion revision of R5-181862 |
Anritsu |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] | |||
R5-182092 | Time plan for defining MU and TT for RF tests |
discussion revision of R5-181867 |
NTT DOCOMO, INC., Anritsu, CAICT, CMCC, Huawei, KDDI Corporation, Keysight Technologies UK Ltd, MVG Industries, PCTEST Engineering Lab, ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-32909 AI: 4.1.16 |
endorsed | [WTS] [JSN] |
63 documents (0.32985496520996 seconds)