Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-192992 | Remove unused DCI formats from 38.508-1 | CR | Ericsson | 38.508-1 15.3.0 CR#656 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193008 | Remove brackets from parameters for DCI formats for scheduling (0_1, 0_1, 1_0, 1_1) |
CR revised to R5-193272 |
Ericsson | 38.508-1 15.3.0 CR#657 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
revised | [WTS] [JSN] |
R5-193013 | Editorial correction to test frequency clauses | CR | Ericsson | 38.508-1 15.3.0 CR#658 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193049 | TDD-UL-DL-Config for FR1 SCS 60kHz |
CR revised to R5-193273 |
Anritsu | 38.508-1 15.3.0 CR#659 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
revised | [WTS] [JSN] |
R5-193051 | Updates to Address the Permitted OTA Test Methods | CR | PCTEST Engineering Lab | 38.508-1 15.3.0 CR#660 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
withdrawn | [WTS] [JSN] |
R5-193071 | Updated IE MeasObjectEUTRA and ReportConfigInterRAT | CR | Bureau Veritas, MCC TF160 | 38.508-1 15.3.0 CR#661 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193095 | Update IE PDSCH-Config |
CR revised to R5-193274 |
Ericsson | 38.508-1 15.3.0 CR#662 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
revised | [WTS] [JSN] |
R5-193142 | Connection diagram for 1x2 Demod test cases | CR | Qualcomm Korea | 38.521-4 15.0.0 CR#23 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
withdrawn | [WTS] [JSN] |
R5-193143 | Connection diagram for 1x2 Demod test cases |
CR revised to R5-193431 |
Qualcomm Korea | 38.508-1 15.3.0 CR#664 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
revised | [WTS] [JSN] |
R5-193163 | Update 38.508 RF and RRM clauses with agreed recommendation to configure UE as non-IMS |
CR revised to R5-193275 |
Qualcomm UK Ltd | 38.508-1 15.3.0 CR#665 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
revised | [WTS] [JSN] |
R5-193165 | Adding setup diagram for Receiver performance tests 2x2 | CR | Ericsson | 38.508-1 15.3.0 CR#666 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193166 | Introduction of test frequencies for inter-band Rel-15 EN-DC (two bands) configurations |
CR revised to R5-193276 |
Ericsson | 38.508-1 15.3.0 CR#667 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
revised | [WTS] [JSN] |
R5-193170 | Correction of Setup Diagrams for Receiver tests using Signal Generator in 38.508-1 |
CR revised to R5-193487 |
CAICT | 38.508-1 15.3.0 CR#670 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
revised | [WTS] [JSN] |
R5-193172 | Common procedure to configure SCC for CA RF testing. |
CR revised to R5-193277 |
Ericsson | 38.508-1 15.3.0 CR#672 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
revised | [WTS] [JSN] |
R5-193174 | Update of test frequencies for EN-DC combination DC_41A_n41A | CR | Ericsson | 38.508-1 15.3.0 CR#673 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193175 | Update K2 value to align with RF DL RMC |
CR revised to R5-193432 |
Keysight Technologies UK Ltd | 38.508-1 15.3.0 CR#674 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
revised | [WTS] [JSN] |
R5-193177 | Update aggregationlevel2 in SearchSpace IE | CR | Keysight Technologies UK Ltd | 38.508-1 15.3.0 CR#675 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193193 | Antenna Connection diagram for TE part for RRM | CR | Ericsson | 38.508-1 15.3.0 CR#676 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193272 | Remove brackets from parameters for DCI formats for scheduling |
CR revision of R5-193008 |
Ericsson | 38.508-1 15.3.0 CR#6571 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193273 | TDD-UL-DL-Config for FR1 SCS 60kHz |
CR revision of R5-193049 |
Anritsu | 38.508-1 15.3.0 CR#6591 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193274 | Update IE PDSCH-Config |
CR revision of R5-193095 |
Ericsson | 38.508-1 15.3.0 CR#6621 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193275 | Update 38.508 RF and RRM clauses with agreed recommendation to configure UE as non-IMS |
CR revision of R5-193163 |
Qualcomm UK Ltd | 38.508-1 15.3.0 CR#6651 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193276 | Introduction of test frequencies for inter-band Rel-15 EN-DC two bands configurations |
CR revision of R5-193166 |
Ericsson | 38.508-1 15.3.0 CR#6671 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193277 | Common procedure to configure SCC for CA RF testing. |
CR revision of R5-193172 |
Ericsson | 38.508-1 15.3.0 CR#6721 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193308 | Update IE MIB | CR | Ericsson, Anritsu | 38.508-1 15.3.0 CR#677 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193309 | Update IE SchedulingRequestResourceConfig | CR | Ericsson, Anritsu | 38.508-1 15.3.0 CR#678 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193310 | Update IE SubcarrierSpacing | CR | Ericsson, Anritsu | 38.508-1 15.3.0 CR#679 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193431 | Connection diagram for 1x2 Demod test cases |
CR revision of R5-193143 |
Qualcomm Korea | 38.508-1 15.3.0 CR#6641 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193432 | Update K2 value to align with RF DL RMC |
CR revision of R5-193175 |
Keysight Technologies UK Ltd | 38.508-1 15.3.0 CR#6741 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
R5-193487 | Correction of Setup Diagrams for Receiver tests using Signal Generator in 38.508-1 |
CR revision of R5-193170 |
CAICT | 38.508-1 15.3.0 CR#6701 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-35450 AI: 4.1.1 |
agreed | [WTS] [JSN] |
30 documents (0.30152106285095 seconds)