Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R3-180028 | Correction on Split SRB configuration |
discussion revised to R3-180960 |
ZTE |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |||
R3-180030 | Correction of Split SRB configuration in TS36.423 |
draftCR revised to R3-180961 |
ZTE | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180031 | Consideration on SCG configuration in case of option 2x configuration | discussion | ZTE |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |||
R3-180032 | Correction of SCG configuration in case of option 2x configuration in TS37.340 | draftCR | ZTE | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180033 | Correction of UL link configuration in TS36.423 |
draftCR revised to R3-180963 |
ZTE | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180053 | Correction of the UE ID in the RRC Transfer | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180054 | Addition of the report type in the RRC Transfer | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180055 | Signaling at PDCP-Count wraparound in Secondary Node | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180056 | Correction of counter Check procedure for EN-DC |
draftCR revised to R3-180536 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180057 | RLC re-establishment indication at switching on a split bearer | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180058 | Addition of the indication of the RLC re-establishment | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180059 | Editorial corrections of X2AP | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
withdrawn | [WTS] [JSN] | |
R3-180102 | Stage 2 alignment for NSA Energy Savings |
draftCR revised to R3-180531 |
Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180119 | Corrections for UE Context Management | discussion | ZTE Corporation |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |||
R3-180121 | Corrections on UE Context Management for TS38.473 | draftCR | ZTE Corporation | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180132 | Discussion on PCell/PScell/Scell management in CU-DU deployment | discussion | ZTE Corporation |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |||
R3-180137 | Discussion on SCG failure | discussion | CATT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | ||
R3-180138 | Support of SCG failure handling | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180148 | EN-DC X2 setup and configuration update leftovers | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180149 | Stage 3 CR for EN-DC X2 setup and configuration update leftovers | draftCR | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180161 | RRC Reconfiguration Complete Indication to DU | discussion | CATT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | ||
R3-180162 | Support of UE Reconfiguration Complete Message | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180163 | Support of UE Reconfiguration Complete Message | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180166 | Discussion on SgNB initiated SgNB Modification procedure | discussion | CATT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | ||
R3-180167 | Correction on SgNB initiated SgNB Modification procedure |
draftCR revised to R3-180621 |
CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180168 | Correction on SgNB initiated SgNB Modification procedure |
draftCR revised to R3-180603 |
CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180169 | Discussion on intra-DU handover | discussion | CATT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | ||
R3-180170 | Correction on intra-DU handover | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180172 | Corrections on UE Context Setup procedure | discussion | Nokia, Nokia Shanghai Bell |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |||
R3-180173 | Corrections on UE Context Setup procedure |
draftCR revised to R3-180525 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180174 | Maximum number of F1 logical connections | discussion | Nokia, Nokia Shanghai Bell |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |||
R3-180175 | Maximum number of F1 logical connections | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180176 | Corrections on NR U-plane protocol |
discussion revised to R3-180589 |
Nokia, Nokia Shanghai Bell, KDDI, KT |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |||
R3-180177 | Corrections on NR U-plane protocol | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180178 | Correction on the definition of ProtocolIE-ContainerList | discussion | Nokia, Nokia Shanghai Bell |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |||
R3-180181 | Discussion on Downlink Data Delivery Status transfer | discussion | CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180182 | Correction on Downlink Data Delivery Status transfer | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180183 | Consideration on UE context management procedures for EN-DC |
discussion revised to R3-180513 |
CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180184 | Correction on UE context management procedures for EN-DC |
draftCR revised to R3-180514 |
CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180185 | Correction on the definition of ProtocolIE-ContainerList | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180207 | Criticality Diagnostics for Transaction ID | discussion | Nokia, Nokia Shanghai Bell |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |||
R3-180208 | Criticality Diagnostics for Transaction ID | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180213 | Add NR UE Security Capabilities to DL NAS Transport message |
draftCR revised to R3-180694 |
Qualcomm Incorporated, Vodafone | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] | |
R3-180218 | Stage 2 corrections for NSA ANR | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180219 | Corrections on NSA ANR | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180220 | Handling of remaining stage 3 FFSs for NSA ANR |
other revised to R3-180500 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180221 | X2 support for supplementary UL carrier | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180222 | Support for supplementary UL carrier |
draftCR revised to R3-180538 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180230 | Correction on supporting partial cell list | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180270 | Correction on UL configuration | discussion | NTT DOCOMO INC. | NR_newRAT |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | ||
R3-180272 | CR for UL configuration |
draftCR revised to R3-180537 |
NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180274 | Clarification on resource coordination | discussion | NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180275 | CR for Clarification on resource coordination | draftCR | NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180276 | Addition of cause | discussion | NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180277 | CR for addition of cause | draftCR | NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180278 | Neccesary addition on resource coodination | discussion | NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180279 | CR on neccesary addition on resource coodination | draftCR | NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180280 | clarification and correction on S1 for EN-DC |
draftCR revised to R3-180533 |
NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180281 | clarification and correction on X2 for EN-DC | draftCR | NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180289 | Essential corrections for EN-DC |
draftCR revised to R3-180532 |
Huawei, Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180292 | mandatory/optional IEs in 36.423 | discussion | NEC | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180293 | Activation/Deactivation indication in EN-DC X2 | discussion | NEC | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180296 | Adding MeNB UE X2AP ID Extension | draftCR | NEC | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180304 | Baseline CR to capture remaining FFS over X2 for EN-DC |
draftCR revised to R3-180535 |
Huawei, Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180307 | clarification and correction on U-plane for EN-DC | draftCR | NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180308 | Applicability on AMBR for F1 | discussion | NTT DOCOMO INC. | NR_newRAT |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | ||
R3-180309 | CR for applicability on AMBR for F1 | draftCR | NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180310 | Cell activation over configuration update | discussion | NTT DOCOMO INC. |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |||
R3-180311 | CR on Cell activation over configuration update | draftCR | NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180312 | clarification and correction on F1 for EN-DC | draftCR | NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180331 | Introduction of DRB ID for EN-DC |
draftCR revised to R3-180515 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180332 | Considerations on HRL | discussion | Huawei | NR_newRAT-Core |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | ||
R3-180333 | Clarification on HRL for EN-DC |
draftCR revised to R3-180516 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180334 | Clarification on HRL for EN-DC |
draftCR revised to R3-180604 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180335 | Clarification on HRL for EN-DC |
draftCR revised to R3-180611 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180336 | Clarification on HRL for EN-DC |
pCR revised to R3-180605 |
Huawei | 38.423 0.5.0 | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] |
R3-180337 | Clarifications on the QoS parameters | discussion | Huawei | NR_newRAT-Core |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | ||
R3-180338 | Handling inconsistency in QoS parameters | draftCR | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180339 | Further considerations on secondary RAT data volume reporting | discussion | Huawei | NR_newRAT-Core |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | ||
R3-180345 | CR to 38.473 on the introduction of UE AMBR over F1 | draftCR | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180353 | Further discussions on UE context management related with EN-DC operation | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180354 | CR to 38.473 on UE context management procedure related with EN-DC operation |
draftCR revised to R3-180524 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180358 | Presence of gNB-DU system information in F1 setup request | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180359 | CR to 38.473 on the presence of gNB-DU system information | draftCR | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180360 | Presence of UE radio capability in CU to DU RRC information | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180361 | CR to 38.473 on the presence of UE Radio capabilities | draftCR | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180362 | Discussions on the presence of serving cell info in F1 Setup | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180363 | CR to 38.473 on the presence of gNB-DU Served Cells List in F1 Setup | other | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180364 | Further discussion on measurement gap configuration | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180365 | CR to 38.473 on measurement gap configuration | draftCR | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180366 | CR to 38.473 on gNB-CU behaviour without DU to CU RRC information | draftCR | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180409 | Handling of UE UL-AMBR | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180410 | Handling of UE UL-AMBR | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180439 | Change of GTP TEID when UE resumes in same node | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180440 | Change of GTP TEID when UE resumes in same node | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180441 | On Coexistence between suspend and dual connectivity | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180442 | Support of suspend in EN-DC | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180443 | Support of suspend in EN-DC | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180444 | [DRAFT] reply LS on Coexistence between suspend and dual connectivity |
LS out LS To: SA2, RAN2 |
Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180445 | Correction on Transaction ID | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180446 | CR for correction on Transaction ID |
draftCR revised to R3-180527 |
Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180447 | Discussions on FFS IEs in X2 Setup | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180448 | Correction on UE-AMBR for EN-DC | draftCR | LG Electronics | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180482 | Enhanced ASN.1 coding |
draftCR revised to R3-180530 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180483 | Criticality for UE context management | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180484 | Criticality for UE context management |
draftCR revised to R3-180523 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180485 | Transaction ID in F1AP | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180486 | Transaction ID in F1AP | draftCR | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180487 | Adding cause in context modification required | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180488 | Adding cause in context modification required | draftCR | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180489 | Rapporteur suggested updates to 38.473 | draftCR | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180498 | X2AP corrections for agreed EN-DC BL CR |
draftCR revised to R3-180696 |
Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] | |
R3-180500 | Handling of remaining stage 3 FFSs for NSA ANR |
other revision of R3-180220 revised to R3-180521 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180513 | Consideration on UE context management procedures for EN-DC |
discussion revision of R3-180183 |
CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180514 | Correction on UE context management procedures for EN-DC |
draftCR revision of R3-180184 |
CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180515 | Introduction of DRB ID for EN-DC |
draftCR revision of R3-180331 |
Huawei, NTT DOCOMO INC. | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
available | [WTS] [JSN] | |
R3-180516 | Clarification on HRL for EN-DC |
draftCR revision of R3-180333 revised to R3-180720 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] | |
R3-180519 | Way forward on Coexistence between suspension and dual connectivity | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
withdrawn | [WTS] [JSN] | |
R3-180520 | Way forward on the open issue for SN initiate SN Modification procedure | other | CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180521 | Handling of remaining stage 3 FFSs for NSA ANR |
draftCR revision of R3-180500 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180522 | Way forward on Support of UE Reconfiguration Complete Message | other | CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180523 | Criticality for UE context management |
draftCR revision of R3-180484 revised to R3-180698 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
merged | [WTS] [JSN] | |
R3-180524 | CR to 38.473 on UE context management procedure related with EN-DC operation |
draftCR revision of R3-180354 revised to R3-180617 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180525 | Corrections on UE Context Setup procedure |
draftCR revision of R3-180173 revised to R3-180699 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
merged | [WTS] [JSN] | |
R3-180526 | Way forward for AMBR enforcement | other | Nokia | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | ||
R3-180527 | CR for correction on Transaction ID |
draftCR revision of R3-180446 revised to R3-180618 |
Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180530 | Enhanced ASN.1 coding |
draftCR revision of R3-180482 revised to R3-180700 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
merged | [WTS] [JSN] | |
R3-180531 | Stage 2 alignment for NSA Energy Savings |
draftCR revision of R3-180102 revised to R3-180622 |
Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180532 | Essential corrections for EN-DC |
draftCR revision of R3-180289 revised to R3-180701 |
Huawei, Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] | |
R3-180533 | clarification and correction on S1 for EN-DC |
draftCR revision of R3-180280 revised to R3-180702 |
NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] | |
R3-180534 | Way forward for FFS over X2 for EN-DC | draftCR | Huawei, Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180535 | Living CR to solve remaining issues over X2 for EN-DC |
draftCR revision of R3-180304 revised to R3-180640 |
Huawei, Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180536 | Correction of counter Check procedure for EN-DC |
draftCR revision of R3-180056 revised to R3-180623 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180537 | CR for UL configuration |
draftCR revision of R3-180272 |
NTT DOCOMO INC. | NR_newRAT | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
withdrawn | [WTS] [JSN] | |
R3-180538 | Support for supplementary UL carrier |
draftCR revision of R3-180222 revised to R3-180624 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180563 | TP on Cell type |
draftCR revised to R3-180703 |
Nokia | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
merged | [WTS] [JSN] | |
R3-180565 | Way forward on Pcell and Pscell management | other | Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180566 | UE Context Management Procedure Related with EN-DC Operation - Stage 2 |
draftCR revised to R3-180616 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180589 | Corrections on NR U-plane protocol |
discussion revision of R3-180176 |
Nokia, Nokia Shanghai Bell, KDDI, KT |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |||
R3-180603 | Correction on SgNB initiated SgNB Modification procedure |
draftCR revision of R3-180168 revised to R3-180644 |
CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180604 | Clarification on HRL for EN-DC |
draftCR revision of R3-180334 revised to R3-180614 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180605 | Clarification on HRL for EN-DC |
pCR revision of R3-180336 revised to R3-180615 |
Huawei | 38.423 0.5.0 | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] |
R3-180611 | Clarification on HRL for EN-DC |
draftCR revision of R3-180335 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
noted | [WTS] [JSN] | |
R3-180614 | Clarification on HRL for EN-DC |
draftCR revision of R3-180604 revised to R3-180708 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] | |
R3-180615 | Clarification on HRL for EN-DC |
pCR revision of R3-180605 revised to R3-180761 |
Huawei | 38.423 0.5.0 | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] |
R3-180616 | UE Context Management Procedure Related with EN-DC Operation - Stage 2 |
draftCR revision of R3-180566 revised to R3-180645 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180617 | CR to 38.473 on UE context management procedure related with EN-DC operation |
draftCR revision of R3-180524 revised to R3-180709 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
merged | [WTS] [JSN] | |
R3-180618 | CR for correction on Transaction ID |
draftCR revision of R3-180527 revised to R3-180710 |
Ericsson | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
merged | [WTS] [JSN] | |
R3-180620 | Baseline CR to TS 38.473 for essential corrections to EN-DC operation |
CR revised to R3-180711 |
Huawei | 38.473 15.0.0 CR#1 catB | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] |
R3-180621 | Correction on SgNB initiated SgNB Modification procedure |
draftCR revision of R3-180167 revised to R3-180643 |
CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
revised | [WTS] [JSN] | |
R3-180622 | Stage 2 alignment for NSA Energy Savings |
draftCR revision of R3-180531 revised to R3-180726 |
Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] | |
R3-180623 | Correction of counter Check procedure for EN-DC |
draftCR revision of R3-180536 revised to R3-180712 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] | |
R3-180624 | Support for supplementary UL carrier |
draftCR revision of R3-180538 revised to R3-180713 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] | |
R3-180640 | Living CR to solve remaining issues over X2 for EN-DC |
draftCR revision of R3-180535 revised to R3-180714 |
Huawei, Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] | |
R3-180643 | Correction on SgNB initiated SgNB Modification procedure |
draftCR revision of R3-180621 revised to R3-180728 |
CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
merged | [WTS] [JSN] | |
R3-180644 | Correction on SgNB initiated SgNB Modification procedure |
draftCR revision of R3-180603 revised to R3-180715 |
CATT | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] | |
R3-180645 | UE Context Management Procedure Related with EN-DC Operation - Stage 2 |
draftCR revision of R3-180616 revised to R3-180716 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-ah-18778 AI: 31.3.1 |
endorsed | [WTS] [JSN] |
157 documents (0.36919403076172 seconds)