Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R3-160593 UE Context release in Control Plane CIoT EPS optimization draftCR

revision of R3-160508

revised to R3-160957

Huawei, Nokia, CATT, Qualcomm Incorporated, China Unicom, LGE NB_IOT-Core Rel-13 R3-91

AI: 26.1

revised [WTS] [JSN]
R3-160596 Introduction of Connection Establishment Indication procedure draftCR

revision of R3-160547

Huawei, Nokia NB_IOT-Core Rel-13 R3-91

AI: 26.1

revised [WTS] [JSN]
R3-160597 Introduction of Connection Establishment Indication procedure CR

revision of R3-160548

Huawei, Nokia 36.413 13.2.0 CR#14103 catB NB_IOT-Core, TEI13 Rel-13 R3-91

AI: 26.1

revised [WTS] [JSN]
R3-160641 Immediately Release after Initial UE message discussion Huawei NB_IOT-Core Rel-13 R3-91

AI: 26.1

noted [WTS] [JSN]
R3-160642 UE Radio Capability Handling discussion Huawei NB_IOT-Core Rel-13 R3-91

AI: 26.1

noted [WTS] [JSN]
R3-160682 Radio capabilty transfer in case of CP CIOT optimization discussion Samsung NB_IOT-Core Rel-13 R3-91

AI: 26.1

noted [WTS] [JSN]
R3-160722 Correction of connection establish indication discussion

revised to R3-160932

Nokia, Alcatel-Lucent Shanghai Bell NB_IOT-Core Rel-13 R3-91

AI: 26.1

revised [WTS] [JSN]
R3-160865 UE Capabilities Exchange for DoNAS discussion Ericsson NB_IOT-Core Rel-13 R3-91

AI: 26.1

noted [WTS] [JSN]
R3-160932 Correction of connection establish indication discussion

revision of R3-160722

Nokia, Alcatel-Lucent Shanghai Bell NB_IOT-Core Rel-13 R3-91

AI: 26.1

reserved [WTS] [JSN]
R3-160935 [DRAFT] LS on UE Radio Capability handling in CP solution (To: RAN2; Cc: SA2) LS out Huawei NB_IOT-Core Rel-13 R3-91

AI: 26.1

withdrawn [WTS] [JSN]
R3-160957 Introduction Control Plane CIoT EPS optimization draftCR

revision of R3-160593

revised to R3-161052

Huawei NB_IOT-Core, TEI13 Rel-13 R3-91

AI: 26.1

endorsed [WTS] [JSN]
R3-160958 Introduction Control Plane CIoT EPS optimization CR

revised to R3-161053

Huawei 36.413 13.2.0 CR#14104 catB NB_IOT-Core, TEI13 Rel-13 R3-91

AI: 26.1

endorsed [WTS] [JSN]

12 documents (0.26962399482727 seconds)