Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| S2-2506322 | Identifying 5G features to be supported by the 6G system |
pCR revised to S2-2507876 |
Qualcomm Incorporated, Ericsson, Nokia, MediaTek, Verizon, Orange | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2506391 | [General aspects] Architecture Assumptions for 6G | pCR | OPPO | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
not treated | [WTS] [JSN] |
| S2-2506392 | [General aspects] Architecture Requirements for 6G | pCR | OPPO | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
not treated | [WTS] [JSN] |
| S2-2506494 | [WT#1.x] On energy-related aspects |
pCR revised to S2-2507878 |
Nokia, NEC | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2506509 | [General Aspects] 6G Architecture support Stateless NF Services | pCR | Boost Mobile Network, EchoStar, Telecom Italia S.p.A, China Mobile, Cisco Systems, SK Telecom | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
not treated | [WTS] [JSN] |
| S2-2506576 | [General aspects] Architecture Requirements for 6G |
pCR revised to S2-2507875 |
LG Electronics | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2506635 | [General aspects] Architectural Assumptions and Requirements for 6G | pCR | vivo | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
not treated | [WTS] [JSN] |
| S2-2506636 | [General aspects, Energy efficiency] End-to-end energy saving and energy efficiency | pCR | vivo | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
not treated | [WTS] [JSN] |
| S2-2506745 | FS_6G_ARC TR skeleton |
pCR revised to S2-2507873 |
Ericsson, NTT DOCOMO (rapporteurs) | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2506746 | FS_6G_ARC TR 23.801-01 Scope |
pCR revised to S2-2507938 |
Ericsson, NTT DOCOMO (rapporteurs) | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2506774 | [General aspect] Architecture assumption and requirements | pCR | ZTE | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
not treated | [WTS] [JSN] |
| S2-2506829 | [General Aspects] 6G Architecture support Cloud Native | pCR | Boost Mobile Network, EchoStar, AT&T, Telecom Italia S.p.A, Rakuten Mobile, KPN N.V., Cisco Systems, SK Telecom | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
not treated | [WTS] [JSN] |
| S2-2506842 | [Architecture] Architectural Assumptions | pCR | Samsung | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
not treated | [WTS] [JSN] |
| S2-2506929 | [General aspects] Architecture assumptions and requiremnts for 6G architecture | pCR | Ericsson, T-Mobile USA Inc. | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
not treated | [WTS] [JSN] |
| S2-2507053 | Process for adopting 5G features for 6G day-1 |
discussion revised to S2-2507877 |
Nokia, Qualcomm, Verizon, AT&T | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] | ||
| S2-2507054 | [General aspects] Architecture Assumptions and Requirements | pCR | Nokia, AT&T, Ericsson, T-Mobile US | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
not treated | [WTS] [JSN] |
| S2-2507056 | [WT#1.2, resiliency] Work task 1.2 Resiliency scope | pCR | Nokia | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
noted | [WTS] [JSN] |
| S2-2507100 | [General aspects] 6G System Architectural Requirements and Assumptions | pCR | CATT | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
not treated | [WTS] [JSN] |
| S2-2507207 | [General aspects] Architecture Assumptions and Requirements on Energy Efficiency |
pCR revised to S2-2507874 |
NTT DOCOMO, KPN N.V., AT&T, Deutsche Telekom, SK Telecom, BT, China Mobile | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2507416 | Voice for 6G - Key Issues and Architectural Assumptions | pCR | T-Mobile USA, Nokia | 23.801-01 0.1.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
not treated | [WTS] [JSN] |
| S2-2507873 | FS_6G_ARC TR skeleton. |
pCR revision of S2-2506745 revised to S2-2507937 |
Ericsson, NTT DOCOMO (rapporteurs) | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2507874 | [General aspects] Summary of Architectural Assumptions. |
pCR revision of S2-2507207 revised to S2-2507939 |
NTT DOCOMO (pen holder) | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2507875 | [General aspects] Architecture Requirements for 6G. |
pCR revision of S2-2506576 revised to S2-2507940 |
LG Electronics | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2507876 | Identifying 5G features to be supported by the 6G system. |
pCR revision of S2-2506322 |
Qualcomm Incorporated, Ericsson, Nokia, MediaTek, Verizon, Orange | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
noted | [WTS] [JSN] |
| S2-2507877 | Process for adopting 5G features for 6G day-1 |
discussion revision of S2-2507053 revised to S2-2508050 |
Nokia, Qualcomm, Verizon, AT&T | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] | ||
| S2-2507878 | [WT#1.x] On energy-related aspects. |
pCR revision of S2-2506494 revised to S2-2507983 |
Nokia, NEC, Vivo, Lenovo, InterDigital, IIT Bombay | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2507937 | FS_6G_ARC TR skeleton. |
pCR revision of S2-2507873 |
Ericsson, NTT DOCOMO (rapporteurs) | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
approved | [WTS] [JSN] |
| S2-2507938 | FS_6G_ARC TR 23.801-01 Scope. |
pCR revision of S2-2506746 revised to S2-2508022 |
Ericsson, NTT DOCOMO (rapporteurs) | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2507939 | [General aspects] Summary of Architectural Assumptions. |
pCR revision of S2-2507874 revised to S2-2508023 |
NTT DOCOMO (pen holder) | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2507940 | [General aspects] Architecture Requirements for 6G. |
pCR revision of S2-2507875 revised to S2-2508025 |
LG Electronics | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2507983 | [WT#1.x] On energy-related aspects. |
pCR revision of S2-2507878 |
Nokia, NEC, Vivo, Lenovo, InterDigital, IIT Bombay, Orange, AT&T, T-Mobile USA, Samsung | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
postponed | [WTS] [JSN] |
| S2-2508022 | FS_6G_ARC TR 23.801-01 Scope. |
pCR revision of S2-2507938 |
Ericsson, NTT DOCOMO (rapporteurs) | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
approved | [WTS] [JSN] |
| S2-2508023 | [General aspects] Summary of Architectural Assumptions. |
pCR revision of S2-2507939 revised to S2-2508110 |
NTT DOCOMO (pen holder) | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2508025 | [General aspects] Architecture Requirements for 6G. |
pCR revision of S2-2507940 revised to S2-2508111 |
LG Electronics, TNO | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] |
| S2-2508050 | Process for adopting 5G features for 6G day-1 |
discussion revision of S2-2507877 revised to S2-2508114 |
Nokia, Qualcomm, Verizon, AT&T | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] | ||
| S2-2508110 | [General aspects] Summary of Architectural Assumptions. |
pCR revision of S2-2508023 revised to S2-2508320, S2-2508790 |
NTT DOCOMO (pen holder) | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
postponed | [WTS] [JSN] |
| S2-2508111 | [General aspects] Architecture Requirements for 6G. |
pCR revision of S2-2508025 revised to S2-2508321, S2-2508548 |
LG Electronics, TNO | 23.801-01 0.0.0 | FS_6G_ARC | Rel-20 |
S2-170 AI: 20.6 |
postponed | [WTS] [JSN] |
| S2-2508114 | Process for adopting 5G features for 6G day-1 |
discussion revision of S2-2508050 revised to S2-2508115 |
Nokia, Qualcomm, Verizon, AT&T | Rel-20 |
S2-170 AI: 20.6 |
revised | [WTS] [JSN] | ||
| S2-2508115 | Process for adopting 5G features for 6G day-1 |
discussion revision of S2-2508114 |
Nokia, Qualcomm, Verizon, AT&T | Rel-20 |
S2-170 AI: 20.6 |
endorsed | [WTS] [JSN] |
39 documents (0.42622113227844 seconds)