Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| S2-2504506 | LS from CT WG4: Reply LS on maximum warning message size |
LS in source LS: C4-251432 LS To: RAN WG2 |
CT WG4 | IoT_NTN_Ph3-Core | Rel-19 |
S2-169 AI: 19.1.2 |
noted | [WTS] [JSN] | |
| S2-2504578 | LS from RAN WG3: Reply LS on OAM requirements to support regenerative payload transport links |
LS in source LS: R3-250895 LS To: SA WG2 LS reply in S2-2505961 revision of S2-2502829 |
RAN WG3 | NR_NTN_Ph3-Core |
S2-169 AI: 19.1.2 |
replied to | [WTS] [JSN] | ||
| S2-2504580 | LS from SA WG5: Reply LS to LS on reply to LS on OAM requirements to support regenerative payload |
LS in source LS: S5-250842 LS To: SA WG2 LS reply in S2-2505961 revision of S2-2502842 |
SA WG5 | NTN_OAM_Ph2 |
S2-169 AI: 19.1.2 |
replied to | [WTS] [JSN] | ||
| S2-2504656 | Support of NG connection interruption due to hard feeder link switch over | CR | China Telecom | 23.501 19.3.0 CR#6284 catB | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
merged | [WTS] [JSN] |
| S2-2504683 | Update on early media handling in UE-Satellite-UE scenario |
CR revision of S2-2503583 |
Vivo | 23.228 19.2.0 CR#16291 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2504722 | Removal of Rx-Related Note for UE-SAT-UE | CR | ZTE, CATT | 23.228 19.2.0 CR#1644 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2504723 | Input Parameter Alignment for UP Path Change Subscription in TS 23.502 | CR | ZTE | 23.502 19.3.0 CR#5489 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2504724 | Input Parameter Alignment for UP Path Change Subscription in TS 23. 228 | CR | ZTE | 23.228 19.2.0 CR#1645 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2504725 | Enhancement of SM Policy Control to Support Implicit Subscription Handling | CR | ZTE | 23.502 19.3.0 CR#5490 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2504726 | Clarification of DNAI Handling for UE-SAT-UE Communication | CR | ZTE | 23.502 19.3.0 CR#5491 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2504727 | Refinement of UE behavior and S&F wait timer handling | CR | ZTE | 23.401 19.2.0 CR#3925 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2504777 | Update to Initial Call setup and functional support for UE-Satellite-UE communication in IMS |
CR revision of S2-2502917 |
Ericsson | 23.228 19.2.0 CR#16081 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2504778 | Update to Mobility procedures for UE-Satellite-UE communication |
CR revision of S2-2502918 |
Ericsson | 23.228 19.2.0 CR#16091 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2504790 | Clarification on S&F Wait Timer |
CR revision of S2-2503071 |
Nokia, Huawei, HiSilicon | 23.401 19.2.0 CR#39052 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
noted | [WTS] [JSN] |
| S2-2504882 | On TAI configuration in AMF via OAM. |
discussion revision of S2-2503224 |
Qualcomm Incorporated, Vodafone | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] | |
| S2-2504905 | Clarify S1-U not supported by split MME |
CR revision of S2-2503266 |
Ericsson, AT&T | 23.401 19.2.0 CR#39071 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2504906 | Clarify PDN connection handling for split MME |
CR revision of S2-2503267 |
Ericsson, AT&T | 23.401 19.2.0 CR#39081 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2504907 | Clarify the S&F event is sent from SCEF to SCS/AS |
CR revision of S2-2503753 |
Ericsson, AT&T | 23.682 19.2.0 CR#4981 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2504909 | TAI handling for regenerative access . | discussion | Ericsson | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] | |
| S2-2504911 | [DRAFT] Reply LS on OAM requirements to support regenerative payload transport links |
LS out LS To: RAN WG3, SA WG5 revision of S2-2503231 |
Qualcomm, Vodafone | NR_NTN_Ph3-Core | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] | |
| S2-2504977 | Transition to S&F satellite for legacy UE |
CR revised to S2-2505688 |
Qualcomm Incorporated | 23.401 19.2.0 CR#3926 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2504994 | UE procedures for handling S&F Wait Timer | CR | Qualcomm Incorporated | 23.401 19.2.0 CR#3927 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
noted | [WTS] [JSN] |
| S2-2505050 | Transitioning between operation in S&F mode and normal mode |
CR revision of S2-2503363 |
LG Electronics | 23.401 19.2.0 CR#39111 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
noted | [WTS] [JSN] |
| S2-2505051 | Procedure updates for S&F operation |
CR revision of S2-2503364 |
LG Electronics | 23.401 19.2.0 CR#39121 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
noted | [WTS] [JSN] |
| S2-2505053 | Updates to S&F mode transition |
CR revision of S2-2503414 |
Vivo | 23.401 19.2.0 CR#39131 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
noted | [WTS] [JSN] |
| S2-2505054 | Procedure updates for S&F |
CR revision of S2-2503415 revised to S2-2505689 |
Vivo | 23.401 19.2.0 CR#39141 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2505055 | TAIs configured by OAM |
CR revision of S2-2503416 |
Vivo | 23.501 19.3.0 CR#62172 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2505056 | TAIs configured by OAM |
CR revision of S2-2503417 |
Vivo | 23.502 19.3.0 CR#54432 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2505057 | [DRAFT] Reply LS on OAM requirements to support regenerative payload transport links |
LS out LS To: RAN WG3, SA WG5 |
vivo | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] | |
| S2-2505093 | Update on change of BP/ULCL and UP notification procedures for UE-Satellite-UE communication |
CR revision of S2-2503467 |
ETRI | 23.502 19.3.0 CR#54521 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2505100 | Clarification that a UE may not be necessarily served by all the satellites in S&F mode in a PLMN but by a subset of satellites |
CR revised to S2-2505692 |
Sateliot, Thales, Novamint | 23.401 19.2.0 CR#3928 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2505149 | Clarification on UP path event subscription for UE-satellite-UE communication |
CR revision of S2-2503652 |
Huawei, HiSilicon | 23.228 19.2.0 CR#16301 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2505150 | Clarification and correction on UP path event report for UE-satellite-UE communication |
CR revision of S2-2503653 |
Huawei, HiSilicon | 23.501 19.3.0 CR#62461 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2505151 | Update Support of Attach with PDN connection for split MME architecture |
CR revision of S2-2503918 |
Huawei, HiSilicon | 23.401 19.2.0 CR#39173 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2505152 | Removing UE S&F Term | CR | Huawei, HiSilicon | 23.682 19.2.0 CR#500 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2505201 | Detach related procedures update to support S&F operation |
CR revised to S2-2505690 |
Xiaomi | 23.401 19.2.0 CR#3929 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2505223 | Avoid congestion caused by S&F timer |
CR revision of S2-2503662 revised to S2-2505687 |
MediaTek Inc. | 23.401 19.2.0 CR#39152 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2505232 | Update to the GUTI Reallocation procedure | CR | ZTE | 23.401 19.2.0 CR#3930 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
noted | [WTS] [JSN] |
| S2-2505233 | N2 interface enhancement for downlink data suspension/resumption |
CR revised to S2-2505686 |
ZTE | 23.501 19.3.0 CR#6324 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2505236 | Discussion on OAM based solution to support NTN regenerative payload. | discussion | CATT, CSCN, ZTE, vivo | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] | |
| S2-2505237 | [DRAFT] Reply LS on OAM requirements to support regenerative payload transport links |
LS out LS To: RAN WG3, SA WG5 revision of S2-2503706 revised to S2-2505261 |
CATT | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] | |
| S2-2505238 | Configuration of TAI list for regenerative satellite payload |
CR revision of S2-2503707 |
CATT, CSCN | 23.501 19.3.0 CR#62501 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
noted | [WTS] [JSN] |
| S2-2505239 | Clarification on UE-SAT-UE communication when serving satellite changes |
CR revision of S2-2503709 |
CATT | 23.501 19.3.0 CR#62511 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2505240 | Clarification on UE-Satellite-UE communication procedures |
CR revision of S2-2503712 |
CATT | 23.228 19.2.0 CR#16361 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2505261 | [DRAFT] Reply LS on OAM requirements to support regenerative payload transport links |
LS out LS To: RAN WG3, SA WG5 revision of S2-2505237 revised to S2-2505685 |
CATT | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] | |
| S2-2505389 | Align the terms. |
CR revision of S2-2503887 |
Samsung | 23.682 19.2.0 CR#4991 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] |
| S2-2505395 | Handling S&F not allowed. |
CR revision of S2-2503881 revised to S2-2505691 |
Samsung | 23.401 19.2.0 CR#39231 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2505407 | Supported TAIs information | CR | Samsung | 23.501 19.3.0 CR#6332 catB | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
noted | [WTS] [JSN] |
| S2-2505408 | [DRAFT] Reply LS on OAM requirements to support regenerative payload transport links |
LS out LS To: RAN WG3, SA WG5 |
Samsung |
S2-169 AI: 19.1.2 |
not treated | [WTS] [JSN] | |||
| S2-2505539 | SoH questions for TAI handling | other | Session chair |
S2-169 AI: 19.1.2 |
noted | [WTS] [JSN] | |||
| S2-2505685 | [DRAFT] Reply LS on OAM requirements to support regenerative payload transport links |
LS out LS To: RAN WG3, SA WG5 revision of S2-2505261 revised to S2-2505961 |
CATT | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] | |
| S2-2505686 | N2 interface enhancement for downlink data suspension/resumption |
CR revision of S2-2505233 revised to S2-2505707 |
ZTE | 23.501 19.3.0 CR#63241 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2505687 | Avoid congestion caused by S&F timer |
CR revision of S2-2505223 |
MediaTek Inc. | 23.401 19.2.0 CR#39153 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
postponed | [WTS] [JSN] |
| S2-2505688 | Transition to S&F satellite for legacy UE |
CR revision of S2-2504977 revised to S2-2505709 |
Qualcomm Incorporated | 23.401 19.2.0 CR#39261 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2505689 | Procedure updates for S&F |
CR revision of S2-2505054 |
Vivo | 23.401 19.2.0 CR#39142 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
withdrawn | [WTS] [JSN] |
| S2-2505690 | Detach related procedures update to support S&F operation |
CR revision of S2-2505201 |
Xiaomi | 23.401 19.2.0 CR#39291 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
withdrawn | [WTS] [JSN] |
| S2-2505691 | Handling S&F not allowed. |
CR revision of S2-2505395 revised to S2-2505711 |
Samsung, ZTE, NEC | 23.401 19.2.0 CR#39232 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2505692 | Clarification that the S&F Wait Timer may need to take into account the time taken to synchronize UE context between MME-ground and MME-onboard(s) |
CR revision of S2-2505100 revised to S2-2505710 |
Sateliot, Thales, Novamint, MediaTek | 23.401 19.2.0 CR#39281 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2505707 | N2 interface enhancement for downlink data suspension/resumption |
CR revision of S2-2505686 revised to S2-2505708 |
ZTE | 23.501 19.3.0 CR#63242 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2505708 | N2 interface enhancement for downlink data suspension/resumption |
CR revision of S2-2505707 revised to S2-2505962 |
ZTE | 23.501 19.3.0 CR#63243 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2505709 | Transition to S&F satellite for legacy UE |
CR revision of S2-2505688 |
Qualcomm Incorporated | 23.401 19.2.0 CR#39262 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
noted | [WTS] [JSN] |
| S2-2505710 | Clarification that the S&F Wait Timer may need to take into account the time to synchronize the UE context between MME-ground and MME-onboard(s) |
CR revision of S2-2505692 |
Sateliot, Thales, Novamint, MediaTek, Samsung | 23.401 19.2.0 CR#39282 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
agreed | [WTS] [JSN] |
| S2-2505711 | Handling S&F not allowed. |
CR revision of S2-2505691 revised to S2-2505963 |
Samsung, ZTE, NEC, Nokia | 23.401 19.2.0 CR#39233 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
revised | [WTS] [JSN] |
| S2-2505961 | Reply LS on OAM requirements to support regenerative payload transport links |
LS out LS is reply to S2-2504578 LS To: RAN WG3, SA WG5 revision of S2-2505685 |
SA WG2 | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
approved | [WTS] [JSN] | |
| S2-2505962 | N2 interface enhancement for downlink data suspension/resumption |
CR revision of S2-2505708 |
ZTE | 23.501 19.3.0 CR#63244 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
postponed | [WTS] [JSN] |
| S2-2505963 | Handling S&F not allowed. |
CR revision of S2-2505711 |
Samsung, ZTE, NEC, Nokia | 23.401 19.2.0 CR#39234 catF | 5GSAT_Ph3-ARC | Rel-19 |
S2-169 AI: 19.1.2 |
agreed | [WTS] [JSN] |
66 documents (0.30368614196777 seconds)