Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S2-2311988 Procedure for Robust Notification Alert Delivery. discussion Hughes Network Systems Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312059 Key Issue for WT#1 to study Satellite Access Control mechanism. pCR Google 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312125 Key issue on dynamic delay impacts on the NG/S1 interfaces. pCR Vivo, CATT 23.700-29 0.1.1 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312126 FS_5GSAT_ARCH_Ph3 Architecture assumption updates UE-satellite-UE communications. pCR

revised to S2-2313366

Vivo 23.700-29 0.1.1 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2312128 Scope update for the eNB onboard the satellite and Corrections to Architectural Assumptions and Principles, and Annex A. pCR NEC 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312129 Serving satellite definition update. pCR NEC 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312130 S&F Satellite operation for UL and DL. pCR NEC 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312139 UE-Satellite-UE Communication definition for ISL. pCR NEC 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312140 New KI: gNB embedded on the satellite for NR NTN. pCR NEC 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312141 New KI: eNB embedded on the satellite for IoT NTN. pCR NEC 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312146 Example network and satellite configurations for WT3 in FS_5GSAT_ARCH_Ph3. pCR

revised to S2-2313368

Thales 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2312421 New KI: S&F satellite operation support. pCR OPPO 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312422 New KI: Managing switchover of satellite onboard eNB/gNB in EPS/5GS. pCR OPPO 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312430 New KI: [WT#2] Support store and forward satellite operation . pCR LG Electronics 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312461 FS_5GSAT_ARCH_Ph3_Key issue for WT#3. pCR

revised to S2-2313367

CATT, Thales, Novamint, Samsung, Airbus, Eutelsat, TNO, IRT Saint-Exupery, Apple 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2312537 Correction of Terminology Definition for TR 23.700-29. pCR China Mobile 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312539 FS_5GSAT_Ph3_ARCH_Key issue for WT#2.2. pCR

revision of S2-2310843

China Mobile 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312636 New key issue: Enhancements to support store and forward in discontinuous coverage. pCR

revision of S2-2310726

China Mobile 23.700-29 0.0.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312673 Handle of Key Issues for WT#1 on gNB/eNB embedded on the satellite. pCR China Telecom 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312692 Feasibility Study satellite Key issue for WT#3. pCR

revision of S2-2311076

NEC 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312698 KI #2, New Sol: Support of store and forward in EPS. pCR

revised to S2-2400693

NEC 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312738 WT#2, New Sol: Store and forward control for MT data delivery based on feeder link availability information in the MME. pCR LG Electronics 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312772 Terms: Introduction of the term Ground Link. pCR Huawei, HiSilicon 23.700-29 0.1.1 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312773 Assumptions: Architectural Assumptions and Principles update. pCR Huawei, HiSilicon 23.700-29 0.1.1 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

merged [WTS] [JSN]
S2-2312774 New KI: Regenerative payload generic architecture. pCR Huawei, HiSilicon 23.700-29 0.1.1 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

merged [WTS] [JSN]
S2-2312775 New KIs: Store and Forward for satellites with intermittent ground links. pCR Huawei, HiSilicon 23.700-29 0.1.1 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312776 New KI: Identification of services and missing functionality to optimise UE-satellite-UE communication in 5GS. pCR Huawei, HiSilicon 23.700-29 0.1.1 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312798 Discussion on architecture assumptions about UE-satellite-UE communication pCR vivo 23.700-29 0.1.1 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

noted [WTS] [JSN]
S2-2312825 New KI items for WT1 in FS_5GSAT_ARCH_Ph3. pCR Vodafone 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312901 FS_5GSAT_ARCH_Ph3 Key issue on S&F service authorization and provisioning. pCR

revision of S2-2310754

Vivo 23.700-29 0.1.1 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312916 New Key Issue for WT2 on registration clash between S&F satellite and TN. pCR

revision of S2-2311163

Vodafone 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312921 Terminology correction on TR 23.700-29 scope. pCR Nokia, Nokia Shanghai Bell 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312922 Terms and abbreviations in TR 23.700-29. pCR

revised to S2-2313369

Nokia, Nokia Shanghai Bell, Orange 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2312926 FS_5GSAT_ ARCH_Ph3 Key issue for WT1. pCR Nokia, Nokia Shanghai Bell 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312927 FS_5GSAT_ARCH_Ph3_Key issue for WT#2. pCR Nokia, Nokia Shanghai Bell 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312972 FS_5GSAT_ARCH_Ph3_Key issue for WT#3. pCR Nokia, Nokia Shanghai Bell 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2312988 FS_5GSAT_Ph3_ARCH_Key issues for WT#1. pCR

revised to S2-2313364

CATT, Thales, Novamint, China Telecom, Spreadtrum, vivo 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2313027 FS_5GSAT_ARCH_Ph3_Key issue for WT#2. pCR

revised to S2-2313365

Novamint, CATT, Thales, Sateliot, Gatehouse 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2313066 S&F satellite operation terminology update. pCR Xiaomi 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2313125 PCR 23.700-29 Scope and Definition wrt constellations. pCR MediaTek Inc. 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2313155 Discussion on a reference framework for S&F for IoT NTN. discussion Sateliot S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2313199 Key Issue: Objectives: of regenerative payload operation for WT1. pCR Qualcomm Incorporated 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2313200 Key Issue: Objectives: of Store and Forward Operation for WT2. pCR Qualcomm Incorporated 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2313201 Key Issue: Objectives: of UE-satellite-UE communication for WT3. pCR Qualcomm Incorporated 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

not treated [WTS] [JSN]
S2-2313364 FS_5GSAT_Ph3_ARCH_Key issues for WT#1. pCR

revision of S2-2312988

revised to S2-2313623

CATT, Thales, Novamint, China Telecom, Spreadtrum, vivo, TNO, Eutelsat, Nokia, Nokia Shanghai Bell, NEC 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2313365 FS_5GSAT_ARCH_Ph3_Key issue for WT#2. pCR

revision of S2-2313027

revised to S2-2313624

Novamint, CATT, Thales, Sateliot, Gatehouse, TNO 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2313366 FS_5GSAT_ARCH_Ph3 Architecture assumption updates UE-satellite-UE communications. pCR

revision of S2-2312126

revised to S2-2313625

Vivo, Samsung 23.700-29 0.1.1 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2313367 FS_5GSAT_ARCH_Ph3_Key issue for WT#3. pCR

revision of S2-2312461

revised to S2-2313626

CATT, Thales, Novamint, Samsung, Airbus, Eutelsat, TNO, IRT Saint-Exupery, Apple, Nokia,Nokia Shanga Bell 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2313368 Example network and satellite configurations for WT3 in FS_5GSAT_ARCH_Ph3. pCR

revision of S2-2312146

revised to S2-2313627

Thales 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2313369 Terms and abbreviations in TR 23.700-29. pCR

revision of S2-2312922

Nokia, Nokia Shanghai Bell, Orange 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

approved [WTS] [JSN]
S2-2313623 FS_5GSAT_Ph3_ARCH_Key issues for WT#1. pCR

revision of S2-2313364

CATT, Thales, Novamint, China Telecom, Spreadtrum, vivo, TNO, Eutelsat, Nokia, Nokia Shanghai Bell, NEC, Xiaomi, SAMSUNG, OPPO, Deutsche Telekom, Airbus 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

approved [WTS] [JSN]
S2-2313624 FS_5GSAT_ARCH_Ph3_Key issue for WT#2. pCR

revision of S2-2313365

revised to S2-2313702

Novamint, CATT, Thales, Sateliot, Gatehouse, TNO, Airbus, Deutsche Telekom, Oppo, Vivo, Xiaomi, CEWiT, Hughes Network Systems, Skylo, Samsung, NEC 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2313625 FS_5GSAT_ARCH_Ph3 Architecture assumption updates UE-satellite-UE communications. pCR

revision of S2-2313366

revised to S2-2313703

Vivo, Samsung, Huawei, HiSilicon, Thales, Deutsche Telekom 23.700-29 0.1.1 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2313626 FS_5GSAT_ARCH_Ph3_Key issue for WT#3. pCR

revision of S2-2313367

revised to S2-2313704

CATT, Thales, Novamint, Samsung, Airbus, Eutelsat, TNO, IRT Saint-Exupery, Apple, Nokia, Nokia Shanga Bell, Xiaomi, OPPO, Vivo, Motorola Solutions 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2313627 Example network and satellite configurations for WT3 in FS_5GSAT_ARCH_Ph3. pCR

revision of S2-2313368

revised to S2-2313861

Thales 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

revised [WTS] [JSN]
S2-2313702 FS_5GSAT_ARCH_Ph3_Key issue for WT#2. pCR

revision of S2-2313624

Novamint, CATT, Thales, Sateliot, Gatehouse, TNO, Airbus, Deutsche Telekom, Oppo, Vivo, Xiaomi, CEWiT, Hughes Network Systems, Skylo, Samsung, NEC, LGE, Nokia, Nokia Shanghai Bell, Huawei 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

approved [WTS] [JSN]
S2-2313703 FS_5GSAT_ARCH_Ph3 Architecture assumption updates UE-satellite-UE communications. pCR

revision of S2-2313625

Vivo, Samsung, Huawei, HiSilicon, Thales, Deutsche Telekom 23.700-29 0.1.1 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

approved [WTS] [JSN]
S2-2313704 FS_5GSAT_ARCH_Ph3_Key issue for WT#3. pCR

revision of S2-2313626

CATT, Thales, Novamint, Samsung, Airbus, Eutelsat, TNO, IRT Saint-Exupery, Apple, Nokia, Nokia Shanga Bell, Xiaomi, OPPO, Vivo, Motorola Solutions, NEC 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

approved [WTS] [JSN]
S2-2313861 Example network and satellite configurations for WT3 in FS_5GSAT_ARCH_Ph3. pCR

revision of S2-2313627

Thales 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160

AI: 19.1

approved [WTS] [JSN]
S2-2400036 LS from TSG RAN: LS on Robust Notification Alert for NTN-NR Rel-19 LS in

source LS: RP-234075

LS To: SA WG1, SA WG2

revised to S2-2401850

TSG RAN Rel-19 S2-160-Ad Hoc-e

AI: 19.1

postponed [WTS] [JSN]
S2-2400088 5GC Enhancements to Support of Store and Forward Satellite operation. pCR

revised to S2-2401785

China Mobile 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400159 [DRAFT] Reply LS on Robust Notification Alert for NTN-NR Rel-19 LS out

LS To: TSG RAN

Nokia, Nokia Shanghai Bell FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

postponed [WTS] [JSN]
S2-2400317 KI #2: New Sol: MME Split Architecture for S&F. pCR

revised to S2-2401786

Nokia, Nokia Shanghai Bell 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400338 KI #3, New sol: Solution of P-CSCF offload for UE-satellite-UE communication. pCR China Mobile 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

noted [WTS] [JSN]
S2-2400339 KI #3, New sol: Solution of Satellite on board UPF and IMS Media Plane function selection for UE-satellite-UE communication. pCR

revised to S2-2401802

China Mobile 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400341 KI #2: New Sol: Store & Forward operation for Mobile Originated Data Transport in Control Plane CIoT EPS Optimisation. pCR Nokia, Nokia Shanghai Bell 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

merged [WTS] [JSN]
S2-2400342 KI #2: New Sol: UE Reachability estimator in S&F scenario. pCR

revised to S2-2401787

Nokia, Nokia Shanghai Bell 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400343 KI #2: New Sol: Attach Procedure in S&F scenario. pCR Nokia, Nokia Shanghai Bell 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

merged [WTS] [JSN]
S2-2400354 KI#1: New Solution for handling of S1/NG when satellite leaves an area served by a CN. pCR

revised to S2-2401776

Ericsson 23.700-29 0.2.0 FS_5GSAT_Ph3 Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400364 KI#2, New Sol: Support of Store and Forward Satellite Operation via User Plane Buffering. pCR Tencent, Tencent Cloud 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

noted [WTS] [JSN]
S2-2400365 KI#2, New Sol: Support of Store and Forward Satellite Operation via Control Plane Buffering. pCR Tencent, Tencent Cloud 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

noted [WTS] [JSN]
S2-2400391 On Robust Notification Alert for NTN-NR. discussion

revised to S2-2402656

MediaTek Inc. S2-160-Ad Hoc-e

AI: 19.1

noted [WTS] [JSN]
S2-2400392 [DRAFT] Reply LS on Robust Notification Alert for NTN-NR Rel-19 LS out

LS To: SA WG1, RAN

revised to S2-2402657

MediaTek Inc. S2-160-Ad Hoc-e

AI: 19.1

postponed [WTS] [JSN]
S2-2400446 QoS considerations for enhanced NTN architectures. discussion National Spectrum Consortium (NSC) S2-160-Ad Hoc-e

AI: 19.1

noted [WTS] [JSN]
S2-2400466 KI#2, New Sol: Store and forward control for MT data delivery based on feeder link availability information in the MME. pCR

revised to S2-2401788

LG Electronics 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400540 KI#2, New Sol: Provision of Store and Forward Satellite Specific Parameters. pCR

revised to S2-2401789

LG Electronics 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400565 KI#1, New Sol: Support of feeder link switchover for regenerative eNB payload. pCR

revised to S2-2401777

OPPO 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400566 KI#1, New Sol: Support of Feeder Link Switchover for regenerative gNB payload in 5GS. pCR OPPO 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

merged [WTS] [JSN]
S2-2400573 KI#1, New Sol: Load re-balancing for feeder link switchover. pCR

revised to S2-2401778

OPPO 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400574 TR 23.700-29 Updates on Terms and Annex A. pCR OPPO 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

not treated [WTS] [JSN]
S2-2400575 [DRAFT] Reply LS on Robust Notification Alert LS out

LS To: TSG RAN, SA WG1

OPPO Rel-19 S2-160-Ad Hoc-e

AI: 19.1

postponed [WTS] [JSN]
S2-2400576 KI#2, New Sol: Attach Procedure with MME and HSS on board the satellite . pCR

revised to S2-2401790

OPPO 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400693 KI #2, New Sol: Support of store and forward in EPS. pCR

revision of S2-2312698

NEC 23.700-29 0.1.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

noted [WTS] [JSN]
S2-2400704 New Solution for Key Issue #3: Support of UE-satellite-UE communication. pCR

revised to S2-2401803

China Telecom 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400705 New solution for Key Issue #2: Support of Store and Forward Satellite operation for SMS. pCR

revised to S2-2401791

China Telecom 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400706 New Solution for Key Issue #1: QoS/Policy handing. pCR

revised to S2-2401779

China Telecom 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400707 New Solution for Key Issue #1:Feeder link switchover. pCR

revised to S2-2401780

China Telecom 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400708 KI #1, New Sol: Regenerative architecture. pCR

revised to S2-2401781

NEC 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400727 TR 23.700-29 KI#2 Solution: Performance optimization for the transport of MT/MO S&F traffic. pCR

revised to S2-2401792

China Mobile 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400792 [DRAFT] Reply LS to RAN and SA WG1 on Robust notification LS out

LS To: TSG RAN

vivo FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

postponed [WTS] [JSN]
S2-2400793 New Solution on the addition of new RAT types and backhaul types. pCR Vivo 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

not treated [WTS] [JSN]
S2-2400794 New Solution on Context Management on AMF when RAN is onboard. pCR

revised to S2-2401782

Vivo 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400795 New Solution on Enabling S&F operation with C-SGN onboard. pCR

revised to S2-2401793

Vivo 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400796 New Solution on SMF activated UE-satellite-UE Communication for IMS Service. pCR

revised to S2-2401804

Vivo 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400853 KI#3: New Solution for UE-satellite-UE communication with IMS-AGW onboard . pCR Huawei, HiSilicon 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

noted [WTS] [JSN]
S2-2400854 KI#3: New Solution for UE-satellite-UE communication with UPF onboard . pCR

revised to S2-2401805

Huawei, HiSilicon 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400865 KI #2, New Sol: Support of Store and Forward Satellite operation. pCR IPLOOK 23.700-29 0.2.0 5GSAT_Ph3, FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

noted [WTS] [JSN]
S2-2400923 Solution for KI#1: Support of Regenerative-based satellite access. pCR

revised to S2-2401837

CATT 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400924 Solution for KI#2: Support of Store and Forward Satellite operation. pCR

revised to S2-2401794

CATT 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400926 KI#3: New solution to UE-Satellite-UE Communication via UPFs onboard the satellites. pCR

revised to S2-2401806

CATT 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400928 KI#3: New solution to UE-Satellite-UE Communication via UPFs and IMS AGWs on-board the satellites. pCR CATT 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

merged [WTS] [JSN]
S2-2400985 KI#2, New Sol: Initial Attach / Registration in 5GSAT network for S&F operation. pCR

revised to S2-2401795

Intel 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2400989 KI#2, New Sol: Support for SMS in 5GSAT network for S&F operation. pCR

revised to S2-2401799

Intel 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2401019 [DRAFT] Reply LS on Robust Notification Alert for NTN-NR Rel-19 LS out

LS To: TSG RAN, SA WG1

Xiaomi FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

postponed [WTS] [JSN]
S2-2401020 KI #1, New Sol: Support of Regenerative-based satellite access. pCR

revised to S2-2401783

Xiaomi 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2401021 KI #2, New Sol: Support of store and forward satellite operation in EPS. pCR

revised to S2-2401796

Xiaomi 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2401022 KI #3, New Sol: Support of UE-satellite-UE communication in 5GS. pCR Xiaomi 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

merged [WTS] [JSN]
S2-2401077 New Solution for KI#3: Solution to determine UE-SATs-UE eligibility and enable communication setup. pCR

revised to S2-2401807

Thales 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2401220 KI#1, New Sol: Architecture for regenerative-based satellite access with IWF on the S1 or N2/N3 interface. pCR

revised to S2-2401784

Intel 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2401232 KI#2: S&F solution for multi-satellite IoT NTN. pCR

revised to S2-2401797

Sateliot, GateHouse, Novamint 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2401304 [KI#1] Solution X: Satellite Access Control . pCR Google 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

noted [WTS] [JSN]
S2-2401312 [DRAFT] Reply LS on Robust Notification Alert for NTN-NR Rel-19 LS out

LS To: TSG RAN

revised to S2-2402521

Samsung Rel-19 S2-160-Ad Hoc-e

AI: 19.1

postponed [WTS] [JSN]
S2-2401313 KI#2: S&F for multiple satellite deployment. pCR

revised to S2-2401798

Samsung 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2401314 KI#2: S&F for single satellite deployment. pCR

revised to S2-2401800

Samsung 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2401367 Solution to KI#2: Support of Store and Forward Satellite Operation. pCR

revised to S2-2401801

Qualcomm Incorporated 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

revised [WTS] [JSN]
S2-2401776 KI#1: New Solution for handling of S1/NG when satellite leaves an area served by a CN. pCR

revision of S2-2400354

Ericsson 23.700-29 0.2.0 FS_5GSAT_Ph3 Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401777 KI#1, New Sol: Support of feeder link switchover for regenerative eNB payload. pCR

revision of S2-2400565

OPPO 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401778 KI#1, New Sol: Load re-balancing for feeder link switchover. pCR

revision of S2-2400573

OPPO 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401779 New Solution for Key Issue #1: QoS/Policy handing. pCR

revision of S2-2400706

China Telecom, vivo 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401780 New Solution for Key Issue #1:Feeder link switchover with DL data continuity. pCR

revision of S2-2400707

China Telecom 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401781 KI #1, New Sol: Regenerative architecture. pCR

revision of S2-2400708

NEC 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401782 New Solution on Handling Awareness of Supported TAIs when RAN is onboard. pCR

revision of S2-2400794

Vivo 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401783 KI #1, New Sol: Support of Regenerative-based satellite access. pCR

revision of S2-2401020

Xiaomi 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401784 KI#1, New Sol: Architecture for regenerative-based satellite access with IWF on the S1 or N2/N3 interface. pCR

revision of S2-2401220

Intel 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401785 Enhancement of registration and PDU session establishment to support on-board S&F. pCR

revision of S2-2400088

China Mobile 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401786 KI #2: New Sol: Control plane architecture and procedure for S&F. pCR

revision of S2-2400317

Nokia, Nokia Shanghai Bell, Samsung 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401787 KI #2: New Sol: UE Reachability estimator in S&F scenario. pCR

revision of S2-2400342

Nokia, Nokia Shanghai Bell 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401788 KI#2, New Sol: Solution on enabling S&F operation and data delivery with only eNB onboard. pCR

revision of S2-2400466

LG Electronics 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401789 KI#2, New Sol: Provision of Store and Forward Satellite Specific Parameters. pCR

revision of S2-2400540

LG Electronics 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401790 KI#2, New Sol: Attach Procedure with MME and HSS on board the satellite . pCR

revision of S2-2400576

OPPO, NEC 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401791 New solution for Key Issue #2: Support of Store and Forward Satellite operation for SMS. pCR

revision of S2-2400705

China Telecom 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401792 TR 23.700-29 KI#2 Solution: Performance optimization for the transport of MT/MO S&F traffic. pCR

revision of S2-2400727

China Mobile 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401793 New Solution on Enabling S&F operation with C-SGN onboard. pCR

revision of S2-2400795

Vivo,NEC 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401794 Solution for KI#2: Support of Store and Forward Satellite operation. pCR

revision of S2-2400924

CATT 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401795 KI#2, New Sol: Initial Attach / Registration in 5GSAT network for S&F operation. pCR

revision of S2-2400985

Intel 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401796 KI #2, New Sol: Support of store and forward satellite operation in EPS. pCR

revision of S2-2401021

Xiaomi 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401797 KI#2: S&F solution for multi-satellite IoT NTN. pCR

revision of S2-2401232

Sateliot, GateHouse, Novamint 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401798 KI#2: S&F for multiple satellite deployment. pCR

revision of S2-2401313

Samsung 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401799 KI#2, New Sol: Support for SMS in 5GSAT network for S&F operation. pCR

revision of S2-2400989

Intel 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401800 KI#2: S&F for single satellite deployment. pCR

revision of S2-2401314

Samsung 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401801 Solution to KI#2: Support of Store and Forward Satellite Operation. pCR

revision of S2-2401367

Qualcomm Incorporated 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401802 KI #3, New sol: Solution of Satellite on board UPF and IMS Media Plane function selection for UE-satellite-UE communication. pCR

revision of S2-2400339

China Mobile 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401803 New Solution for Key Issue #3: Support of UE-satellite-UE communication with UPF/AGW inserted on satellite. pCR

revision of S2-2400704

China Telecom, CATT 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401804 New Solution on SMF activated UE-satellite-UE Communication for IMS Service. pCR

revision of S2-2400796

Vivo 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401805 KI#3: New Solution for UE-satellite-UE communication with UPF onboard . pCR

revision of S2-2400854

Huawei, HiSilicon 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401806 KI#3: New solution to UE-Satellite-UE Communication via UPFs onboard the satellites. pCR

revision of S2-2400926

CATT, Xiaomi 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401807 New Solution for KI#3: Solution to determine UE-SATs-UE eligibility and enable communication setup. pCR

revision of S2-2401077

Thales 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]
S2-2401837 Solution for KI#1: Support of Regenerative-based satellite access. pCR

revision of S2-2400923

CATT 23.700-29 0.2.0 FS_5GSAT_Ph3_ARCH Rel-19 S2-160-Ad Hoc-e

AI: 19.1

approved [WTS] [JSN]

148 documents (0.21359705924988 seconds)