Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
SP-220934 Stage 1 CRs on FS_FRMCS_Ph5 CR pack SA WG1 CR pack including 3 CRs:

22.989 19.0.0 CR#181 catB (S1-222325)

22.989 19.0.0 CR#171 catB (S1-222324)

22.989 19.0.0 CR#161 catC (S1-222323)

SP-97-e

AI: 19

approved [WTS] [JSN]
SP-220938 Stage 1 CR on MINT_Ph2 CR pack

revised to SP-220993, SP-221001

SA WG1 CR pack including 1 CR:

22.261 18.6.1 CR#6451 catB (S1-222346)

Rel-19 SP-97-e

AI: 19

revised [WTS] [JSN]
SP-220940 Stage 1 CR on MPS4msg CR pack SA WG1 CR pack including 1 CR:

22.153 18.1.0 CR#561 catB (S1-222348)

SP-97-e

AI: 19

approved [WTS] [JSN]
SP-220942 Stage 1 CR on DTT4MBS CR pack SA WG1 CR pack including 1 CR:

22.261 18.6.1 CR#6393 catB (S1-222350)

Rel-19 SP-97-e

AI: 19

approved [WTS] [JSN]
SP-220944 Stage 1 CR on MultiRelay CR pack SA WG1 CR pack including 1 CR:

22.261 18.6.1 CR#6512 catB (S1-222421)

Rel-19 SP-97-e

AI: 19

approved [WTS] [JSN]
SP-220993 Stage 1 CR on MINT_Ph2 CR pack

revision of SP-220938

SA WG1 CR pack including 0 CRs: Rel-19 SP-97-e

AI: 19

withdrawn [WTS] [JSN]
SP-221001 Stage 1 CR on MINT_Ph2: Add requirements on Minimization of Service Interruption During Core Network Failure CR

revision of SP-220938

Vodafone 22.261 18.6.1 CR#6452 catB MINT_Ph2 Rel-19 SP-97-e

AI: 19

approved [WTS] [JSN]

7 documents (0.40906286239624 seconds)