Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
C1-232020 | Support for Ethernet traffic via 5G ProSe layer-3 UE-to-UE relay |
CR revised to C1-232883 |
Ericsson | 24.554 18.0.0 CR#286 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232021 | Support for Ethernet traffic via 5G ProSe layer-3 UE-to-UE relay - non-unique MAC address at the source side |
CR revised to C1-233457 |
Ericsson | 24.554 18.0.0 CR#287 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
postponed | [WTS] [JSN] |
C1-232064 | Addition of ProSe Multi-path Preference |
CR revised to C1-232894 |
Intel | 24.526 18.2.0 CR#179 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232159 | Updates on path switching procedure between Uu and PC5 |
CR revised to C1-232844 |
ZTE | 24.554 18.0.0 CR#288 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232160 | Cause value "failure from 5G ProSe end UE" |
CR revised to C1-232832 |
ZTE | 24.554 18.0.0 CR#289 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232203 | PC5 Link Maintenance When Switching Path from PC5 to Uu | CR | Interdigital Inc. | 24.554 18.0.0 CR#291 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
postponed | [WTS] [JSN] |
C1-232205 | U2U link establishment with integrated discovery |
CR revised to C1-232753 |
Interdigital | 24.554 18.0.0 CR#292 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232206 | U2U link modification with integrated discovery | CR | Interdigital | 24.554 18.0.0 CR#293 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
merged | [WTS] [JSN] |
C1-232207 | Fix Relay update messages for link identifier update via 5G ProSe UE-to-UE relay UE |
CR revised to C1-232732 |
InterDigital, Inc. | 24.554 18.0.0 CR#294 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232208 | Encoding of IEs for link identifier update via 5G ProSe UE-to-UE relay UE |
CR revised to C1-232733 |
InterDigital Inc. | 24.554 18.0.0 CR#295 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232209 | Update 5G ProSe link modification procedure for the L3 UE-to-UE relay reselection procedure |
CR revised to C1-232734 |
InterDigital Inc. | 24.554 18.0.0 CR#296 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232210 | Update 5G ProSe link modification messages for the L3 UE-to-UE relay reselection procedure |
CR revised to C1-232735 |
InterDigital Inc. | 24.554 18.0.0 CR#297 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232263 | Timer allocation |
CR revised to C1-232641 |
OPPO | 24.554 18.0.0 CR#298 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232264 | IEI allocation | CR | OPPO | 24.554 18.0.0 CR#299 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232265 | Term alignment and editorial correction |
CR revised to C1-232642 |
OPPO | 24.554 18.0.0 CR#300 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232266 | Link modification purpose for U2U link establishment | CR | OPPO | 24.554 18.0.0 CR#301 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
merged | [WTS] [JSN] |
C1-232267 | Establishment reject for U2U relay congestion |
CR revised to C1-232643 |
OPPO | 24.554 18.0.0 CR#302 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232268 | L2 U2U relay selection correction |
CR revised to C1-232645 |
OPPO | 24.554 18.0.0 CR#303 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232269 | PC5 signalling message type update | CR | OPPO | 24.554 18.0.0 CR#304 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232270 | PC5 signalling protocol cause update |
CR revised to C1-232680 |
OPPO | 24.554 18.0.0 CR#305 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232271 | Add PROSE UE TO UE RELAY UPDATE REJECT message |
CR revised to C1-232644 |
OPPO | 24.554 18.0.0 CR#306 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232272 | U2N relay emergency restriction | CR | OPPO | 24.554 18.0.0 CR#307 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
merged | [WTS] [JSN] |
C1-232273 | U2N relay emergency for discovery and link mangement |
CR revised to C1-232646 |
OPPO / Rae | 24.554 18.0.0 CR#308 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232274 | Emergency RSC |
CR revised to C1-232657 |
OPPO | 24.555 18.0.0 CR#36 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232435 | Updates to support UE-to-UE relay reselection procedure | CR | Huawei, HiSilicon | 24.554 18.0.0 CR#309 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
merged | [WTS] [JSN] |
C1-232509 | Support of Emergency service for 5G ProSe UE-to-Network Relaying |
CR revised to C1-233668 |
China Telecom | 24.229 18.1.0 CR#6591 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
postponed | [WTS] [JSN] |
C1-232514 | Work plan for the CT1 part of 5G_ProSe_Ph2-CT | discussion | CATT, OPPO | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
noted | [WTS] [JSN] | |
C1-232515 | Update to U2U relay discovery procedures |
CR revised to C1-232744 |
CATT | 24.554 18.0.0 CR#310 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232516 | Update to 5G ProSe direct link establishment procedure for U2U relay |
CR revised to C1-232745 |
CATT | 24.554 18.0.0 CR#311 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232517 | 5G ProSe direct link modification for U2U relay over shared PC5 link |
CR revised to C1-232746 |
CATT | 24.554 18.0.0 CR#312 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232518 | Update to 5G ProSe direct link release procedure for U2U relay | CR | CATT | 24.554 18.0.0 CR#313 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232519 | Editorial modification to U2U relay selection and reselection procedures |
CR revised to C1-232747 |
CATT | 24.554 18.0.0 CR#314 catD | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232523 | RRC Establishment cause when RSC is dedicated for Emergency for layer-2 relay |
CR revised to C1-232901 |
Nokia, Nokia Shanghai Bell | 24.501 18.2.1 CR#5326 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232524 | Rejecting 5G ProSe direct link establishment request due to ongoing emergency service |
CR revised to C1-232903 |
Nokia, Nokia Shanghai Bell | 24.554 18.0.0 CR#315 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232525 | Releasing 5G ProSe direct link due to starting emergency service |
CR revised to C1-232904 |
Nokia, Nokia Shanghai Bell | 24.554 18.0.0 CR#316 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232526 | Correcting references to different clauses and other corrections |
CR revised to C1-232907 |
Nokia, Nokia Shanghai Bell | 24.554 18.0.0 CR#317 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232527 | Adding the reference for UE policies for 5G ProSe UE-to-UE relay | CR | Nokia, Nokia Shanghai Bell | 24.555 18.0.0 CR#37 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232543 | URSP enhancements for Multipath transmission for U2N Relay | CR | China Telecom | 24.526 18.2.0 CR#187 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
merged | [WTS] [JSN] |
C1-232549 | Support of U2U link establishment with integrated discovery | CR | China Telecom | 24.554 18.0.0 CR#318 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
postponed | [WTS] [JSN] |
C1-232551 | Support of Emergency service relaying by 5G ProSe UE-to-Network |
CR revised to C1-232858 |
China Telecom | 24.554 18.0.0 CR#319 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232562 | DP on obtaining NCGI or TAI for model B discovery | discussion | vivo / Yizhong | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
noted | [WTS] [JSN] | |
C1-232563 | Clean-up ENs in existing procedure |
CR revised to C1-232924 |
vivo | 24.554 18.0.0 CR#320 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232564 | Clarification for 5G ProSe link release procedure |
CR revised to C1-232925 |
vivo | 24.554 18.0.0 CR#321 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232565 | Handling of collision of PROSE PATH SWITCHING REQUEST message |
CR revised to C1-232926 |
vivo | 24.554 18.0.0 CR#322 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232567 | Work plan for the CT1 part of 5G_ProSe_Ph2-CT | discussion | CATT, OPPO | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
withdrawn | [WTS] [JSN] | |
C1-232568 | Update to U2U relay discovery procedures | CR | CATT / Xiaoyan | 24.554 18.0.0 CR#324 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
withdrawn | [WTS] [JSN] |
C1-232569 | Update to 5G ProSe direct link establishment procedure for U2U relay | CR | CATT / Xiaoyan | 24.554 18.0.0 CR#325 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
withdrawn | [WTS] [JSN] |
C1-232570 | 5G ProSe direct link modification for U2U relay over shared PC5 link | CR | CATT / Xiaoyan | 24.554 18.0.0 CR#326 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
withdrawn | [WTS] [JSN] |
C1-232571 | Update to 5G ProSe direct link release procedure for U2U relay | CR | CATT / Xiaoyan | 24.554 18.0.0 CR#327 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
withdrawn | [WTS] [JSN] |
C1-232572 | Editorial modification to U2U relay selection and reselection procedures | CR | CATT / Xiaoyan | 24.554 18.0.0 CR#328 catD | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
withdrawn | [WTS] [JSN] |
C1-232578 | Update target discoveree end UE in UE-to-UR relay discovery procedure |
CR revised to C1-232684 |
Xiaomi | 24.554 18.0.0 CR#329 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232579 | Update UE-to-UE Relay discovery procedure considering privacy issue |
CR revised to C1-232688 |
Xiaomi | 24.554 18.0.0 CR#330 catC | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232580 | Removing EN for the discoveree UE found directly by the discover UE for U2U relay | CR | Xiaomi | 24.554 18.0.0 CR#331 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
merged | [WTS] [JSN] |
C1-232581 | Updating UE policies for 5G ProSe UE-to-UE relay |
CR revised to C1-232690 |
Xiaomi, vivo | 24.555 18.0.0 CR#38 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232582 | Update to ProSe direct link modification messages for U2U relay |
CR revised to C1-232790 |
CATT | 24.554 18.0.0 CR#332 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232590 | 5G ProSe direct link establishment for U2U relay with integrated discovery | CR | CATT, OPPO | 24.554 18.0.0 CR#333 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
merged | [WTS] [JSN] |
C1-232591 | Provisioning RSC dedicated for emergency service |
CR revised to C1-232823 |
CATT | 24.554 18.0.0 CR#334 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232592 | Coding apsects of RSC dedicated for emergency service | CR | CATT | 24.555 18.0.0 CR#39 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
merged | [WTS] [JSN] |
C1-232602 | Validity timers for 5G ProSe policies for UE-to-UE relay | CR | Nokia, Nokia Shanghai Bell | 24.554 18.0.0 CR#335 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
merged | [WTS] [JSN] |
C1-232603 | Resolving the EN related to the configuration parameters used for UE-to-UE relay selection | CR | Nokia, Nokia Shanghai Bell | 24.554 18.0.0 CR#336 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232641 | Timer allocation |
CR revision of C1-232263 |
OPPO, Nokia, Nokia Shanghai Bell | 24.554 18.0.0 CR#2981 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232642 | Term alignment and editorial correction |
CR revision of C1-232265 |
OPPO, Nokia, Nokia Shanghai Bell | 24.554 18.0.0 CR#3001 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232643 | Establishment reject for U2U relay congestion |
CR revision of C1-232267 revised to C1-233333 |
OPPO, Nokia, Nokia Shanghai Bell | 24.554 18.0.0 CR#3021 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
postponed | [WTS] [JSN] |
C1-232644 | Add PROSE UE TO UE RELAY UPDATE REJECT message |
CR revision of C1-232271 revised to C1-232819 |
OPPO | 24.554 18.0.0 CR#3061 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232645 | L2 U2U relay selection correction |
CR revision of C1-232268 revised to C1-233331 |
OPPO | 24.554 18.0.0 CR#3031 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232646 | U2N relay emergency for discovery |
CR revision of C1-232273 revised to C1-233332 |
OPPO | 24.554 18.0.0 CR#3081 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232657 | Emergency RSC |
CR revision of C1-232274 |
OPPO, CATT, vivo | 24.555 18.0.0 CR#361 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232680 | PC5 signalling protocol cause update |
CR revision of C1-232270 |
OPPO | 24.554 18.0.0 CR#3051 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232684 | Update target discoveree end UE in UE-to-UR relay discovery procedure |
CR revision of C1-232578 |
Xiaomi | 24.554 18.0.0 CR#3291 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232688 | Update to the UE-to-UE Relay discovery procedure to support UE-to-UE relay operation |
CR revision of C1-232579 |
Xiaomi, Huawei, HiSilicon | 24.554 18.0.0 CR#3301 catC | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232690 | Updating UE policies for 5G ProSe UE-to-UE relay |
CR revision of C1-232581 |
Beijing Xiaomi Mobile Software | 24.555 18.0.0 CR#381 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232732 | Fix Relay update messages for link identifier update via 5G ProSe UE-to-UE relay UE |
CR revision of C1-232207 revised to C1-233327 |
InterDigital Inc. | 24.554 18.0.0 CR#2941 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232733 | Encoding of IEs for link identifier update via 5G ProSe UE-to-UE relay UE |
CR revision of C1-232208 |
InterDigital Inc. | 24.554 18.0.0 CR#2951 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232734 | Update 5G ProSe link modification procedure for the L3 UE-to-UE relay reselection procedure |
CR revision of C1-232209 |
InterDigital Inc., Huawei, HiSilicon | 24.554 18.0.0 CR#2961 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232735 | Update 5G ProSe link modification messages for the L3 UE-to-UE relay reselection procedure |
CR revision of C1-232210 revised to C1-233367 |
InterDigital Inc. | 24.554 18.0.0 CR#2971 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232744 | Update to U2U relay discovery procedures |
CR revision of C1-232515 |
CATT | 24.554 18.0.0 CR#3101 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232745 | Update to 5G ProSe direct link establishment procedure for U2U relay |
CR revision of C1-232516 |
CATT | 24.554 18.0.0 CR#3111 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232746 | 5G ProSe direct link modification for U2U relay over shared PC5 link |
CR revision of C1-232517 revised to C1-233402 |
CATT, OPPO, InterDigital | 24.554 18.0.0 CR#3121 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232747 | Editorial modification to U2U relay selection and reselection procedures |
CR revision of C1-232519 |
CATT | 24.554 18.0.0 CR#3141 catD | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232753 | U2U link establishment with integrated discovery |
CR revision of C1-232205 revised to C1-233376 |
Interdigital Inc., CATT, OPPO | 24.554 18.0.0 CR#2921 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
postponed | [WTS] [JSN] |
C1-232790 | Update to ProSe direct link modification messages for U2U relay |
CR revision of C1-232582 |
CATT | 24.554 18.0.0 CR#3321 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232819 | Add PROSE UE TO UE RELAY UPDATE REJECT message |
CR revision of C1-232644 |
OPPO, Ericsson | 24.554 18.0.0 CR#3062 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232823 | Provisioning RSC dedicated for emergency service |
CR revision of C1-232591 |
CATT | 24.554 18.0.0 CR#3341 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232832 | Cause value "failure from 5G ProSe end UE" |
CR revision of C1-232160 |
ZTE, Nokia, Nokia Shanghai Bell | 24.554 18.0.0 CR#2891 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232844 | Updates on path switching procedure between Uu and PC5 |
CR revision of C1-232159 |
ZTE | 24.554 18.0.0 CR#2881 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232858 | Support of Emergency service relaying by 5G ProSe UE-to-Network |
CR revision of C1-232551 revised to C1-233665 |
China Telecom, OPPO | 24.554 18.0.0 CR#3191 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232883 | Support for Ethernet traffic via 5G ProSe layer-3 UE-to-UE relay |
CR revision of C1-232020 |
Ericsson | 24.554 18.0.0 CR#2861 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232894 | Addition of ProSe Multi-path Preference |
CR revision of C1-232064 |
Intel, China Telecom | 24.526 18.2.0 CR#1791 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232901 | RRC Establishment cause when RSC is dedicated for Emergency for layer-2 relay |
CR revision of C1-232523 |
Nokia, Nokia Shanghai Bell | 24.501 18.2.1 CR#53261 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232903 | Rejecting 5G ProSe direct link establishment request due to ongoing emergency service |
CR revision of C1-232524 revised to C1-233622 |
Nokia, Nokia Shanghai Bell, OPPO | 24.554 18.0.0 CR#3151 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232904 | Releasing 5G ProSe direct link due to starting emergency service |
CR revision of C1-232525 revised to C1-233625 |
Nokia, Nokia Shanghai Bell | 24.554 18.0.0 CR#3161 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232907 | Correcting references to different clauses |
CR revision of C1-232526 |
Nokia, Nokia Shanghai Bell | 24.554 18.0.0 CR#3171 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232924 | Clean-up ENs in existing procedure |
CR revision of C1-232563 |
vivo, Xiaomi | 24.554 18.0.0 CR#3201 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
C1-232925 | Clarification for 5G ProSe link release procedure |
CR revision of C1-232564 revised to C1-232963 |
vivo | 24.554 18.0.0 CR#3211 catF | TEI18, 5G_ProSe | Rel-18 |
C1-141-e AI: 18.2.18. |
revised | [WTS] [JSN] |
C1-232926 | Handling of collision of PROSE PATH SWITCHING REQUEST message |
CR revision of C1-232565 |
vivo | 24.554 18.0.0 CR#3221 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-141-e AI: 18.2.18. |
agreed | [WTS] [JSN] |
95 documents (0.27473616600037 seconds)