Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
C1-230163 | Work plan for the CT1 part of 5G_ProSe_Ph2-CT | discussion | CATT, OPPO | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
noted | [WTS] [JSN] | |
C1-230164 | 5G ProSe U2U relay discovery over PC5 interface with model A |
CR revised to C1-230876 |
CATT | 24.554 17.3.0 CR#229 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230165 | 5G ProSe U2U relay discovery over PC5 interface with model B |
CR revised to C1-230877 |
CATT | 24.554 17.3.0 CR#230 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230166 | 5G ProSe direct discovery messages for U2U relay | CR | CATT | 24.554 17.3.0 CR#231 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
merged | [WTS] [JSN] |
C1-230167 | 5G ProSe U2U relay unicast direct communication over PC5 | CR | CATT | 24.554 17.3.0 CR#232 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230182 | Procedures for path switching between 5G ProSe UE-to-network relays |
CR revised to C1-230893 |
ZTE | 24.554 17.3.0 CR#234 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230259 | UP-PRUK ID not found from PKMF to 5G ProSe UE-to-Network Relay UE | CR | InterDigital Inc. | 24.554 17.3.0 CR#235 catA | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
withdrawn | [WTS] [JSN] |
C1-230268 | CP-PRUK ID not found from PAnF to 5G ProSe UE-to-Network Relay UE | CR | InterDigital Inc. | 24.554 17.3.0 CR#237 catA | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
withdrawn | [WTS] [JSN] |
C1-230272 | 5G ProSe direct link identifier update via 5G ProSe U2U relay UE |
CR revised to C1-230881 |
InterDigital Inc. | 24.554 17.3.0 CR#238 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230273 | 5G ProSe direct link release via U2U relay | CR | InterDigital Inc. | 24.554 17.3.0 CR#239 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
merged | [WTS] [JSN] |
C1-230274 | 5G ProSe direct link modification procedure update for U2U relay | CR | InterDigital Inc. | 24.554 17.3.0 CR#240 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
merged | [WTS] [JSN] |
C1-230278 | Relay update procedure for link identifier update via 5G ProSe UE-to-UE relay UE |
CR revised to C1-230891 |
InterDigital Inc. | 24.554 17.3.0 CR#241 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230289 | Relay update messages for link identifier update via 5G ProSe UE-to-UE relay UE |
CR revised to C1-230892 |
InterDigital Inc. | 24.554 17.3.0 CR#242 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230292 | To update the messages for 5G ProSe direct link identifier update via 5G ProSe U2U relay UE |
CR revised to C1-230890 |
InterDigital Inc. | 24.554 17.3.0 CR#243 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230299 | Configuration parameter for 5G ProSe UE-to-UE relay |
CR revised to C1-230874 |
Qualcomm Incorporated | 24.554 17.3.0 CR#244 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230300 | Discovery message encoding for UE-to-UE relay discovery |
CR revised to C1-230878 |
Qualcomm Incorporated | 24.554 17.3.0 CR#245 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230301 | IP address allocation for 5G ProSe layer-3 UE-to-UE relay | CR | Qualcomm Incorporated | 24.554 17.3.0 CR#246 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
merged | [WTS] [JSN] |
C1-230424 | Skeleton of U2U relay |
CR revised to C1-231000 |
OPPO | 24.554 17.3.0 CR#247 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230425 | General introduction of U2U relay. |
CR revised to C1-231004 |
OPPO / Rae | 24.554 17.3.0 CR#248 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230426 | U2U link establishment without integrated discovery |
CR revised to C1-230882 |
OPPO | 24.554 17.3.0 CR#249 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230427 | QoS handling for L3 U2U relay |
CR revised to C1-230897 |
OPPO | 24.554 17.3.0 CR#250 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230428 | U2U link release procedure |
CR revised to C1-230898 |
OPPO | 24.554 17.3.0 CR#251 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230487 | IP address allocation for 5G ProSe end UE in 5G ProSe layer-3 UE-to-UE relay procedure |
CR revised to C1-230896 |
CATT | 24.554 17.3.0 CR#254 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230512 | Communication path switching procedure between the direct communication path over Uu and the direct communication path over PC5 |
CR revised to C1-230894 |
vivo | 24.554 17.3.0 CR#260 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230513 | Coding aspects of path switching procedure between the direct communication path over Uu and the direct communication path over PC5 |
CR revised to C1-230895 |
vivo | 24.554 17.3.0 CR#261 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230514 | Support the coding of ProSe application to path switching mapping rules | CR | vivo | 24.555 17.3.0 CR#34 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
postponed | [WTS] [JSN] |
C1-230515 | Coding apsects of authorization and provisioning for UE-to-UE Relay |
CR revised to C1-230875 |
vivo/ Yizhong | 24.555 17.3.0 CR#35 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230516 | Introducing the feature of path switching between direct network communication path and indirect network communication path via 5G ProSe Layer-2 UE-to-Network Relay |
CR revised to C1-231005 |
vivo/ Yizhong | 24.554 17.3.0 CR#262 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230621 | Clarification for including the User info ID in the PROSE DIRECT LINK ESTABLISHMENT REQUEST message |
CR revised to C1-231007 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#270 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230622 | Introducing the User info ID information element for PC5 signalling messages |
CR revised to C1-231008 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#271 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230623 | Trigering 5G ProSe direct link release procedure on the second hop for 5G ProSe UE-to-UE relay case |
CR revised to C1-230899 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#272 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230624 | Using the 5G ProSe direct link modification procedure for UE-to-UE relay |
CR revised to C1-230880 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#273 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230625 | Using the 5G ProSe direct link modification procedure for UE-to-UE relay – Rejection scenarios |
CR revised to C1-231009 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#274 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230626 | Using the 5G ProSe direct link establishment procedure for UE-to-UE relay – Rejection scenarios |
CR revised to C1-231010 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#275 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230628 | Updating the description of different parameters to consider the 5G ProSe UE-to-UE relay case |
CR revised to C1-231006 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#276 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230629 | The UE indicates the capabilities related to supporting UE-to-UE relay |
CR revised to C1-231011 |
Nokia, Nokia Shanghai Bell | 24.501 18.1.0 CR#5133 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230630 | UE-to-UE relay selection procedure |
CR revised to C1-231035 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#277 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230631 | UE-to-UE relay reselection procedure |
CR revised to C1-230879 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#278 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230632 | Introducing the 5G ProSe UE-to-UE relay policies indicators in the Requested UE policies | CR | Nokia, Nokia Shanghai Bell | 24.587 18.0.0 CR#268 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230633 | Updating the UE-requested ProSeP provisioning procedure to consider the 5G ProSe UE-to-UE relay case | CR | Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#279 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230704 | Add “Path selection policy” and “Validity time” for 5G ProSe direct communication | CR | CTSI | 24.554 17.3.0 CR#284 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
withdrawn | [WTS] [JSN] |
C1-230705 | Add “Path selection policy” and “Validity time” for 5G ProSe direct communication | CR | China Telecom | 24.554 17.3.0 CR#285 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
merged | [WTS] [JSN] |
C1-230874 | Configuration parameter for 5G ProSe UE-to-UE relay |
CR revision of C1-230299 |
Qualcomm Incorporated | 24.554 17.3.0 CR#2441 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230875 | Coding apsects of authorization and provisioning for UE-to-UE Relay |
CR revision of C1-230515 |
vivo/ Yizhong | 24.555 17.3.0 CR#351 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230876 | 5G ProSe U2U relay discovery over PC5 interface with model A |
CR revision of C1-230164 |
CATT | 24.554 17.3.0 CR#2291 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230877 | 5G ProSe U2U relay discovery over PC5 interface with model B |
CR revision of C1-230165 |
CATT | 24.554 17.3.0 CR#2301 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230878 | Discovery message encoding for UE-to-UE relay discovery |
CR revision of C1-230300 revised to C1-231041 |
Qualcomm Incorporated | 24.554 17.3.0 CR#2451 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230879 | UE-to-UE relay reselection procedure |
CR revision of C1-230631 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2781 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230880 | Using the 5G ProSe direct link modification procedure for UE-to-UE relay |
CR revision of C1-230624 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2731 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230881 | 5G ProSe direct link identifier update via 5G ProSe U2U relay UE |
CR revision of C1-230272 |
InterDigital Inc. | 24.554 17.3.0 CR#2381 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230882 | U2U link establishment without integrated discovery |
CR revision of C1-230426 |
OPPO | 24.554 17.3.0 CR#2491 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230890 | To update the messages for 5G ProSe direct link identifier update via 5G ProSe U2U relay UE |
CR revision of C1-230292 |
InterDigital Inc. | 24.554 17.3.0 CR#2431 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230891 | Relay update procedure for link identifier update via 5G ProSe UE-to-UE relay UE |
CR revision of C1-230278 |
InterDigital Inc. | 24.554 17.3.0 CR#2411 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230892 | Relay update messages for link identifier update via 5G ProSe UE-to-UE relay UE |
CR revision of C1-230289 |
InterDigital Inc. | 24.554 17.3.0 CR#2421 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230893 | Procedures for path switching between 5G ProSe UE-to-network relays |
CR revision of C1-230182 |
ZTE | 24.554 17.3.0 CR#2341 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230894 | Communication path switching procedure between the direct communication path over Uu and the direct communication path over PC5 |
CR revision of C1-230512 |
vivo | 24.554 17.3.0 CR#2601 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230895 | Coding aspects of path switching procedure between the direct communication path over Uu and the direct communication path over PC5 |
CR revision of C1-230513 revised to C1-231044 |
vivo | 24.554 17.3.0 CR#2611 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230896 | IP address allocation for 5G ProSe end UE in 5G ProSe layer-3 UE-to-UE relay procedure |
CR revision of C1-230487 revised to C1-231022 |
CATT | 24.554 17.3.0 CR#2541 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230897 | QoS handling for L3 U2U relay |
CR revision of C1-230427 revised to C1-231029 |
OPPO | 24.554 17.3.0 CR#2501 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-230898 | U2U link release procedure |
CR revision of C1-230428 |
OPPO | 24.554 17.3.0 CR#2511 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-230899 | Trigering 5G ProSe direct link release procedure on the second hop for 5G ProSe UE-to-UE relay case |
CR revision of C1-230623 revised to C1-231045 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2721 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-231000 | Skeleton of U2U relay |
CR revision of C1-230424 |
OPPO | 24.554 17.3.0 CR#2471 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-231004 | General introduction of U2U relay. |
CR revision of C1-230425 |
OPPO / Rae | 24.554 17.3.0 CR#2481 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-231005 | Introducing the feature of path switching between direct network communication path and indirect network communication path via 5G ProSe Layer-2 UE-to-Network Relay |
CR revision of C1-230516 |
vivo/ Yizhong | 24.554 17.3.0 CR#2621 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-231006 | Updating the description of different parameters to consider the 5G ProSe UE-to-UE relay case |
CR revision of C1-230628 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2761 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-231007 | Clarification for including the User info ID in the PROSE DIRECT LINK ESTABLISHMENT REQUEST message |
CR revision of C1-230621 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2701 catF | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-231008 | Introducing the User info ID information element for PC5 signalling messages |
CR revision of C1-230622 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2711 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-231009 | Using the 5G ProSe direct link modification procedure for UE-to-UE relay – Rejection scenarios |
CR revision of C1-230625 revised to C1-231043 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2741 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-231010 | Using the 5G ProSe direct link establishment procedure for UE-to-UE relay – Rejection scenarios |
CR revision of C1-230626 revised to C1-231042 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2751 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-231011 | The UE indicates the capabilities related to supporting UE-to-UE relay |
CR revision of C1-230629 |
Nokia, Nokia Shanghai Bell | 24.501 18.1.0 CR#51331 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
postponed | [WTS] [JSN] |
C1-231022 | IP address allocation for 5G ProSe end UE in 5G ProSe layer-3 UE-to-UE relay procedure |
CR revision of C1-230896 |
CATT | 24.554 17.3.0 CR#2542 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-231029 | QoS handling for L3 U2U relay |
CR revision of C1-230897 |
OPPO | 24.554 17.3.0 CR#2502 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-231035 | UE-to-UE relay selection procedure |
CR revision of C1-230630 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2771 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-231041 | Discovery message encoding for UE-to-UE relay discovery |
CR revision of C1-230878 |
Qualcomm Incorporated | 24.554 17.3.0 CR#2452 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-231042 | Using the 5G ProSe direct link establishment procedure for UE-to-UE relay – Rejection scenarios |
CR revision of C1-231010 revised to C1-231213 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2752 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-231043 | Using the 5G ProSe direct link modification procedure for UE-to-UE relay – Rejection scenarios |
CR revision of C1-231009 revised to C1-231214 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2742 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
revised | [WTS] [JSN] |
C1-231044 | Coding aspects of path switching procedure between the direct communication path over Uu and the direct communication path over PC5 |
CR revision of C1-230895 |
vivo | 24.554 17.3.0 CR#2612 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-231045 | Trigering 5G ProSe direct link release procedure on the second hop for 5G ProSe UE-to-UE relay case |
CR revision of C1-230899 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2722 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-231213 | Using the 5G ProSe direct link establishment procedure for UE-to-UE relay – Rejection scenarios |
CR revision of C1-231042 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2753 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
C1-231214 | Using the 5G ProSe direct link modification procedure for UE-to-UE relay – Rejection scenarios |
CR revision of C1-231043 |
Nokia, Nokia Shanghai Bell | 24.554 17.3.0 CR#2743 catB | 5G_ProSe_Ph2 | Rel-18 |
C1-140 AI: 18.2.18 |
agreed | [WTS] [JSN] |
80 documents (0.27713298797607 seconds)