Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
C1-210011 MINT: solution for key issue #1 pCR

revision of C1-207323

revised to C1-210393

Ericsson, one2many / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210012 MINT: alternative 1 for key issue #2 pCR

revision of C1-207324

revised to C1-210394

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210013 MINT: alternative 2 for key issue #2 pCR

revision of C1-207325

revised to C1-210395

Ericsson, one2many / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210014 MINT: alternative 1 for key issue #3 pCR

revision of C1-207326

revised to C1-210396

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210015 MINT: alternative 2 for key issue #3 pCR

revision of C1-207327

revised to C1-210403

Ericsson, one2many / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210016 MINT: solution for key issue #5 pCR

revision of C1-207328

revised to C1-210404

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210017 MINT: solution for key issue #6 pCR

revision of C1-207329

revised to C1-210405

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210018 MINT: solution for key issue #8 pCR

revision of C1-207331

revised to C1-210407

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210019 MINT: alternative 1 for key issue #4 pCR

revision of C1-207332

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

withdrawn [WTS] [JSN]
C1-210020 MINT: alternative 2 for key issue #4 pCR

revision of C1-207333

revised to C1-210409

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210021 MINT: solution for key issue #7 pCR

revised to C1-210414

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210071 Outline of solutions in C1-210072 - C1-210079 discussion Nokia, Nokia Shanghai Bell FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

noted [WTS] [JSN]
C1-210072 New solution on Key Issue #1 pCR

revised to C1-210346

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210073 New solution on Key Issue #2 pCR

revised to C1-210279

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210074 New solution on Key Issue #3 pCR

revised to C1-210344

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210075 New solution on Key Issue #4 pCR

revised to C1-210334

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210076 New solution on Key Issue #5 pCR

revised to C1-210921

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

postponed [WTS] [JSN]
C1-210077 New solution on Key Issue #6 pCR

revised to C1-210331

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210078 New solution on Key Issue #7 pCR

revised to C1-210329

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210079 New solution on Key Issue #8 pCR

revised to C1-210328

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210084 MINT Solution for KI#1: Notification of Disaster Condition to the UE via Non-3GPP Acess pCR

revised to C1-210308

ZTE Corporation 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210108 Resilience against fake broadcast pCR Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

postponed [WTS] [JSN]
C1-210109 Applicability of MINT to roamers pCR

revised to C1-210413

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210110 Significance of an available cell pCR Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

withdrawn [WTS] [JSN]
C1-210115 Solution to MINT Key Issue #5 (PLMN selection when a "Disaster Condition" applies) pCR

revised to C1-210335

Qualcomm Incorporated / Lena 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210116 Solution to MINT Key Issue #7 (Prevention of signalling overload in PLMNs without Disaster Condition) – Alternative 1: providing disaster roaming assistance information to distribute roamers, and congestion mitigation pCR

revised to C1-210336

Qualcomm Incorporated / Lena 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210117 Solution to MINT Key Issue #3 (Indication of accessibility from other PLMNs without Disaster Condition to the UE), and Key Issue #7 (Prevention of signalling overload in PLMNs without Disaster Condition) - alternative 2, using Access Identities pCR

revised to C1-210337

Qualcomm Incorporated / Lena 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210118 Solution to MINT Key Issue #8 (Prevention of signalling overload by returning UEs in PLMN previously with Disaster Condition) pCR

revised to C1-210340

Qualcomm Incorporated / Lena 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210119 Solution to MINT Key Issue #6 (Notification that Disaster Condition is no longer applicable to the UEs) pCR

revised to C1-210342

Qualcomm Incorporated / Lena 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210126 Discussion on whether the main node in the Core Network should be considered in the Study on MINT discussion InterDigital Rel-17 C1-127-bis-e

AI: 17.2.9

noted [WTS] [JSN]
C1-210127 Staggering the arrivals of UEs in the PLMN without Disaster Condition pCR

revised to C1-210310

InterDigital 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210128 Prevention of signaling overload by returning UEs in the PLMN previously with Disaster Condition pCR

revised to C1-210311

InterDigital 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210129 Enabling the PLMN without Disaster Condition to efficiently prevent Disaster Inbound Roamers from attempting registration pCR

revised to C1-210312

InterDigital 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210143 KI#1: Indication of CN Failure pCR Apple AB 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

postponed [WTS] [JSN]
C1-210144 KI#3: Broadcast of disaster roaming indication pCR

revised to C1-210350

Apple AB 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210145 KI#5: Considerations for PLMN selection in a "Disaster Condition" pCR

revised to C1-210351

Apple AB 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210146 KI#7: Introduction of a new access category pCR Apple AB 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

merged [WTS] [JSN]
C1-210147 KI#7: Enhancements to UAC barring information pCR

revised to C1-210352

Apple AB 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210148 FS_MINT: Discussion on Solution for Key Issues #3,#4,#5,#7,#8 discussion

revised to C1-210259

HiSilicon Technologies Co. Ltd FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210149 KI#8: Network controlled return of UEs at the end of disaster condition pCR

revised to C1-210353

Apple AB 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210150 FS_MINT: Solution for Key issue #3 pCR

revised to C1-210376

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210151 FS_MINT: Solution for Key issue #4 pCR

revised to C1-210377

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210152 FS_MINT: Solution for Key issue #5 pCR

revised to C1-210378

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210153 FS_MINT: Solution for Key issue #7 pCR

revised to C1-210379

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210154 Solution to KI#1 & part of KI#7: Indicating, via non-3GPP access, the applicability of a disaster condition to the 3GPP access of the same PLMN pCR

revised to C1-210309

Samsung Guangzhou Mobile R&D 24.811 0.1.0 MINT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210155 FS_MINT: Solution for Key issue #8 pCR

revised to C1-210380

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210156 FS_MINT: New Key Issue #Y: Manual PLMN Selection pCR

revised to C1-210381

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210157 FS_MINT: Solution for New Key issue #Y: Manual PLMN Selection pCR

revised to C1-210382

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210158 Solution to KI#6 and KI#8: Indicating, via non-3GPP access, the end of a disaster condition that was applicable to the 3GPP access of the same PLMN pCR

revised to C1-210304

Samsung Guangzhou Mobile R&D 24.811 0.1.0 MINT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210163 Solution to KI#4: Confining a Disaster Inbound Roamer UE’s area of service to the area of the disaster condition pCR

revised to C1-210307

Samsung Guangzhou Mobile R&D 24.811 0.1.0 MINT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210166 Solution to KI#7: Preventing 5GSM-level congestion on a PLMN without a disaster condition pCR Samsung Guangzhou Mobile R&D 24.811 0.1.0 MINT Rel-17 C1-127-bis-e

AI: 17.2.9

postponed [WTS] [JSN]
C1-210167 Update to KI#7 – Prevention of congestion 5GSM level congestion pCR Samsung Guangzhou Mobile R&D 24.811 0.1.0 MINT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210168 Updates to Architectural Assumptions pCR

revised to C1-210319

Samsung Guangzhou Mobile R&D 24.811 0.1.0 MINT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210177 The quick return to PLMN with Disaster Condition pCR

revised to C1-210391

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210178 Architectural Assumptions pCR

revised to C1-210370

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210179 Architectural Requirements pCR

revised to C1-210371

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210180 Updates to KI#2 pCR

revised to C1-210372

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210181 Updates to KI#4 pCR

revised to C1-210373

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210182 DRS-supported PLMN list pCR

revised to C1-210374

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210183 Recommended PLMN without Disaster Condition pCR

revised to C1-210375

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210184 Disaster condition information delivered to UE via broadcast pCR

revised to C1-210325

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210185 PLMN selection base on DRS-Supported PLMN list pCR

revised to C1-210326

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210208 Discussion on solutions for KI#2 and KI#6 for MINT discussion Huawei, HiSlicon/Lin FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

noted [WTS] [JSN]
C1-210209 Solution for KI#2: O&M-based solution pCR

revised to C1-210357

Huawei, HiSlicon/Lin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210210 Solution for KI#6: O&M-based solution pCR

revised to C1-210270

Huawei, HiSlicon/Lin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210211 Solution for KI#6: UE-based solution pCR

revised to C1-210271

Huawei, HiSlicon/Lin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210212 Correction on KI#6 pCR

revised to C1-210359

Huawei, HiSlicon/Lin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210220 Architectural Assumption on the CN failure scenario pCR

revised to C1-210365

LG Electronics / SangMin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210221 Work Plan for FS_MINT-CT discussion LG Electronics / SangMin FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

noted [WTS] [JSN]
C1-210222 New solution to KI#5: Handling of forbidden PLMN list pCR

revised to C1-210366

LG Electronics / SangMin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210224 New solution to KI#6: NAS based notification pCR

revised to C1-210367

LG Electronics / SangMin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210225 New solution to KI#7: Congestion control for inbound disaster roamers pCR LG Electronics / SangMin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

postponed [WTS] [JSN]
C1-210230 Updates to KI#1 pCR

revised to C1-210368

LG Electronics / SangMin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210240 MINT: Discussion on New Key Issue for Manual PLMN Selection discussion Huawei, HiSilicon / Vishnu FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

noted [WTS] [JSN]
C1-210259 FS_MINT: Discussion on Solution for Key Issues #3,#4,#5,#7,#8 discussion

revision of C1-210148

Huawei, HiSilicon / Vishnu FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

noted [WTS] [JSN]
C1-210270 Solution for KI#6: O&M-based solution pCR

revision of C1-210210

revised to C1-210363

Huawei, HiSlicon/Lin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210271 Solution for KI#6: UE-based solution pCR

revision of C1-210211

revised to C1-210364

Huawei, HiSlicon/Lin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210279 New solution on Key Issue #2 pCR

revision of C1-210073

revised to C1-210423

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210304 Solution to KI#6 and KI#8: Indicating, via non-3GPP access, the end of a disaster condition that was applicable to the 3GPP access of the same PLMN pCR

revision of C1-210158

Samsung Guangzhou Mobile R&D 24.811 0.1.0 MINT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210307 Solution to KI#4: Confining a Disaster Inbound Roamer UE’s area of service to the area of the disaster condition pCR

revision of C1-210163

Samsung Guangzhou Mobile R&D 24.811 0.1.0 MINT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210308 MINT Solution for KI#1: Notification of Disaster Condition to the UE via Non-3GPP Acess pCR

revision of C1-210084

ZTE Corporation 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210309 Solution to KI#1 & part of KI#7: Indicating, via non-3GPP access, the applicability of a disaster condition to the 3GPP access of the same PLMN pCR

revision of C1-210154

Samsung Guangzhou Mobile R&D 24.811 0.1.0 MINT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210310 Staggering the arrivals of UEs in the PLMN without Disaster Condition pCR

revision of C1-210127

InterDigital 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

postponed [WTS] [JSN]
C1-210311 Prevention of signaling overload by returning UEs in the PLMN previously with Disaster Condition pCR

revision of C1-210128

revised to C1-210315

InterDigital 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210312 Enabling the PLMN without Disaster Condition to efficiently prevent Disaster Inbound Roamers from attempting registration pCR

revision of C1-210129

InterDigital 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210315 Prevention of signaling overload by returning UEs in the PLMN previously with Disaster Condition pCR

revision of C1-210311

InterDigital 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210319 Updates to Architectural Assumptions pCR

revision of C1-210168

Samsung Guangzhou Mobile R&D 24.811 0.1.0 MINT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210325 Disaster condition information delivered to UE via broadcast pCR

revision of C1-210184

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210326 PLMN selection base on DRS-Supported PLMN list pCR

revision of C1-210185

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210328 New solution on Key Issue #8 pCR

revision of C1-210079

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210329 New solution on Key Issue #7 pCR

revision of C1-210078

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210331 New solution on Key Issue #6 pCR

revision of C1-210077

revised to C1-210432

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210334 New solution on Key Issue #4 pCR

revision of C1-210075

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210335 Solution to MINT Key Issue #5 (PLMN selection when a "Disaster Condition" applies) pCR

revision of C1-210115

Qualcomm Incorporated / Lena 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210336 Solution to MINT Key Issue #7 (Prevention of signalling overload in PLMNs without Disaster Condition) – Alternative 1: providing disaster roaming assistance information to distribute roamers, and congestion mitigation pCR

revision of C1-210116

Qualcomm Incorporated / Lena 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210337 Solution to MINT Key Issue #3 (Indication of accessibility from other PLMNs without Disaster Condition to the UE), and Key Issue #7 (Prevention of signalling overload in PLMNs without Disaster Condition) - alternative 2, using Access Identities pCR

revision of C1-210117

Qualcomm Incorporated / Lena 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210340 Solution to MINT Key Issue #8 (Prevention of signalling overload by returning UEs in PLMN previously with Disaster Condition) pCR

revision of C1-210118

Qualcomm Incorporated / Lena 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210342 Solution to MINT Key Issue #6 (Notification that Disaster Condition is no longer applicable to the UEs) pCR

revision of C1-210119

Qualcomm Incorporated / Lena 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210344 New solution on Key Issue #3 pCR

revision of C1-210074

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210346 New solution on Key Issue #1 pCR

revision of C1-210072

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210350 KI#3: Broadcast of disaster roaming indication pCR

revision of C1-210144

Apple AB 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

postponed [WTS] [JSN]
C1-210351 KI#5: Considerations for PLMN selection in a "Disaster Condition" pCR

revision of C1-210145

Apple AB 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210352 KI#7: Enhancements to UAC barring information pCR

revision of C1-210147

Apple AB 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210353 KI#8: Network controlled return of UEs at the end of disaster condition pCR

revision of C1-210149

Apple AB 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210357 Solution for KI#2: O&M-based solution pCR

revision of C1-210209

Huawei, HiSlicon/Lin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210359 Correction on KI#6 pCR

revision of C1-210212

Huawei, HiSlicon/Lin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210363 Solution for KI#6: O&M-based solution pCR

revision of C1-210270

Huawei, HiSlicon/Lin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210364 Solution for KI#6: UE-based solution pCR

revision of C1-210271

Huawei, HiSlicon/Lin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210365 Architectural Assumption on the CN failure scenario pCR

revision of C1-210220

LG Electronics, Huawei, HiSilicon, Ericsson / SangMin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210366 New solution to KI#5: Handling of forbidden PLMN list pCR

revision of C1-210222

revised to C1-210415

LG Electronics / SangMin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210367 New solution to KI#6: NAS based notification pCR

revision of C1-210224

LG Electronics / SangMin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210368 Updates to KI#1 pCR

revision of C1-210230

LG Electronics / SangMin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210370 Architectural Assumptions pCR

revision of C1-210178

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210371 Architectural Requirements pCR

revision of C1-210179

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210372 Updates to KI#2 pCR

revision of C1-210180

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210373 Updates to KI#4 pCR

revision of C1-210181

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210374 DRS-supported PLMN list pCR

revision of C1-210182

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210375 Recommended PLMN without Disaster Condition pCR

revision of C1-210183

vivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210376 FS_MINT: Solution for Key issue #3 pCR

revision of C1-210150

revised to C1-210425

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210377 FS_MINT: Solution for Key issue #4 pCR

revision of C1-210151

revised to C1-210426

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210378 FS_MINT: Solution for Key issue #5 pCR

revision of C1-210152

revised to C1-210427

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210379 FS_MINT: Solution for Key issue #7 pCR

revision of C1-210153

revised to C1-210428

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210380 FS_MINT: Solution for Key issue #8 pCR

revision of C1-210155

revised to C1-210429

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210381 FS_MINT: New Key Issue #Y: Manual PLMN Selection pCR

revision of C1-210156

revised to C1-210424

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

revised [WTS] [JSN]
C1-210382 FS_MINT: Solution for New Key issue #Y: Manual PLMN Selection pCR

revision of C1-210157

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

postponed [WTS] [JSN]
C1-210391 The quick return to PLMN with Disaster Condition pCR

revision of C1-210177

VIVO TECH GmbH 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210393 MINT: solution for key issue #1 pCR

revision of C1-210011

Ericsson, one2many, LG Electronics / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210394 MINT: alternative 1 for key issue #2 pCR

revision of C1-210012

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210395 MINT: alternative 2 for key issue #2 pCR

revision of C1-210013

Ericsson, one2many / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210396 MINT: alternative 1 for key issue #3 pCR

revision of C1-210014

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210403 MINT: alternative 2 for key issue #3 pCR

revision of C1-210015

Ericsson, one2many / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210404 MINT: solution for key issue #5 pCR

revision of C1-210016

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210405 MINT: solution for key issue #6 pCR

revision of C1-210017

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210407 MINT: solution for key issue #8 pCR

revision of C1-210018

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210409 MINT: alternative 2 for key issue #4 pCR

revision of C1-210020

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

postponed [WTS] [JSN]
C1-210413 Applicability of MINT to roamers pCR

revision of C1-210109

Ericsson / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210414 MINT: solution for key issue #7 pCR

revision of C1-210021

Ericsson, Apple, vivo / Ivo 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210415 New solution to KI#5: Handling of forbidden PLMN list pCR

revision of C1-210366

LG Electronics / SangMin 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210423 New solution on Key Issue #2 pCR

revision of C1-210279

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210424 FS_MINT: New Key Issue #Y: Manual PLMN Selection pCR

revision of C1-210381

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210425 FS_MINT: Solution for Key issue #3 pCR

revision of C1-210376

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210426 FS_MINT: Solution for Key issue #4 pCR

revision of C1-210377

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210427 FS_MINT: Solution for Key issue #5 pCR

revision of C1-210378

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210428 FS_MINT: Solution for Key issue #7 pCR

revision of C1-210379

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210429 FS_MINT: Solution for Key issue #8 pCR

revision of C1-210380

Huawei, HiSilicon / Vishnu 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]
C1-210432 New solution on Key Issue #6 pCR

revision of C1-210331

Nokia, Nokia Shanghai Bell 24.811 0.1.0 FS_MINT-CT Rel-17 C1-127-bis-e

AI: 17.2.9

agreed [WTS] [JSN]

146 documents (0.30387306213379 seconds)