Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
SP-170004 | LS from ETSI TC EE: Liaison to 3GPP SA on Energy Efficiency in Mobile Networks |
LS in source LS: EE(16)050035r2 LS To: TSG SA, SA WG5 revision of SP-160765 revised to SP-170285 |
ETSI TC EE |
SP-75 AI: 16P.1 |
postponed | [WTS] [JSN] | |||
SP-170179 | Solution for energy efficient operation of multi-RAT cellular networks |
discussion revised to SP-170224 |
Deutsche Telekom |
SP-75 AI: 16P.1 |
revised | [WTS] [JSN] | |||
SP-170189 | Assessment of Key Issue 1: Energy Efficiency KPI Definitions |
pCR revised to SP-170255 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
revised | [WTS] [JSN] |
SP-170190 | Assessment of Key Issue 2/Solution 3: The Energy Efficiency Control Framework |
pCR revised to SP-170256 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
revised | [WTS] [JSN] |
SP-170191 | Assessment of Key Issue 3/Solution 4: Coordinated Energy Saving between RAN resources and other systems |
pCR revised to SP-170257 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
revised | [WTS] [JSN] |
SP-170192 | Considerations of Power Consumption Reduction at the Site Level |
pCR revised to SP-170222 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
revised | [WTS] [JSN] |
SP-170193 | Considerations of Architecture & Functions Considerations for Energy Efficiency in 3GPP Systems |
pCR revised to SP-170223 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
revised | [WTS] [JSN] |
SP-170194 | Considerations of Network Loads in Energy Efficiency KPI |
pCR revised to SP-170254 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
revised | [WTS] [JSN] |
SP-170195 | Additional Considerations of 3GPP System Energy Efficiency Requirements and Principles |
pCR revised to SP-170253 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
revised | [WTS] [JSN] |
SP-170196 | Removals of Editors’ Notes | pCR | Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
approved | [WTS] [JSN] |
SP-170197 | Conclusion for EE with NFV |
pCR revised to SP-170259 |
Huawei | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
revised | [WTS] [JSN] |
SP-170198 | Conclusion for EE in SON |
pCR revised to SP-170260 |
Huawei | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
revised | [WTS] [JSN] |
SP-170222 | Considerations of Power Consumption Reduction at the Site Level |
pCR revision of SP-170192 revised to SP-170258 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
revised | [WTS] [JSN] |
SP-170223 | Considerations of Architecture & Functions Considerations for Energy Efficiency in 3GPP Systems |
pCR revision of SP-170193 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
noted | [WTS] [JSN] |
SP-170224 | Solution for energy efficient operation of multi-RAT cellular networks |
pCR revision of SP-170179 revised to SP-170252 |
Deutsche Telekom, Huawei | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
revised | [WTS] [JSN] |
SP-170252 | Solution for energy efficient operation of multi-RAT cellular networks |
pCR revision of SP-170224 |
Deutsche Telekom, Huawei | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
approved | [WTS] [JSN] |
SP-170253 | Additional Considerations of 3GPP System Energy Efficiency Requirements and Principles |
pCR revision of SP-170195 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
approved | [WTS] [JSN] |
SP-170254 | Considerations of Network Loads in Energy Efficiency KPI |
pCR revision of SP-170194 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
approved | [WTS] [JSN] |
SP-170255 | Assessment of Key Issue 1: Energy Efficiency KPI Definitions |
pCR revision of SP-170189 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
approved | [WTS] [JSN] |
SP-170256 | Assessment of Key Issue 2/Solution 3: The Energy Efficiency Control Framework |
pCR revision of SP-170190 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
approved | [WTS] [JSN] |
SP-170257 | Assessment of Key Issue 3/Solution 4: Coordinated Energy Saving between RAN resources and other systems |
pCR revision of SP-170191 revised to SP-170275 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
revised | [WTS] [JSN] |
SP-170258 | Considerations of Power Consumption Reduction at the Site Level |
pCR revision of SP-170222 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
approved | [WTS] [JSN] |
SP-170259 | Conclusion for EE with NFV |
pCR revision of SP-170197 |
Huawei | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
approved | [WTS] [JSN] |
SP-170260 | Conclusion for EE in SON |
pCR revision of SP-170198 |
Huawei | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
approved | [WTS] [JSN] |
SP-170275 | Assessment of Key Issue 3/Solution 4: Coordinated Energy Saving between RAN resources and other systems |
pCR revision of SP-170257 |
Orange | 21.866 1.1.1 | FS_ENEFF | Rel-14 |
SP-75 AI: 16P.1 |
approved | [WTS] [JSN] |
25 documents (0.42804098129272 seconds)