Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
C3-154042 | Include the PCC architeture figures in 29.213 |
CR revised to C3-154272 |
ZTE, Nokia Networks, Alcatel-Lucent | 29.213 13.3.0 CR#622 catB | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
revised | [WTS] [JSN] |
C3-154043 | Update the PCC architecture figures in 29.212 |
CR revised to C3-154273 |
ZTE, Nokia Networks, Alcatel-Lucent | 29.212 13.3.0 CR#1360 catB | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
revised | [WTS] [JSN] |
C3-154044 | Update the PCC architecture figures in 29.214 |
CR revised to C3-154274 |
ZTE, Nokia Networks, Alcatel-Lucent | 29.214 13.3.0 CR#422 catB | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
revised | [WTS] [JSN] |
C3-154045 | Update the PCC architecture figures in 29.215 |
CR revised to C3-154275 |
ZTE, Nokia Networks, Alcatel-Lucent | 29.215 13.3.0 CR#390 catB | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
revised | [WTS] [JSN] |
C3-154046 | Update the PCC architecture figures in 29.217 |
CR revised to C3-154276 |
ZTE, Nokia Networks, Alcatel-Lucent | 29.217 13.1.0 CR#11 catB | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
revised | [WTS] [JSN] |
C3-154047 | Update the PCC architecture figures in 29.219 |
CR revised to C3-154277 |
ZTE, Nokia Networks, Alcatel-Lucent | 29.219 13.1.0 CR#40 catB | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
revised | [WTS] [JSN] |
C3-154048 | Update the PCC architecture figures in 29.201 |
CR revised to C3-154278 |
ZTE, Nokia Networks, Alcatel-Lucent | 29.201 13.2.0 CR#32 catB | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
revised | [WTS] [JSN] |
C3-154110 | BCM handling at IP-CAN session establishment and modification | CR | Ericsson | 29.212 13.3.0 CR#1367 catF | SAES-St3-PCC, TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
agreed | [WTS] [JSN] |
C3-154116 | APN AMBR change at a certain time on Gx | discussion | Verizon, Alcatel-Lucent | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
postponed | [WTS] [JSN] | |
C3-154117 | APN AMBR change at a certain time on Gx | CR | Alcatel-Lucent, Verizon | 29.213 13.3.0 CR#627 catB | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
postponed | [WTS] [JSN] |
C3-154118 | APN AMBR change at a certain time on Gx | CR | Alcatel-Lucent, Verizon | 29.212 13.3.0 CR#1369 catB | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
postponed | [WTS] [JSN] |
C3-154119 | LS on APN AMBR change at a certain time on Gx |
LS out revised to C3-154270 |
Alcatel-Lucent | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
revised | [WTS] [JSN] | |
C3-154270 | LS on APN AMBR change at a certain time on Gx |
LS out LS To: WG SA2 revision of C3-154119 revised to C3-154303 |
Alcatel-Lucent | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
revised | [WTS] [JSN] | |
C3-154272 | Include the PCC architeture figures in 29.213 |
CR revision of C3-154042 revised to C3-154291 |
ZTE, Nokia Networks, Alcatel-Lucent, Ericsson | 29.213 13.3.0 CR#6221 catB | TEI13, SAES-St3-PCC | Rel-13 |
C3-82 AI: 13.27.2 |
revised | [WTS] [JSN] |
C3-154273 | Update the PCC architecture figures in 29.212 |
CR revision of C3-154043 |
ZTE, Nokia Networks, Alcatel-Lucent, Ericsson | 29.212 13.3.0 CR#13601 catB | TEI13, SAES-St3-PCC | Rel-13 |
C3-82 AI: 13.27.2 |
agreed | [WTS] [JSN] |
C3-154274 | Update the PCC architecture figures in 29.214 |
CR revision of C3-154044 |
ZTE, Nokia Networks, Alcatel-Lucent, Ericsson | 29.214 13.3.0 CR#4221 catB | TEI13, SAES-St3-PCC | Rel-13 |
C3-82 AI: 13.27.2 |
agreed | [WTS] [JSN] |
C3-154275 | Update the PCC architecture figures in 29.215 |
CR revision of C3-154045 |
ZTE, Nokia Networks, Alcatel-Lucent, Ericsson | 29.215 13.3.0 CR#3901 catB | TEI13, SAES-St3-PCC | Rel-13 |
C3-82 AI: 13.27.2 |
agreed | [WTS] [JSN] |
C3-154276 | Update the PCC architecture figures in 29.217 |
CR revision of C3-154046 |
ZTE, Nokia Networks, Alcatel-Lucent, Ericsson | 29.217 13.1.0 CR#111 catB | TEI13, SAES-St3-PCC | Rel-13 |
C3-82 AI: 13.27.2 |
agreed | [WTS] [JSN] |
C3-154277 | Update the PCC architecture figures in 29.219 |
CR revision of C3-154047 |
ZTE, Nokia Networks, Alcatel-Lucent, Ericsson | 29.219 13.1.0 CR#401 catB | TEI13, SAES-St3-PCC | Rel-13 |
C3-82 AI: 13.27.2 |
agreed | [WTS] [JSN] |
C3-154278 | Update the PCC architecture figures in 29.201 |
CR revision of C3-154048 |
ZTE, Nokia Networks, Alcatel-Lucent, Ericsson | 29.201 13.2.0 CR#321 catB | TEI13, SAES-St3-PCC | Rel-13 |
C3-82 AI: 13.27.2 |
agreed | [WTS] [JSN] |
C3-154291 | Include the PCC architeture figures in 29.213 |
CR revision of C3-154272 revised to C3-155154 |
ZTE, Nokia Networks, Alcatel-Lucent, Ericsson | 29.213 13.3.0 CR#6222 catB | TEI13, SAES-St3-PCC | Rel-13 |
C3-82 AI: 13.27.2 |
agreed | [WTS] [JSN] |
C3-154303 | LS on APN AMBR change at a certain time on Gx |
LS out LS To: WG SA2 revision of C3-154270 revised to C3-154324 |
Alcatel-Lucent | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
revised | [WTS] [JSN] | |
C3-154324 | LS on APN AMBR change at a certain time on Gx |
LS out LS To: WG SA2 revision of C3-154303 revised to C3-154335 |
WG CT3 | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
revised | [WTS] [JSN] | |
C3-154335 | LS on APN AMBR change at a certain time on Gx |
LS out LS To: WG SA2 revision of C3-154324 |
WG CT3 | TEI13 | Rel-13 |
C3-82 AI: 13.27.2 |
approved | [WTS] [JSN] |
24 documents (0.33192706108093 seconds)