Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R3-210102 | Reducing the Service Interruption for IAB | discussion | CATT | NR_IAB_enh | Rel-17 |
R3-111-e AI: 13.2.2 |
available | [WTS] [JSN] | |
R3-210217 | Discussion on service interruption reduction for Rel-17 IAB | discussion | Samsung | NR_IAB_enh | Rel-17 |
R3-111-e AI: 13.2.2 |
available | [WTS] [JSN] | |
R3-210348 | Interruption time reduction for Intra-donor IAB-node Migration | discussion | Qualcomm Incorporated | NR_IAB_enh | Rel-17 |
R3-111-e AI: 13.2.2 |
available | [WTS] [JSN] | |
R3-210390 | Mitigation of Unnecessary Transmission | discussion | Intel Deutschland GmbH | Rel-17 |
R3-111-e AI: 13.2.2 |
available | [WTS] [JSN] | ||
R3-210459 | Discussion on reduction of service interruption | discussion | Fujitsu | NR_IAB_enh-Core | Rel-17 |
R3-111-e AI: 13.2.2 |
available | [WTS] [JSN] | |
R3-210488 | Discussion on Reduction of Service Interruption during Intra-Donor Topology Adaptation | discussion | Nokia, Nokia Shanghai Bell |
R3-111-e AI: 13.2.2 |
available | [WTS] [JSN] | |||
R3-210548 | Inter-CU RLF recovery procedure | discussion | Huawei | NR_IAB_enh | Rel-17 |
R3-111-e AI: 13.2.2 |
available | [WTS] [JSN] | |
R3-210657 | Service interruption reduction for intra-donor migration of IAB-node with descendant nodes | discussion | AT&T |
R3-111-e AI: 13.2.2 |
available | [WTS] [JSN] | |||
R3-210716 | Discussion on reduction of service interruption in intra-donor migration and RLF recovery scenario | discussion | ZTE |
R3-111-e AI: 13.2.2 |
available | [WTS] [JSN] | |||
R3-210723 | Reduction of Service Interruption in IAB Networks | discussion | Ericsson | NR_IAB_enh |
R3-111-e AI: 13.2.2 |
available | [WTS] [JSN] | ||
R3-211003 | CB: # 36_IAB_Reduction_of_SrvInt - Summary of email discussion |
discussion revised to R3-211222 |
Nokia - moderator |
R3-111-e AI: 13.2.2 |
revised | [WTS] [JSN] | |||
R3-211222 | CB: # 36_IAB_Reduction_of_SrvInt - Summary of email discussion |
discussion revision of R3-211003 revised to R3-211265 |
Nokia - moderator |
R3-111-e AI: 13.2.2 |
revised | [WTS] [JSN] | |||
R3-211223 | [draft] LS on using MOBIKE in Integrated Access and Backhaul system |
LS out LS To: SA WG3 revised to R3-211266 |
Nokia | NR_IAB_enh-Core | Rel-17 |
R3-111-e AI: 13.2.2 |
revised | [WTS] [JSN] | |
R3-211265 | CB: # 36_IAB_Reduction_of_SrvInt - Summary of email discussion |
discussion revision of R3-211222 |
Nokia - moderator |
R3-111-e AI: 13.2.2 |
noted | [WTS] [JSN] | |||
R3-211266 | [draft] LS on using MOBIKE in Integrated Access and Backhaul system |
LS out LS To: SA WG3 revision of R3-211223 revised to R3-211297 |
Nokia | NR_IAB_enh-Core | Rel-17 |
R3-111-e AI: 13.2.2 |
revised | [WTS] [JSN] | |
R3-211297 | LS on using MOBIKE in Integrated Access and Backhaul system |
LS out LS To: SA WG3 revision of R3-211266 |
Nokia | NR_IAB_enh-Core | Rel-17 |
R3-111-e AI: 13.2.2 |
agreed | [WTS] [JSN] |
16 documents (0.32278895378113 seconds)