Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
C1-161556 Corrections for sematic of spare bits and reserved values CR Ericsson / Ivo 24.161 13.0.0 CR#1 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

agreed [WTS] [JSN]
C1-161557 Corrections for SCM protocol configuration options item CR Ericsson / Ivo 24.161 13.0.0 CR#2 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

agreed [WTS] [JSN]
C1-161558 Corrections for NBIFOM_GENERIC_CONTAINER attribute CR Ericsson / Ivo 24.161 13.0.0 CR#3 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

agreed [WTS] [JSN]
C1-161559 Corrections for bit numbering in Figure 6.1.4-2 CR Ericsson / Ivo 24.161 13.0.0 CR#4 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

agreed [WTS] [JSN]
C1-161656 Update abbreviations list CR ZTE/Joy 24.161 13.0.0 CR#5 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

agreed [WTS] [JSN]
C1-161657 Removal of editor’s notes and correction to Network-initiated IP flow mobility procedure CR

revised to C1-161688

ZTE/Joy 24.161 13.0.0 CR#6 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

revised [WTS] [JSN]
C1-161658 Reference subclause number correction CR ZTE/Joy 24.161 13.0.0 CR#7 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

merged [WTS] [JSN]
C1-161688 Removal of editor’s notes and correction to Network-initiated IP flow mobility procedure CR

revision of C1-161657

revised to C1-161989

ZTE/Joy 24.161 13.0.0 CR#61 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

revised [WTS] [JSN]
C1-161708 Network behaviour on Network-initiated IP flow mobility CR Huawei, HiSilicon /youyang 24.161 13.0.0 CR#8 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

merged [WTS] [JSN]
C1-161709 UE-initiated IP flow mobility CR

revised to C1-161990

Huawei, HiSilicon /youyang 24.161 13.0.0 CR#9 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

revised [WTS] [JSN]
C1-161710 PDN connectivity modification procedure CR

revised to C1-161991

Huawei, HiSilicon /youyang 24.244 13.2.0 CR#33 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

revised [WTS] [JSN]
C1-161711 Correction on removal of an access CR

revised to C1-161992

Huawei, HiSilicon /youyang 24.161 13.0.0 CR#10 catD NBIFOM-CT Rel-13 C1-97

AI: 13.16

revised [WTS] [JSN]
C1-161793 Re-title, re-naming, adjusting referencings, re-wordings and typo corrections CR

revised to C1-161988

Intel Corporation (UK) Ltd 24.161 13.0.0 CR#11 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

revised [WTS] [JSN]
C1-161794 Perform 3GPP access specific procedures only when UE is in that 3GPP acccess CR

revised to C1-161993

Intel Corporation (UK) Ltd 24.161 13.0.0 CR#12 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

revised [WTS] [JSN]
C1-161795 Wrong 24.008 subclause referenced for NBIFOM container CR Intel Corporation (UK) Ltd 24.301 13.5.0 CR#2369 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

agreed [WTS] [JSN]
C1-161848 NW-initiated access removal for reactivation requested case CR

revised to C1-161994

QUALCOMM Incorporated / Amer 24.161 13.0.0 CR#13 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

revised [WTS] [JSN]
C1-161850 Discussion on network-initiated NB-IFOM connection release discussion QUALCOMM CDMA Technologies NBIFOM-CT C1-97

AI: 13.16

noted [WTS] [JSN]
C1-161914 Handling of Reactivation Requested cause when NBIFOM CR Nokia 24.161 13.0.0 CR#14 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

withdrawn [WTS] [JSN]
C1-161988 Re-title, re-naming, adjusting referencings, re-wordings and typo corrections CR

revision of C1-161793

Intel Corporation, ZTE, Ericsson 24.161 13.0.0 CR#111 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

agreed [WTS] [JSN]
C1-161989 Removal of editor’s notes and correction to Network-initiated IP flow mobility procedure CR

revision of C1-161688

ZTE, Huawei, HiSilicon 24.161 13.0.0 CR#62 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

agreed [WTS] [JSN]
C1-161990 UE-initiated IP flow mobility CR

revision of C1-161709

Huawei, HiSilicon /youyang 24.161 13.0.0 CR#91 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

agreed [WTS] [JSN]
C1-161991 PDN connectivity modification procedure CR

revision of C1-161710

revised to C1-162159

Huawei, HiSilicon /youyang 24.244 13.2.0 CR#331 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

revised [WTS] [JSN]
C1-161992 Scenario about the removal of an access from NBIFOM PDN CR

revision of C1-161711

Huawei, HiSilicon /youyang 24.161 13.0.0 CR#101 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

agreed [WTS] [JSN]
C1-161993 Perform 3GPP access specific procedures only when UE is in that 3GPP acccess CR

revision of C1-161794

Intel Corporation (UK) Ltd 24.161 13.0.0 CR#121 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

agreed [WTS] [JSN]
C1-161994 NW-initiated access removal for reactivation requested case CR

revision of C1-161848

revised to C1-162168

QUALCOMM Incorporated / Amer 24.161 13.0.0 CR#131 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

revised [WTS] [JSN]
C1-162159 PDN connectivity modification procedure CR

revision of C1-161991

Huawei, HiSilicon /youyang 24.244 13.2.0 CR#332 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

agreed [WTS] [JSN]
C1-162168 NW-initiated access removal for reactivation requested case CR

revision of C1-161994

revised to C1-162675

QUALCOMM Incorporated / Amer 24.161 13.0.0 CR#132 catF NBIFOM-CT Rel-13 C1-97

AI: 13.16

postponed [WTS] [JSN]

27 documents (0.32647609710693 seconds)