Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-1903248 | Data forwarding to minimize user data interruption during HO |
discussion revised to R2-1905893 |
Mediatek Inc. |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |||
R2-1903256 | Source Cell Detaching for Minimizing User Data Interruption during HO |
discussion revised to R2-1905896 |
Mediatek Inc. |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |||
R2-1903265 | Consideration on Mobility Interruption Reduction in Different Scenarios |
discussion revised to R2-1905895 |
Mediatek Inc. |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |||
R2-1903266 | [Draft] LS on data forwarding enhancements to minimize user data interruption during HO |
LS out LS To: RAN3 revised to R2-1905894 |
Mediatek Inc. | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903268 | Single/Dual RRC for simultaneous connectivity during HO |
discussion revision of R2-1900444 revised to R2-1905897 |
MediaTek Inc. | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | ||
R2-1903306 | Discussion on single/dual active protocol stack | discussion | OPPO | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903308 | Further details on eMBB-based handover for LTE mobility | discussion | OPPO | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903349 | Non-split Bearer Option on Reduction in User Data Interruption |
discussion revised to R2-1906640 |
CATT | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903444 | User plane handling for non-split bearer solution |
discussion revised to R2-1906289 |
Intel Corporation | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903445 | Control plane consideration on simultaneous connectivity |
discussion revised to R2-1906290, R2-1906291 |
Intel Corporation | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903559 | Reducing User Data Interruption during Handover in LTE |
discussion revised to R2-1906392 |
InterDigital | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903811 | Discussion on the RLF and HOF during non-split bearer handover |
discussion revision of R2-1900505 revised to R2-1905975 |
vivo | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903813 | Capability coordination between the source and the target. |
discussion revision of R2-1900507 revised to R2-1905977 |
vivo | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903814 | Consideration on the SRB of the non-split bearer handover |
discussion revision of R2-1900509 revised to R2-1905978 |
vivo | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903880 | Enhancements to Make-Before-Break | discussion | Ericsson | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | ||
R2-1903881 | User plane aspects of Make-Before-Break handover | discussion | Ericsson | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | ||
R2-1903894 | Single vs dual active protocol stacks for reduced handover interruption | discussion | Ericsson | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | ||
R2-1903895 | Data forwarding at reduced handover interruption | discussion | Ericsson | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | ||
R2-1903910 | Single and Dual Active eMBB Combined Solution |
discussion revised to R2-1906560 |
ETRI | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903911 | Data Forwarding in eMBB Handover |
discussion revision of R2-1900922 |
ETRI | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903916 | Considerations on data forwarding aspect. |
discussion revised to R2-1907645 |
Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903917 | Considerations on detaching aspect |
discussion revised to R2-1907646 |
Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903918 | Considerations on single and dual active protocol stacks. |
discussion revised to R2-1907647 |
Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903919 | Further consideration on reply LSs from RAN1 and RAN4 |
discussion revised to R2-1907648 |
Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903920 | Preamble gap design for one uplink path |
discussion revision of R2-1900970 revised to R2-1907649 |
Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903921 | single uplink feedback for dual downlink data transmission |
discussion revision of R2-1900968 revised to R2-1907650 |
Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1903922 | [DRAFT] LS on data forwarding procedure of non-split bearer solution |
LS out LS To: RAN3 |
Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1904255 | Report of [105#57][LTE/feMOB] UE and network side impacts of single/dual protocol stacks | discussion | ZTE Corporation | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1904256 | Discussion on the interruption time for single active protocol stack | discussion | ZTE Corporation, Sanechips | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1904282 | Simultaneous connectivity handover with single uplink operation |
discussion revision of R2-1900618 revised to R2-1907273 |
Nokia, Nokia Shanghai Bell | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1904365 | Discussion of ‘0ms’ interruption handover in context of E-UTRAN | discussion | CMCC | LTE_feMob-Core |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | ||
R2-1904625 | UE RF chain requirements to reduce LTE eMBB HO interruption time close to 0ms |
discussion revised to R2-1906380 |
Qualcomm Incorporated | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1904646 | LTE mobility enhancements for eMBB HO using dual active protocol stack |
discussion revision of R2-1900791 revised to R2-1906378 |
Qualcomm India Pvt Ltd | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1904678 | RRM, RLM and RLF handling during LTE enhanced MBB HO |
discussion revision of R2-1900789 revised to R2-1906381 |
Qualcomm Incorporated | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1904861 | PDCP impact for non-split dual active protocal stack solution | discussion | China Telecom | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1905025 | Comparison and Downselection of protocol stack options | discussion | LG Electronics France | LTE_feMob-Core |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | ||
R2-1905026 | Control of source connectivity for dual-connected mobility | discussion | LG Electronics France | LTE_feMob-Core |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | ||
R2-1905031 | UL data transmission path selection for dual-connected mobility | discussion | LG Electronics France | LTE_feMob-Core |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | ||
R2-1905100 | RLM Handling of Enhanced MBB HO |
discussion revised to R2-1908000 |
LG Electronics Inc. | LTE_feMob-Core | Rel-16 |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |
R2-1905104 | Why to select Single Stack solution for LTE feMOB |
discussion revised to R2-1907940 |
Samsung R&D Institute India |
R2-105 AI: 12.3.2.1 |
not treated | [WTS] [JSN] | |||
R2-1905321 | [Offline Discussion#800] Single PDCP entity and UL UP handling during HO | discussion | Mediatek Inc. |
R2-105 AI: 12.3.2.1 |
noted | [WTS] [JSN] |
41 documents (0.34402918815613 seconds)