Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-1903166 | System Information Design for V2X | discussion | CATT |
R2-105 AI: 11.4.6 |
not treated | [WTS] [JSN] | |||
R2-1903215 | Discussion on Inter-RAT Control for NR-V2X | discussion | OPPO | FS_NR_V2X |
R2-105 AI: 11.4.6 |
not treated | [WTS] [JSN] | ||
R2-1903463 | Discussion on cross RAT V2X sidelink resource allocation | discussion | ZTE Corporation, Sanechips | FS_NR_V2X | Rel-16 |
R2-105 AI: 11.4.6 |
noted | [WTS] [JSN] | |
R2-1903637 | Mode 3 SPS grant content and timing |
discussion revised to R2-1905857 |
vivo |
R2-105 AI: 11.4.6 |
not treated | [WTS] [JSN] | |||
R2-1904219 | MultiRAT CP Aspects in NR V2X | discussion | InterDigital | FS_NR_V2X | Rel-16 |
R2-105 AI: 11.4.6 |
not treated | [WTS] [JSN] | |
R2-1904455 | Cross RAT Resource allocation |
discussion revised to R2-1907150 |
Lenovo, Motorola Mobility | FS_NR_V2X | Rel-16 |
R2-105 AI: 11.4.6 |
not treated | [WTS] [JSN] | |
R2-1904497 | NR Uu control of LTE sidelink |
discussion revised to R2-1905178 |
Qualcomm Incorporated | FS_NR_V2X |
R2-105 AI: 11.4.6 |
revised | [WTS] [JSN] | ||
R2-1904701 | On cross-RAT scheduling | discussion | Ericsson | FS_NR_V2X |
R2-105 AI: 11.4.6 |
noted | [WTS] [JSN] | ||
R2-1904710 | Discussions on NR V2X in MR-DC Scenarios | discussion | Ericsson | FS_NR_V2X |
R2-105 AI: 11.4.6 |
not treated | [WTS] [JSN] | ||
R2-1904807 | Cross-RAT resource allocation/configuration in MR-DC |
discussion revision of R2-1901783 |
Samsung R&D Institute UK | Rel-16 |
R2-105 AI: 11.4.6 |
not treated | [WTS] [JSN] | ||
R2-1904878 | The enhancement of Uu to control inter-RAT V2X sidelink | discussion | Huawei, HiSilicon | Rel-16 |
R2-105 AI: 11.4.6 |
not treated | [WTS] [JSN] | ||
R2-1904885 | Cross-RAT resource scheduling/configuration | discussion | Intel Corporation | FS_NR_V2X |
R2-105 AI: 11.4.6 |
not treated | [WTS] [JSN] | ||
R2-1905056 | Reporting of Sidelink UE Information for cross-RAT resource allocation | discussion | LG Electronics Inc | FS_NR_V2X | Rel-16 |
R2-105 AI: 11.4.6 |
not treated | [WTS] [JSN] | |
R2-1905178 | NR Uu control of LTE sidelink |
discussion revision of R2-1904497 revised to R2-1907578 |
Qualcomm Incorporated | FS_NR_V2X |
R2-105 AI: 11.4.6 |
noted | [WTS] [JSN] |
14 documents (0.37037110328674 seconds)