Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R2-1903162 Uncertainty of L2 measurement result related to URLLC discussion

revised to R2-1905870

CATT FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1903255 Uplink Delay Measurements discussion Nokia, Nokia Shanghai Bell FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1903311 Text proposal on new use case of Active Antenna System optimisation for TS37.816 discussion Ericsson FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1903312 Discussion 0n Transmit Power definition for Downlink Control Channels for Antenna System optimisation discussion Ericsson FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

noted [WTS] [JSN]
R2-1903367 Summary of email discussion [105#43][NR/RD-CU] Use case of UE energy saving (MediaTek) discussion MediaTek Inc. FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

postponed [WTS] [JSN]
R2-1903470 Discussion for PRB usage of a cell discussion ZTE Corporation, Sanechips FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

withdrawn [WTS] [JSN]
R2-1903471 Data beamforming associated challenges in AAS discussion Ericsson FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1903472 PRB utilization aspects in a beam based system discussion Ericsson FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1903473 Draft LS on DRB-QoS information inclusion in E1 interface LS out

LS To: RAN3

Ericsson FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1903474 Discussion on the need of DRB-QoS information in PDCP layer discussion Ericsson FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1903475 Draft LS on transmit power measurement feasibility LS out

LS To: RAN4

revised to R2-1905230

Ericsson FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

revised [WTS] [JSN]
R2-1904077 On PDCP end user throughput measurements discussion Nanjing Ericsson Panda Com Ltd FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904241 Beam related gNB measurements discussion Nokia, Nokia Shanghai Bell FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

reserved [WTS] [JSN]
R2-1904242 Draft LS to RAN1 on beam related gNB measurements LS out

LS To: DUMMY

Nokia, Nokia Shanghai Bell FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

reserved [WTS] [JSN]
R2-1904296 Throughput measurement in NR MDT discussion

revision of R2-1900830

revised to R2-1906471

Qualcomm Incorporated FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904348 Beam Related L2 Measurements discussion CMCC FS_LTE_NR_data_collect R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904364 Discussion of delay measurement in NR MDT discussion CMCC FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904372 Summary of email discussion [105#44][NR/RD-CU] delay measurements in NR MDT discussion Qualcomm Incorporated FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

noted [WTS] [JSN]
R2-1904376 TP on latency measurement in NR MDT pCR Qualcomm Incorporated 37.816 0.1.0 FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904378 Reply LS on the user plane latency measurement LS out

LS To: SA5

Qualcomm Incorporated FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904395 Discussion on L2 Throughput Measurement discussion Samsung Electronics Polska Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904829 Further considerations on measurements defined in TS 28.552 discussion Huawei, HiSilicon FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904830 TP on measurements defined in TS 28.552 pCR Huawei, HiSilicon 37.816 0.1.0 FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

agreed [WTS] [JSN]
R2-1904831 Check on TS 36.314 for RDCU discussion Huawei, HiSilicon FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

noted [WTS] [JSN]
R2-1904832 Considerations on measurements for different network deployment options discussion

revision of R2-1901866

Huawei, HiSilicon FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904833 Draft LS on measurements for different network deployment options LS out

LS To: SA5

Huawei FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904834 Considerations on energy efficiency discussion Huawei, HiSilicon FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904835 Discussion on definitions of the latency measurement discussion

revision of R2-1901845

Huawei, HiSilicon FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904836 TP on definitions of the latency measurement pCR

revision of R2-1901846

Huawei, HiSilicon 37.816 0.1.0 FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904837 Discussion on requirements for the latency measurement discussion

revision of R2-1901847

Huawei, HiSilicon FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904838 Discussion on possible solutions for the latency measurement discussion

revision of R2-1901848

Huawei, HiSilicon FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

noted [WTS] [JSN]
R2-1904839 TP on possible solutions for the latency measurement pCR

revision of R2-1901849

Huawei, HiSilicon 37.816 0.1.0 FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904840 Draft reply LS on URLLC QoS moniting LS out

LS is reply to R2-1816237, R2-1900065

LS To: SA2

Huawei FS_5G_URLLC, FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904841 Draft reply LS on the latency measurement LS out

LS is reply to R2-1801755

LS To: SA5

Huawei NETSLICE-ADPM5G, FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904842 Discussion on PDCP end user throughput measurements discussion

revised to R2-1907702

Huawei, HiSilicon FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1904843 Draft reply LS on PDCP end user throughput measurements LS out

LS is reply to R2-1900100

LS To: SA5

Huawei 5G_SLICE_ePA, FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1905108 Discussion on PRB usage of a cell discussion

revised to R2-1906533

ZTE Corporation, Sanechips FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

not treated [WTS] [JSN]
R2-1905215 TP on latency measurement in NR MDT pCR

revised to R2-1905229

Qualcomm Incorporated 37.816 0.2.0 FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

revised [WTS] [JSN]
R2-1905229 TP on latency measurement in NR MDT pCR

revision of R2-1905215

Qualcomm Incorporated 37.816 0.2.0 FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

agreed [WTS] [JSN]
R2-1905230 LS on transmit power measurement feasibility LS out

LS To: RAN4, RAN1

revision of R2-1903475

RAN2 FS_LTE_NR_data_collect Rel-16 R2-105

AI: 11.12.3

approved [WTS] [JSN]

40 documents (0.36701488494873 seconds)