Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S4-180035 | Proposed Timeplan for FS_E2E_DELAY (v.0.0.1) |
Work Plan revised to S4-180236 |
Rapporteur (Intel) |
S4-97 AI: 11.11 |
revised | [WTS] [JSN] | |||
S4-180036 | Skeleton TR 26.910 (v0.0.1) | draft TR | Intel | FS_E2E_DELAY | Rel-15 |
S4-97 AI: 11.11 |
agreed | [WTS] [JSN] | |
S4-180037 | Proposed Introduction and Scope | pCR | Intel | 26.91 0.0.1 | FS_E2E_DELAY | Rel-15 |
S4-97 AI: 11.11 |
merged | [WTS] [JSN] |
S4-180038 | Background on RAN Delay Budget Reporting | pCR | Intel | 26.91 0.0.1 | FS_E2E_DELAY | Rel-15 |
S4-97 AI: 11.11 |
merged | [WTS] [JSN] |
S4-180039 | Proposed Evaluation Methodology |
pCR revised to S4-180237 |
Intel | 26.91 0.0.1 | FS_E2E_DELAY | Rel-15 |
S4-97 AI: 11.11 |
revised | [WTS] [JSN] |
S4-180237 | pCR 226.910: Proposed updates (merge of S4-180037, S4-180038, S4-180039) |
pCR revision of S4-180039 |
Intel | 26.91 0.0.1 | FS_E2E_DELAY | Rel-15 |
S4-97 AI: 11.11 |
agreed | [WTS] [JSN] |
6 documents (0.37376999855042 seconds)