Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S4-180040 | Evaluation of Dynamic PLR Allocation for Determination of SRVCC Handover Thresholds | pCR | Intel | 26.959 1.0.0 | FS_eVoLP | Rel-15 |
S4-97 AI: 11.1 |
merged | [WTS] [JSN] |
S4-180041 | Further Results on Evaluation of Dynamic PLR Allocation for Determination of SRVCC Handover Thresholds |
pCR revised to S4-180222 |
Intel | 26.959 1.0.0 | FS_eVoLP | Rel-15 |
S4-97 AI: 11.1 |
revised | [WTS] [JSN] |
S4-180042 | pCR 26.959: Proposed Conclusions |
pCR revised to S4-180256 |
Intel | 26.959 1.0.0 | FS_eVoLP | Rel-15 |
S4-97 AI: 11.1 |
revised | [WTS] [JSN] |
S4-180046 | Proposed Clarifications and Editorial Updates | pCR | Intel | 26.959 1.0.0 | FS_eVoLP | Rel-15 |
S4-97 AI: 11.1 |
agreed | [WTS] [JSN] |
S4-180047 | Proposed LS to RAN2 on eVoLP |
LS out LS To: RAN2 revised to S4-180219 |
Intel |
S4-97 AI: 11.1 |
revised | [WTS] [JSN] | |||
S4-180149 | Updated objective performance results for EVS | discussion | ORANGE |
S4-97 AI: 11.1 |
merged | [WTS] [JSN] | |||
S4-180150 | Subjective test results for EVS with application-layer redundancy | discussion | ORANGE |
S4-97 AI: 11.1 |
merged | [WTS] [JSN] | |||
S4-180153 | eVoLP: Time Plan, v0.0.5 |
Work Plan revised to S4-180253 |
Qualcomm Incorporated | FS_eVoLP |
S4-97 AI: 11.1 |
revised | [WTS] [JSN] | ||
S4-180155 | pCR TR 26.959 FS_eVoLP |
pCR revised to S4-180221 |
Qualcomm Incorporated | 26.959 1.0.0 | FS_eVoLP | Rel-15 |
S4-97 AI: 11.1 |
revised | [WTS] [JSN] |
S4-180157 | FS_eVoLP: On adaptation capability indication and Max. PLR recommendation with application layer redundancy |
discussion revised to S4-180235 |
Qualcomm Incorporated | FS_eVoLP |
S4-97 AI: 11.1 |
revised | [WTS] [JSN] | ||
S4-180221 | pCR 26.959: Evaluation of Dynamic PLR Allocation for Determination of SRVCC Handover Thresholds (merge of S4-180040 and S4-180155) |
pCR revision of S4-180155 |
Intel, Qualcomm Incorporated | 26.959 1.0.0 | FS_eVoLP | Rel-15 |
S4-97 AI: 11.1 |
agreed | [WTS] [JSN] |
S4-180222 | pCR 26.959: Further Results on Evaluation of Dynamic PLR Allocation for Determination of SRVCC Handover Thresholds (revision of S4-180041) |
pCR revision of S4-180041 revised to S4-180252 |
Intel | 26.959 1.0.0 | FS_eVoLP | Rel-15 |
S4-97 AI: 11.1 |
revised | [WTS] [JSN] |
S4-180252 | pCR 26.959: Further Results on Evaluation of Dynamic PLR Allocation for Determination of SRVCC Handover Thresholds (revision of S4-180222) |
pCR revision of S4-180222 |
Intel | 26.959 1.0.0 | FS_eVoLP | Rel-15 |
S4-97 AI: 11.1 |
agreed | [WTS] [JSN] |
S4-180256 | pCR 26.959: Proposed Conclusions |
pCR revision of S4-180042 |
Intel | 26.959 1.0.0 | FS_eVoLP | Rel-15 |
S4-97 AI: 11.1 |
agreed | [WTS] [JSN] |
14 documents (0.37611293792725 seconds)