Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R3-171439 | SCG bearer / SCG Split bearer Addition and bearer type change | discussion | LG Electronics Inc. | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171440 | Discussion on Secondary Node Change Procedure | discussion | LG Electronics Inc. | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171441 | Consideration on TNL address discovery of SgNB | discussion | LG Electronics Inc. |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |||
R3-171442 | UE capability coordination between Master node and Secondary node | discussion | LG Electronics Inc. |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |||
R3-171444 | Enhancements to the X2 UP | discussion | Nokia, Alcatel-Lucent Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
noted | [WTS] [JSN] | |
R3-171445 | UP enhancement for X2-based DC | other | Nokia, Alcatel-Lucent Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171468 | Changes needed to the LTE DC procedures to support EN-DC | discussion | Nokia, Alcatel-Lucent Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
noted | [WTS] [JSN] | |
R3-171469 | Description of EN-DC procedures | pCR | Nokia, Alcatel-Lucent Shanghai Bell | 37.34 0.0.2 | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] |
R3-171470 | Addition of a reference to the EN DC procedures |
draftCR revised to R3-171992 |
Nokia, Alcatel-Lucent Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
revised | [WTS] [JSN] | |
R3-171508 | Further Consideration on SN Change Procedure | discussion | ZTE Corporation | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171530 | Discussion on bear type change between SCG bear and SCG split bear | discussion | CATT |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |||
R3-171556 | Configuration of SCG SRB and Split/Duplicated SRB | discussion | ZTE Corporation | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171557 | Further Discussion on SCG Split Bearer Configuration | discussion | ZTE Corporation | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171589 | Stage 2 TP for bearer type change between SCG bear and SCG split bear | pCR | CATT | 37.34 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] |
R3-171591 | Stage 3 TP for bear type change between SCG bear and SCG split bear | other | CATT | Rel-14 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171592 | Discussion on SCG change procedure | discussion | CATT |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |||
R3-171594 | Stage 2 TP for SCG change procedure | pCR | CATT | 37.34 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] |
R3-171595 | Stage 3 TP for SCG change procedure | other | CATT |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |||
R3-171613 | Discussion on the open issue for option 3 | discussion | CATT |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |||
R3-171614 | Stage 2 TP on the open issues for option 3 | discussion | CATT |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |||
R3-171615 | Stage 3 TP on the open issues for option 3 | other | CATT |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |||
R3-171641 | Discussion on the Open issues in option 3/3a/3x | discussion | Samsung | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171653 | Consideration on the counter check procedure in LTE-NR tight interworking | discussion | ZTE Corporation | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171662 | Consideration on SN RRC message indirect forward | discussion | ZTE Corporation | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171665 | User data forwarding for dual connectivity | discussion | ZTE Corporation | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171668 | TP for User data forwarding for Dual connectivity | discussion | ZTE Corporation | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171672 | Text Proposa of Split SRB Configuration for 36.423 | other | Samsung | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171673 | Text Proposa of HRL for 36.423 | other | Samsung | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171674 | Text Proposal of X2 Setup for 36.423 | other | Samsung | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171701 | Introduction of option 3 – Dual Connectivity with NR in E-UTRAN |
CR revision of R3-171154 |
Ericsson | 36.423 14.2.0 CR#10271 catB | NR_newRAT | Rel-15 |
R3-96 AI: 10.9.1 |
noted | [WTS] [JSN] |
R3-171719 | 2 Work for Option 3 – architectural topics | discussion | Ericsson | NR_newRAT | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171720 | Further Stage 2 topics for Option 3 | discussion | Ericsson | NR_newRAT | Rel-15 |
R3-96 AI: 10.9.1 |
noted | [WTS] [JSN] | |
R3-171721 | Further details on specifying stage 2 for option 3 | discussion | Ericsson | NR_newRAT | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171776 | UE capability coordination for EN-DC | discussion | Intel Corporation | 5GS_Ph1 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171777 | In supporting unified split bearer option for EN-DC | discussion | Intel Corporation | 5GS_Ph1 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | ||
R3-171827 | Introduction of option 3 – Dual Connectivity with NR in E-UTRAN – RAN3 parts | draftCR | Ericsson | NR_newRAT | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171839 | On inter SN change procedure in EN-DC | discussion | NTT DOCOMO, INC. | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171866 | General aspects and principles for Option 3/3a/3x | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
noted | [WTS] [JSN] | |
R3-171867 | Working Document for stage-3 of Option 3/3a/3x |
CR revised to R3-171993 |
Huawei, LG Electronics Inc., CATT, ZTE | 36.423 14.2.0 CR#1034 catB | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
revised | [WTS] [JSN] |
R3-171868 | Some updates to stage-3 for Option 3/3a/3x | other | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
noted | [WTS] [JSN] | |
R3-171869 | Detailed procedure of Secondary Node change | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171870 | TP for Secondary node change procedure | pCR | Huawei | 37.34 0.0.2 | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] |
R3-171871 | Response LS on RAN2 LTE-NR interworking procedure related conclusions |
LS out LS is reply to R3-171419 LS To: RAN2 revised to R3-171994 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
revised | [WTS] [JSN] | |
R3-171872 | Considerations on bearer types | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171873 | SCG SRB establishment procedure | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171874 | TP on SCG SRB establishment procedure | other | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171875 | MCG split SRB establishment procedure | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171876 | TP on MCG split SRB establishment procedure | other | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171877 | S-KeNB related issues for EN-DC | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171878 | RRC information exchange for EN-DC | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171879 | TP on RRC information exchange for EN-DC | other | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171880 | Consideration on counter check procedure | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171881 | DL Flow control for EN-DC | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
noted | [WTS] [JSN] | |
R3-171882 | Introduction of flow control for EN-DC | other | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171884 | Flow control to support RLC UM | discussion | Huawei, , Deutsche Telekom | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171885 | TP on support of flow control for RLC UM | other | Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
available | [WTS] [JSN] | |
R3-171992 | Addition of a reference to the EN DC procedures |
draftCR revision of R3-171470 revised to R3-172068 |
Nokia, Alcatel-Lucent Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
endorsed | [WTS] [JSN] | |
R3-171993 | stage-3 of Option 3/3a/3x |
CR revision of R3-171867 |
Huawei, LG Electronics Inc., CATT, ZTE | 36.423 14.2.0 CR#10341 catB | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
endorsed | [WTS] [JSN] |
R3-171994 | Response LS on RAN2 LTE-NR interworking procedure related conclusions |
LS out LS is reply to R3-171419 LS To: RAN2 revision of R3-171871 revised to R3-172013 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
revised | [WTS] [JSN] | |
R3-172013 | Response LS on RAN2 LTE-NR interworking procedure related conclusions |
LS out LS is reply to R3-171419 LS To: RAN2 revision of R3-171994 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-96 AI: 10.9.1 |
approved | [WTS] [JSN] |
60 documents (0.3726921081543 seconds)