Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R3-171439 SCG bearer / SCG Split bearer Addition and bearer type change discussion LG Electronics Inc. Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171440 Discussion on Secondary Node Change Procedure discussion LG Electronics Inc. Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171441 Consideration on TNL address discovery of SgNB discussion LG Electronics Inc. R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171442 UE capability coordination between Master node and Secondary node discussion LG Electronics Inc. R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171444 Enhancements to the X2 UP discussion Nokia, Alcatel-Lucent Shanghai Bell NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

noted [WTS] [JSN]
R3-171445 UP enhancement for X2-based DC other Nokia, Alcatel-Lucent Shanghai Bell NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171468 Changes needed to the LTE DC procedures to support EN-DC discussion Nokia, Alcatel-Lucent Shanghai Bell NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

noted [WTS] [JSN]
R3-171469 Description of EN-DC procedures pCR Nokia, Alcatel-Lucent Shanghai Bell 37.34 0.0.2 NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171470 Addition of a reference to the EN DC procedures draftCR

revised to R3-171992

Nokia, Alcatel-Lucent Shanghai Bell NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

revised [WTS] [JSN]
R3-171508 Further Consideration on SN Change Procedure discussion ZTE Corporation Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171530 Discussion on bear type change between SCG bear and SCG split bear discussion CATT R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171556 Configuration of SCG SRB and Split/Duplicated SRB discussion ZTE Corporation Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171557 Further Discussion on SCG Split Bearer Configuration discussion ZTE Corporation Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171589 Stage 2 TP for bearer type change between SCG bear and SCG split bear pCR CATT 37.34 0.1.0 NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171591 Stage 3 TP for bear type change between SCG bear and SCG split bear other CATT Rel-14 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171592 Discussion on SCG change procedure discussion CATT R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171594 Stage 2 TP for SCG change procedure pCR CATT 37.34 0.1.0 NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171595 Stage 3 TP for SCG change procedure other CATT R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171613 Discussion on the open issue for option 3 discussion CATT R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171614 Stage 2 TP on the open issues for option 3 discussion CATT R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171615 Stage 3 TP on the open issues for option 3 other CATT R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171641 Discussion on the Open issues in option 3/3a/3x discussion Samsung Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171653 Consideration on the counter check procedure in LTE-NR tight interworking discussion ZTE Corporation Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171662 Consideration on SN RRC message indirect forward discussion ZTE Corporation Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171665 User data forwarding for dual connectivity discussion ZTE Corporation Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171668 TP for User data forwarding for Dual connectivity discussion ZTE Corporation Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171672 Text Proposa of Split SRB Configuration for 36.423 other Samsung Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171673 Text Proposa of HRL for 36.423 other Samsung Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171674 Text Proposal of X2 Setup for 36.423 other Samsung Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171701 Introduction of option 3 – Dual Connectivity with NR in E-UTRAN CR

revision of R3-171154

Ericsson 36.423 14.2.0 CR#10271 catB NR_newRAT Rel-15 R3-96

AI: 10.9.1

noted [WTS] [JSN]
R3-171719 2 Work for Option 3 – architectural topics discussion Ericsson NR_newRAT Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171720 Further Stage 2 topics for Option 3 discussion Ericsson NR_newRAT Rel-15 R3-96

AI: 10.9.1

noted [WTS] [JSN]
R3-171721 Further details on specifying stage 2 for option 3 discussion Ericsson NR_newRAT Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171776 UE capability coordination for EN-DC discussion Intel Corporation 5GS_Ph1 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171777 In supporting unified split bearer option for EN-DC discussion Intel Corporation 5GS_Ph1 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171827 Introduction of option 3 – Dual Connectivity with NR in E-UTRAN – RAN3 parts draftCR Ericsson NR_newRAT Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171839 On inter SN change procedure in EN-DC discussion NTT DOCOMO, INC. NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171866 General aspects and principles for Option 3/3a/3x discussion Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

noted [WTS] [JSN]
R3-171867 Working Document for stage-3 of Option 3/3a/3x CR

revised to R3-171993

Huawei, LG Electronics Inc., CATT, ZTE 36.423 14.2.0 CR#1034 catB NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

revised [WTS] [JSN]
R3-171868 Some updates to stage-3 for Option 3/3a/3x other Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

noted [WTS] [JSN]
R3-171869 Detailed procedure of Secondary Node change discussion Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171870 TP for Secondary node change procedure pCR Huawei 37.34 0.0.2 NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171871 Response LS on RAN2 LTE-NR interworking procedure related conclusions LS out

LS is reply to R3-171419

LS To: RAN2

revised to R3-171994

Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

revised [WTS] [JSN]
R3-171872 Considerations on bearer types discussion Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171873 SCG SRB establishment procedure discussion Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171874 TP on SCG SRB establishment procedure other Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171875 MCG split SRB establishment procedure discussion Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171876 TP on MCG split SRB establishment procedure other Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171877 S-KeNB related issues for EN-DC discussion Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171878 RRC information exchange for EN-DC discussion Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171879 TP on RRC information exchange for EN-DC other Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171880 Consideration on counter check procedure discussion Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171881 DL Flow control for EN-DC discussion Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

noted [WTS] [JSN]
R3-171882 Introduction of flow control for EN-DC other Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171884 Flow control to support RLC UM discussion Huawei, , Deutsche Telekom NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171885 TP on support of flow control for RLC UM other Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

available [WTS] [JSN]
R3-171992 Addition of a reference to the EN DC procedures draftCR

revision of R3-171470

revised to R3-172068

Nokia, Alcatel-Lucent Shanghai Bell NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

endorsed [WTS] [JSN]
R3-171993 stage-3 of Option 3/3a/3x CR

revision of R3-171867

Huawei, LG Electronics Inc., CATT, ZTE 36.423 14.2.0 CR#10341 catB NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

endorsed [WTS] [JSN]
R3-171994 Response LS on RAN2 LTE-NR interworking procedure related conclusions LS out

LS is reply to R3-171419

LS To: RAN2

revision of R3-171871

revised to R3-172013

Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

revised [WTS] [JSN]
R3-172013 Response LS on RAN2 LTE-NR interworking procedure related conclusions LS out

LS is reply to R3-171419

LS To: RAN2

revision of R3-171994

Huawei NR_newRAT-Core Rel-15 R3-96

AI: 10.9.1

approved [WTS] [JSN]

60 documents (0.37498807907104 seconds)