Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R3-162096 | CU-DU split:refinement on justification of option 2 | pCR | NTT DOCOMO INC. | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
withdrawn | [WTS] [JSN] | |
R3-162098 | CU-DU split:Justification of Option 6 and 7 |
pCR revised to R3-162542 |
NTT DOCOMO INC. | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
revised | [WTS] [JSN] | |
R3-162099 | CU-DU split:Justification of Option 6 and 7 | pCR | NTT DOCOMO INC. | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
withdrawn | [WTS] [JSN] | |
R3-162101 | CU-DU split:Justification of Option 2 and 3 and HL/LL split |
pCR revised to R3-162531 |
NTT DOCOMO INC. | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
revised | [WTS] [JSN] | |
R3-162231 | RAN functional split: MAC-PHY description and benefits | discussion | Intel Corporation | FS_NR_newRAT | Rel-14 |
R3-93 AI: 10.6.1.1 |
merged | [WTS] [JSN] | |
R3-162232 | RAN functional split: intra MAC split description and benefits | pCR | Intel Corporation | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
merged | [WTS] [JSN] | |
R3-162330 | Further considerations on intra-RLC split |
pCR revised to R3-162534 |
Huawei | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
revised | [WTS] [JSN] | |
R3-162343 | Consideration about the CU-DU function split between intra-PHY | discussion | ZTE Corporation | FS_NR_newRAT | Rel-14 |
R3-93 AI: 10.6.1.1 |
noted | [WTS] [JSN] | |
R3-162374 | Benefit and justification of Option3-2 | discussion | CMCC | FS_NR_newRAT | Rel-14 |
R3-93 AI: 10.6.1.1 |
noted | [WTS] [JSN] | |
R3-162375 | TP for Benefit and justification of Option3-2. |
pCR revised to R3-162535 |
CMCC | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
revised | [WTS] [JSN] | |
R3-162376 | Benefit of asymmetrical split realization of option 7 |
pCR revised to R3-162544 |
CMCC | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
revised | [WTS] [JSN] | |
R3-162421 | RAN architecture scenarios requiring flexible design |
pCR revised to R3-162533 |
Ericsson | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
revised | [WTS] [JSN] | |
R3-162422 | Clarifications on fronthaul bitrate requirements |
pCR revised to R3-162546 |
Ericsson | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
revised | [WTS] [JSN] | |
R3-162423 | Analysis of Split Architecture Option 8 |
pCR revised to R3-162545 |
Ericsson | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
revised | [WTS] [JSN] | |
R3-162471 | Split Option 1 benefits |
pCR revised to R3-162530 |
Interdigital Asia LLC | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
revised | [WTS] [JSN] | |
R3-162472 | Description of intra-MAC functional split |
pCR revised to R3-162541 |
Fujitsu | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
revised | [WTS] [JSN] | |
R3-162489 | Response to tdocs in Agenda 10.6.1.1 | response | NTT DOCOMO INC. | FS_NR_newRAT | Rel-14 |
R3-93 AI: 10.6.1.1 |
noted | [WTS] [JSN] | |
R3-162516 | Correction of Benefit and justification of Option3-2 | pCR | Ericsson | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
available | [WTS] [JSN] | |
R3-162530 | Split Option 1 benefits |
pCR revision of R3-162471 revised to R3-162630 |
Interdigital Asia LLC | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
revised | [WTS] [JSN] | |
R3-162531 | CU-DU split:Justification of Option 2 and 3 and HL/LL split |
pCR revision of R3-162101 |
NTT DOCOMO INC. | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
agreed | [WTS] [JSN] | |
R3-162533 | RAN architecture scenarios requiring flexible design |
pCR revision of R3-162421 |
Ericsson | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
agreed | [WTS] [JSN] | |
R3-162534 | Further considerations on intra-RLC split |
pCR revision of R3-162330 |
Huawei | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
agreed | [WTS] [JSN] | |
R3-162535 | TP for Benefit and justification of Option3-2. |
pCR revision of R3-162375 |
CMCC | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
agreed | [WTS] [JSN] | |
R3-162541 | Description of intra-MAC functional split |
pCR revision of R3-162472 |
Fujitsu | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
agreed | [WTS] [JSN] | |
R3-162542 | CU-DU split:Justification of Option 6 and 7 |
pCR revision of R3-162098 |
NTT DOCOMO INC. | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
agreed | [WTS] [JSN] | |
R3-162544 | Benefit of asymmetrical split realization of option 7 |
pCR revision of R3-162376 |
CMCC | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
agreed | [WTS] [JSN] | |
R3-162545 | Analysis of Split Architecture Option 8 |
pCR revision of R3-162423 |
Ericsson | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
agreed | [WTS] [JSN] | |
R3-162546 | Clarifications on fronthaul bitrate requirements |
pCR revision of R3-162422 |
Ericsson | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
agreed | [WTS] [JSN] | |
R3-162630 | Split Option 1 benefits |
pCR revision of R3-162530 |
Interdigital Asia LLC | 38.801 0.4.0 | FS_NR_newRAT |
R3-93 AI: 10.6.1.1 |
agreed | [WTS] [JSN] |
29 documents (0.32978582382202 seconds)