Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R3-160622 | Fronthaul and RAN functional split aspects of the next generation radio access network | discussion | Intel Corporation | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160623 | NFV aspects of the next generation radio access network | discussion | Intel Corporation | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160670 | Flexible Split of Next Generation RAN Architecture Functions |
discussion revised to R3-160989 |
AT&T | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
revised | [WTS] [JSN] | |
| R3-160679 | Function split between central and remote node |
discussion revised to R3-160990 |
Samsung | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
revised | [WTS] [JSN] | |
| R3-160680 | 5G RAN Network Functions Virtualization | discussion | Samsung | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160741 | Proposal for Fronthaul Split Study | discussion | Nokia, Alcatel-Lucent Shanghai Bell | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160749 | Consideration on fronthauling | discussion | LG Electronics Inc. | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160754 | Fronthauling: Motivations and Constraints |
discussion revised to R3-160986 |
Mitsubishi Electric RCE | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
revised | [WTS] [JSN] | |
| R3-160766 | Motivation of Functionality Splitting in RAN architecture | discussion | NEC | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160767 | Options of Functionality Splitting in RAN logical architecture | discussion | NEC, KDDI | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160775 | Consideration on RAN architecture in 5G NR | discussion | CATT | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160800 | Clarification on the deployment of CU and DU | discussion | ZTE Corporation | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
available | [WTS] [JSN] | |
| R3-160804 | The function split between CU and DU | discussion | ZTE Corporation | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160805 | The capacity requirement for the interface between CU and DU | discussion | ZTE Corporation | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160808 | Discussion on Next generation fronthaul interface | discussion | CMCC | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160809 | Considerations on Next Generation RAN Architecture | discussion | CMCC | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160824 | Architecture of Distributed RAN | other | Qualcomm Incorporated | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160825 | Intra-RAN Coordination | other | Qualcomm Incorporated | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160835 | Fronthauling with New Radio Technology | discussion | Interdigital Asia LLC | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160843 | RAN internal architecture | discussion | Ericsson | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160894 | Consideration on RAN logical Architecture | discussion | Huawei | FS_NR_newRAT | Rel-14 |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160986 | Fronthauling: Motivations and Constraints |
pCR revision of R3-160754 revised to R3-161012 |
Mitsubishi Electric RCE | 38.801 0.0.1 | FS_NR_newRAT |
R3-91 AI: 10.5 |
revised | [WTS] [JSN] | |
| R3-160989 | Flexible Split of Next Generation RAN Architecture Functions |
pCR revision of R3-160670 |
AT&T | 38.801 0.0.1 | FS_NR_newRAT |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] | |
| R3-160990 | Function split between central and remote node |
pCR revision of R3-160679 revised to R3-161013 |
Samsung | 38.801 0.0.1 | FS_NR_newRAT |
R3-91 AI: 10.5 |
revised | [WTS] [JSN] | |
| R3-161012 | Fronthauling: Motivations and Constraints |
pCR revision of R3-160986 |
Mitsubishi Electric RCE | 38.801 0.0.1 | FS_NR_newRAT |
R3-91 AI: 10.5 |
available | [WTS] [JSN] | |
| R3-161013 | Function split between central and remote node |
pCR revision of R3-160990 |
Samsung | 38.801 0.0.1 | FS_NR_newRAT |
R3-91 AI: 10.5 |
noted | [WTS] [JSN] |
26 documents (0.44073891639709 seconds)