Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-1809823 | RRC processing delay requirement for NR |
discussion revision of R2-1808306 revised to R2-1812575 |
Samsung Electronics GmbH |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] | |||
R2-1809824 | CR on RRC processing delay requirement |
draftCR revised to R2-1812576 |
Samsung Electronics GmbH | NR_newRAT-Core | Rel-15 |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] | |
R2-1810104 | Mobility history information in NR | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] | |
R2-1810105 | RRC processing delay for RRC Resume | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] | |
R2-1810108 | Introduction of processing delay requirements for RCC Resume procedure | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] | |
R2-1810166 | Correction to handle RLF in CA duplication | draftCR | MediaTek Inc. | NR_newRAT-Core | Rel-15 |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] | |
R2-1810241 | RACH resource configuration for beam failure recovery |
discussion revision of R2-1807900 |
Lenovo, Motorola Mobility | NR_newRAT-Core | Rel-15 |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] | |
R2-1810444 | Discussion on processing Delay Requirements for RRC Procedures in NR |
discussion revision of R2-1808260 revised to R2-1812458 |
Huawei, Hisilicon | NR_newRAT-Core | Rel-15 |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] | |
R2-1810445 | CR on 38.331 to capture processing delay requirements |
draftCR revised to R2-1812459 |
Huawei, Hisilicon | NR_newRAT-Core | Rel-15 |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] | |
R2-1810481 | The Necessity of T312 in NR |
discussion revision of R2-1808486 |
Samsung R&D Institute UK, Qualcomm Incorporated |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] | |||
R2-1810508 | UE RRC Processing Delays in NR for EN-DC and SA | discussion | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] | |
R2-1810555 | Discussion on CSI-RS configuration over multiple BWPs |
discussion revised to R2-1811797 |
Samsung |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] | |||
R2-1810569 | NR Processing delay requirements for RRC procedures in EN-DC | CR | Qualcomm Incorporated | 38.331 15.2.1 CR#142 catF | NR_newRAT-Core | Rel-15 |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] |
R2-1810611 | Remaining FFS List for RLF |
discussion revised to R2-1812578 |
LG Electronics Inc. | NR_newRAT-Core | Rel-15 |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] | |
R2-1810612 | Remaining FFS List for RLF |
CR revised to R2-1812579 |
LG Electronics Inc. | 38.331 15.2.0 CR#144 catB | NR_newRAT-Core | Rel-15 |
R2-ah-18791 AI: 10.4.1.3.9 |
not treated | [WTS] [JSN] |
15 documents (0.37371492385864 seconds)