Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-1712219 | Corrections to TP in RRC(Connection)Reconfiguration | discussion | OPPO | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
noted | [WTS] [JSN] | |
R2-1712666 | Delta/Full configuration for bearer type change and SN change | discussion | Intel Corporation | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
noted | [WTS] [JSN] | |
R2-1712667 | RRC signaling for PDCP data recovery | discussion | Intel Corporation | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
noted | [WTS] [JSN] | |
R2-1712689 | Addition and Release of SCG configuration over LTE RRC | discussion | Intel Corporation | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
noted | [WTS] [JSN] | |
R2-1713341 | Email disc 17: TP for NR RRC Reconfiguration | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
noted | [WTS] [JSN] | |
R2-1713342 | Email disc 17: TP for LTE RRCConnectionReconfiguration | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
noted | [WTS] [JSN] | |
R2-1713343 | Some remaining terminology issues | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
noted | [WTS] [JSN] | |
R2-1713344 | RRC Reconfiguration of NR-NR DC and NE-DC | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
noted | [WTS] [JSN] | |
R2-1713388 | LTE re-establishment when using NR PDCP (TP to 36.331 and 38.331) | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
noted | [WTS] [JSN] | |
R2-1713390 | Full configuration in EN-DC | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
noted | [WTS] [JSN] | |
R2-1713530 | Capturing network restrictions and bearer type changes in Stage-3 | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
noted | [WTS] [JSN] | |
R2-1714207 | Full configuration in EN-DC |
discussion revised to R2-1714228 |
Ericsson | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
revised | [WTS] [JSN] | |
R2-1714208 | OFFLINE#22 LTE re-establishment and resume while using NR PDCP | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
noted | [WTS] [JSN] | |
R2-1714228 | Full configuration in EN-DC |
discussion revision of R2-1714207 |
Ericsson | NR_newRAT-Core | Rel-15 |
R2-100 AI: 10.4.1.3.1 |
noted | [WTS] [JSN] |
14 documents (0.39528298377991 seconds)