Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-1806828 | Initial Architecture Considerations for NE-DC | discussion | InterDigital | NR_newRAT-Core | Rel-15 |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | |
R2-1807078 | NR RRC design principles for NE-DC |
discussion revised to R2-1809948 |
Ericsson | NR_newRAT-Core | Rel-15 |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | |
R2-1807079 | MCG failure handling in case of NE-DC |
discussion revised to R2-1809949 |
Ericsson | NR_newRAT-Core | Rel-15 |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | |
R2-1807080 | SCG failure handling in case of NE-DC |
discussion revised to R2-1809950 |
Ericsson | NR_newRAT-Core | Rel-15 |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | |
R2-1807348 | Architectural discussions on NE-DC |
discussion revision of R2-1805046 |
Intel Corporation | NR_newRAT-Core | Rel-15 |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | |
R2-1807551 | Bearer handling in NR-E-UTRA Dual Connectivity |
discussion revision of R2-1804703 revised to R2-1809905 |
Samsung R&D Institute India | Rel-15 |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | ||
R2-1807625 | Remaining issues on NE-DC |
discussion revision of R2-1804607 |
vivo | NR_newRAT-Core | Rel-15 |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | |
R2-1807736 | Measurement and gap configuration framework in NE-DC |
discussion revision of R2-1804398 revised to R2-1809637 |
ZTE Corporation | NR_newRAT-Core |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | ||
R2-1807838 | Considerations on Stage 2 aspect for NE-DC |
discussion revision of R2-1805645 revised to R2-1809636 |
ZTE Corporation | NR_newRAT-Core | Rel-15 |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | |
R2-1808020 | RRC Resume for NE-DC and NGEN-DC | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | |
R2-1808072 | Security support for NE-DC | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | |
R2-1808073 | DRAFT LS on Security aspect of NE-DC |
LS out LS To: SA3 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | |
R2-1808299 | RRC design consideration for NE-DC |
discussion revision of R2-1806125 revised to R2-1809827 |
Samsung Electronics GmbH |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | |||
R2-1808309 | RRM design consideration for NE-DC |
discussion revised to R2-1809830 |
Samsung Electronics GmbH |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | |||
R2-1808593 | RRC Re-establishment Enhancement in NE-DC |
discussion revised to R2-1810723 |
LG Electronics Inc. | NR_newRAT-Core | Rel-15 |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] | |
R2-1808686 | Consideration on Measurement Gap in NE-DC |
discussion revised to R2-1810269 |
Nokia, Nokia Shanghai Bell |
R2-102 AI: 10.2.7 |
available | [WTS] [JSN] |
16 documents (0.39120817184448 seconds)