Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-1704082 | SN addition procedure |
discussion revision of R2-1702576 |
Guangdong OPPO Mobile Telecom. | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | ||
R2-1704083 | SN management in suspend state | discussion | Guangdong OPPO Mobile Telecom. | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | ||
R2-1704138 | Summary of email discussion [97bis#10][NR] MN/SN measurement coordination | report | NTT DOCOMO, INC. (Email discussion rapporteur) | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
noted | [WTS] [JSN] | |
R2-1704217 | Consideration on inter-RAT handover in case of IWK | discussion | CATT | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704283 | Secondary node change procedure for 0ms interruption time in LTE-NR tight interworking | discussion | TCL Communication Ltd. | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704344 | LTE-NR DC measurement framework and coordination aspects | discussion | Nokia, Alcatel-Lucent Shanghai Bell | NR_newRAT | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704346 | Further considerations for SCG SRB and RLF handling | discussion | Nokia, Alcatel-Lucent Shanghai Bell | NR_newRAT | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704347 | Scenarios for MN and SN coordination in LTE NR DC | discussion | Nokia, Alcatel-Lucent Shanghai Bell | NR_newRAT | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704349 | Comparison of RRC reconfiguration latency for SCG SRB with MCG routed SRB | discussion | Nokia, Alcatel-Lucent Shanghai Bell | NR_newRAT | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704419 | RRM measurement framework for EN-DC | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704420 | Addition, modification and release of DRBs in EN-DC | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704650 | Consideration on the intra-MN handover without SCG change involved |
discussion revised to R2-1706655 |
ZTE Corporation | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704651 | Consideration on the counter check procedure in LTE/NR tight interworking |
discussion revised to R2-1706656 |
ZTE Corporation | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704652 | Consideration on the capability restriction update procedure in LTE/NR tight interworking |
discussion revised to R2-1706659 |
ZTE Corporation | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704654 | Discussion on data forwarding in LTE/NR tight interworking |
discussion revised to R2-1706660 |
ZTE Corporation | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704655 | Consideration on the measurement coordination in LTE/NR tight interworking | discussion | ZTE Corporation | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704656 | Consideration on the LTE/NR tight interworking with NGC |
discussion revised to R2-1706650 |
ZTE Corporation | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704657 | Consideration on the SN RRC message forwarding |
discussion revised to R2-1706651 |
ZTE Corporation | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704658 | Consideration on the stage 2 signalling procedure for LTE/NR tight interworking | discussion | ZTE Corporation | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704659 | Initial Stage2 TP for EN-DC procedures | discussion | ZTE Corporation | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704702 | RRM measurement configuration in case of EN-DC procedures | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1704796 | EN-DC procedures and network handling | discussion | Intel Corporation | NR_newRAT-Core |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | ||
R2-1704799 | Inter-Node coordination signalling in EN-DC | discussion | Intel Corporation | NR_newRAT-Core |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | ||
R2-1704813 | Network and UE handling of merging split bearer types | discussion | Intel Corporation | NR_newRAT-Core |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | ||
R2-1704814 | UE and network handling for NR measurement in EN DC | discussion | Intel Corporation | NR_newRAT-Core |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | ||
R2-1704829 | Intra SN mobility and MN involvement | discussion | Sony |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |||
R2-1704951 | Consideration on inter-RAT measurement in EN-DC | discussion | China Telecom Corporation Ltd. | NR_newRAT-Core |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | ||
R2-1705068 | Measurement Configuration for NR SCG Addition | discussion | Samsung Electronics Co., Ltd |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |||
R2-1705069 | Remaining Issues on SCG Release Procedure | discussion | Samsung Electronics Co., Ltd |
R2-98 AI: 10.2.3 |
noted | [WTS] [JSN] | |||
R2-1705128 | Transmission of SN RRC messages | discussion | HTC Corporation | NR_newRAT-Core |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | ||
R2-1705133 | Measurement Configuration coordination between MN and SN | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705134 | General considerations on LTE-NR DC measurement | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705135 | Measurement Events for LTE NR-DC | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705136 | Inter-Node message design for LTE-NR DC | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705137 | Consideration on SN change for LTE-NR DC option 4 and 7 | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705138 | Intra SN change with or without MN involvement | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705139 | Detailed procedure of Secondary Node change | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705140 | TP for Secondary Node Change | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705141 | S-KeNB related issues for LTE-NR interworking | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705142 | Direct SCG (Split) Bearer Setup in EN DC | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
noted | [WTS] [JSN] | |
R2-1705143 | DL Flow control for EN-DC | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705222 | [DRAFT] LS on UE measurement capabilities across LTE and NR |
LS out LS To: RAN4 |
NTT DOCOMO, INC. | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705223 | Measurement report triggering events required for EN-DC | discussion | LG Electronics Inc. |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |||
R2-1705267 | Measurement coordination in LTE-NR DC | discussion | NEC | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705277 | Measurement and reporting configuration coordination in EN-DC | discussion | Guangdong OPPO Mobile Telecom. | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | ||
R2-1705345 | EN DC inter-node interaction, overview and RAN2/ RAN3 scope | discussion | Samsung Telecommunications | Rel-15 |
R2-98 AI: 10.2.3 |
noted | [WTS] [JSN] | ||
R2-1705415 | Initial Stage2 TP for MN/SN procedures for MR-DC with 5GC | discussion | ZTE Corporation | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | ||
R2-1705558 | SN change for tight interworking between LTE and NR | discussion | LG Electronics Inc. | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705619 | Measurement capability change in LTE-NR DC | discussion | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705630 | Clarification of inter/intra-frequency mobility in EN-DC | discussion | NTT DOCOMO, INC. | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705643 | SN addition/release procedure with split SRB | discussion | LG Electronics | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705746 | Inter-node measurements in EN-DC | discussion | Qualcomm |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |||
R2-1705790 | Measurement report in LTE-NR DC | discussion | CMCC | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705791 | MN handover to the serving SN frequency | discussion | CMCC | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | |
R2-1705804 | Multi-Connectivity operations and text proposal | discussion | HTC Corporation | NR_newRAT-Core |
R2-98 AI: 10.2.3 |
available | [WTS] [JSN] | ||
R2-1706035 | [DRAFT] LS on UE measurement capabilities across LTE and NR |
LS out LS To: RAN4 revised to R2-1706140 |
NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
revised | [WTS] [JSN] | |
R2-1706139 | Offline discussion: 40 MN/SN measurements coordination | discussion | Nokia |
R2-98 AI: 10.2.3 |
noted | [WTS] [JSN] | |||
R2-1706140 | LS on UE measurement capabilities across LTE and NR |
LS out LS To: RAN4 LS reply in R4-1706530, R4-1706743, R4-1706792, R4-1706905, R4-1707716, R4-1708014, R4-1708282 revision of R2-1706035 |
RAN2 | NR_newRAT-Core | Rel-15 |
R2-98 AI: 10.2.3 |
approved | [WTS] [JSN] |
58 documents (0.38231992721558 seconds)