Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-1702576 | Discussion on SgNB Addition Procedure |
discussion revised to R2-1704082 |
Guangdong OPPO Mobile Telecom. |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |||
R2-1702624 | Management for secondary node change | discussion | Fiberhome Technologies Group |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |||
R2-1702693 | Measurement framework for NSA operation | discussion | Nokia, Alcatel-Lucent Shanghai Bell | NR_newRAT | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1702700 | Secondary node addition and modification: Remaining issues | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1702701 | Secondary node change procedure - Remaining issues | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1702702 | Draft LS to RAN3 on Secondary node change procedure | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1702704 | Suspend/resume in LTE-NR interworking scenarios | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1702776 | Further considerations for SCG and SN node change | discussion | Nokia, Alcatel-Lucent Shanghai Bell | NR_newRAT | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1702834 | Consideration on the measurement coordination in LTE/NR tight interworking | discussion | ZTE, ZTE Microelectronics | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1703019 | Measurement Configuration for NR Cell Addition | discussion | Samsung Electronics Co., Ltd |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |||
R2-1703092 | Control plane procedures for LTE and NR interworking | discussion | CATT | Rel-15 |
R2-97 AI: 10.2.2.1 |
noted | [WTS] [JSN] | ||
R2-1703135 | SN Change Procedure in EN-DC | discussion | ITRI | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | ||
R2-1703276 | PSCell change and SCell management in SCG | discussion | Sony | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1703317 | SN addition procedure | discussion | LG Electronics France | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1703401 | RRM measurement managed by SN in LTE-NR DC | discussion | NEC | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1703428 | EN-DC procedures and network handling | discussion | Intel Corporation | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1703444 | Inter-Node coordination signalling in EN-DC | discussion | Intel Corporation | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1703598 | Measurement report required for LTE-NR interworking | discussion | LG Electronics Inc. |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |||
R2-1703620 | Procedures between MN and SN for NSA operation | discussion | Qualcomm Incorporated |
R2-97 AI: 10.2.2.1 |
noted | [WTS] [JSN] | |||
R2-1703629 | Tight interworking procedures between LTE and NR | discussion | LG Electronics Inc. |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |||
R2-1703653 | Discussion on secondary node change procedure | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
noted | [WTS] [JSN] | |
R2-1703707 | Master Node initiated Secondary Node change | discussion | NTT DOCOMO INC. | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1703749 | RRC procedure for SN change in LTE-NR interworking | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
available | [WTS] [JSN] | |
R2-1703830 | Summary on offline discussion 23 on secondary node change | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
noted | [WTS] [JSN] | |
R2-1703881 | [DRAFT] LS to RAN3 on RAN2 LTE NR interworking procedure related conclusions |
LS out LS To: RAN3 revised to R2-1703957 |
Huawei | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
revised | [WTS] [JSN] | |
R2-1703957 | LS to RAN3 on RAN2 LTE NR interworking procedure related conclusions |
LS out LS To: RAN3 revision of R2-1703881 |
RAN2 | NR_newRAT-Core | Rel-15 |
R2-97 AI: 10.2.2.1 |
approved | [WTS] [JSN] |
26 documents (0.36459112167358 seconds)