Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R3-174383 | TP for 38.413 on QoS parameter update | pCR | CATT | 38.413 0.4.0 | NR_newRAT | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174384 | TP for 38.423 on QoS parameter update | pCR | CATT | 38.423 0.4.0 | NR_newRAT | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174487 | Control of non GBR QoS flows | pCR | Huawei | 38.413 0.4.0 | NR_newRAT | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174505 | Correction of Averaging Window and Priority Level | pCR | Nokia, Nokia Shanghai Bell | 38.413 0.4.0 | NR_newRAT | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174506 | Text Proposal for Delay Critical GBR | pCR | Nokia, Nokia Shanghai Bell | 38.413 0.4.0 | NR_newRAT | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174633 | Delay Critical GBR indication from 5GC | pCR | Intel Corporation, Huawei | 38.413 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174674 | TP for QoS Flow Level Parameters for TS 38.413 | pCR | NEC | 38.413 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174675 | TP for QoS Flow Level Parameters for TS 38.424 | pCR | NEC | 38.423 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174709 | QoS parameters to align with SA2 | pCR | Ericsson | 38.423 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174710 | QoS parameters to align with SA2 | pCR | Ericsson | 38.413 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174711 | Notification Control and QoS flow release | pCR | Ericsson | 38.413 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174712 | Notification Control | pCR | Ericsson | 38.423 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174713 | Delay critical GBR QoS flows – stage 3 solution | pCR | Ericsson | 38.413 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174714 | Delay critical GBR QoS flows – stage 3 solution | pCR | Ericsson | 38.423 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
R3-174866 | Response to R3-174675 | pCR | Nokia, Nokia Shanghai Bell | 38.423 0.4.0 | NR_newRAT | Rel-15 |
R3-98 AI: 10.1.1 |
withdrawn | [WTS] [JSN] |
R3-174869 | Response to R3-174675 | response | Nokia, Nokia Shanghai Bell | Rel-15 |
R3-98 AI: 10.1.1 |
available | [WTS] [JSN] |
16 documents (0.39185881614685 seconds)