[{"name":"SP-231737","title":"New SID: Study on intent driven management services for mobile network phase 3","source":"SA WG5","contact":"Antoine Mouquet","contact-id":79376,"tdoctype":"SID new","for":"Approval","abstract":"Objective: The objective of this study item is to study the following areas for enhancing the intent driven management services of 5G network: WT-1 Continuation of Rel-18 intent driven management service topics enhancement: WT-1.1 Intent driven management for user experience assurance WT-1.2 Enablers for Intent Fulfilment, including Intent-driven Closed Loop control, Intent-driven SON orchestration and Intent-driven for MDA. WT-2 New scenarios for intent driven management for mobile network, including but not limited to: WT-2.1 Intent driven management for Uncrewed Aerial Vehicle (UAV)). WT-2.2 Intent driven management for 5G radio network traffic assurance. WT-3 New requirements for additional intent driven management functionalities. WT-3.1 Intent negotiation functionalities, including WT-3.1.1 Management capability to enable MnS producer to ask the MnS consumer to decide which out of many possible outcomes is preferred from the MnS consumer s perspective. WT-3.1.2 Management capability to enable MnS consumer to verify or check the feasibility if proposed intent expectation is possible for an MnS producer. WT-3.1.3 Management capability to enable MnS consumer to explore the best value that can be achieved from an specific intent expectation or target. WT-3.2 Intent handling state management, the management system (including MnS consumer and MnS producer) needs to know the state of an intent instance to pursue the intent lifecycle management WT-3.3 Implicit intent report subscription, the intent report subscription action is triggered by intent creation request automatically. This functionality is to support MnS consumer who expresses the intent can obtain the fulfilment report by default. WT-4 Study how Intent Utility Function can be used to allow Intent driven MnS consumer to improve priority handling by assigning relative preferences to Expectations. Study whether utility may impact existing use cases. WT-5 Intent driven approach for network slicing delivering and assurance. Note: WT-6 depends on the outcome of TR 28.836 (FS_ NETSLICE_IDMS) WT-6 Investigate the scenario and possibility to further use natural language to express the intent.","secretary_remarks":"Revision of SP-231418. This new SID was agreed. This SID NEW was approved","agenda_item_sort_order":57,"ainumber":"6.4.5","ainame":"SA WG5 New Release 19 Study Item Descriptions","tdoc_agenda_sort_order":11420,"status":"approved","reservation_date":"2023-12-14 08:29:33","uploaded":"2023-12-15 16:01:09","revisionof":"SP-231418","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGS_102_Edinburgh_2023-12\/Docs\/SP-231737.zip","group":"SP","meeting":"SP-102","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]