[{"name":"SP-230932","title":"Draft TR 28.839 Study on time sensitive networking charging","source":"SA WG5","contact":"Mirko Cano Soveri","contact-id":41957,"tdoctype":"draft TR","for":"Approval","abstract":"Abstract of document: It is the TR of Rel-18 study on charging aspects for Time Sensitive Networking, to investigate in terms of: - 5GS bridge configuration and management charging. - Time sensitive communication charging, including the communication between TSN station to TSN station and between TSN station to TSN system. - Enablers and exposure for Time sensitive communication charging and Time Synchronization Charging. The conclusion on the above items are reached. Changes since last presentation to SA Meeting #100: The evaluation of all solutions and conclusion are addressed. The editor s note about the subscriber id, quota management, triggers are solved. Outstanding Issues: None. Contentious Issues: None.","secretary_remarks":"This DRAFT TR was approved","agenda_item_sort_order":87,"ainumber":"6.8.5","ainame":"SA WG5 Specifications for Approval \/ for Information and Approval","tdoc_agenda_sort_order":11550,"status":"approved","reservation_date":"2023-09-02 14:57:36","uploaded":"2023-09-05 14:10:12","revisionof":"","revisedto":"","release":"Rel-18","crspec":28.839,"crspecversion":"2.0.0","workitem":[{"winame":"FS_TSNCH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_SA\/TSG_SA\/TSGs_101_Bangalore_2023-09\/Docs\/SP-230932.zip","group":"SP","meeting":"SP-101","year":2023,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]