[{"name":"SP-180039","title":"Draft spec for information: 21.205 - Technical Specifications and Technical Reports for a 5G based 3GPP system","source":"MCC","contact":"John M Meredith","contact-id":637,"tdoctype":"draft TS","for":"Information","abstract":"Abstract: First draft of a TS listing all specs required to build a 5G system, continuing the series 01.01\/41.101 (GSM), 21.201 (UTRAN), 21.202 (Common IMS). Changes since last presentation to <TSG> Meeting #<N>: n\/a Outstanding Issues: The list of specs extracted automatically from the 3GU database at  http:\/\/www.3gpp.org\/dynareport\/SpecList.htm?release=Rel-15&tech=4 will not be up to date until after the freeze of Release 15. Contentious Issues: None.","secretary_remarks":"Noted","agenda_item_sort_order":180,"ainumber":"20.3","ainame":"Specification Status","tdoc_agenda_sort_order":12380,"status":"noted","reservation_date":"2018-03-08 15:54:50","uploaded":"2018-03-08 16:23:55","revisionof":"","revisedto":"","release":"Rel-15","crspec":21.205,"crspecversion":"1.0.0","workitem":[{"winame":"5GS_Ph1"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/tsg_sa\/TSG_SA\/TSGS_79\/Docs\/SP-180039.zip","group":"SP","meeting":"SP-79","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]