[{"name":"S5-260092","title":"pCR TR28.889 Scope of CCL for Network Maintenance","source":"Nokia","contact":"Stephen Mwanje","contact-id":83479,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":82,"ainumber":"6.20.","ainame":"Study on Closed Control Loop Management phase 2","tdoc_agenda_sort_order":1030,"status":"revised","reservation_date":"2026-01-22 12:59:21","uploaded":"2026-01-29 14:18:39","revisionof":"","revisedto":"S5-260704","release":"Rel-20","crspec":"28.889","crspecversion":"0.2.0","workitem":[{"winame":"FS_CCLM_Ph2"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG5_TM\/TSGS5_165\/Docs\/S5-260092.zip","group":"S5","meeting":"S5-165","year":2026,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]