[{"name":"S5-202341","title":"pCR TS 28.536 Move and update Annex  A Management control loop in different later from TS 28.535","source":"Huawei,China Mobile","contact":"Mirko Cano Soveri","contact-id":41957,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":16,"ainumber":"6.4.7","ainame":"Closed loop SLS Assurance","tdoc_agenda_sort_order":22381,"status":"approved","reservation_date":"2020-04-24 08:37:09","uploaded":"2020-05-07 13:37:54","revisionof":"S5-202238","revisedto":"","release":"Rel-16","crspec":28.536,"crspecversion":"0.2.0","workitem":[{"winame":"COSLA"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_SA\/WG5_TM\/TSGS5_130e\/Docs\/S5-202341.zip","group":"S5","meeting":"S5-ah-35870","year":2020,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]