[{"name":"S5-171770","title":"Rel-15 pCR 32.899 High level charging requirements","source":"Nokia, Alcatel-Lucent Shanghai Bell","contact":"Maryse Gardella","contact-id":68914,"tdoctype":"pCR","for":"Approval","abstract":"","secretary_remarks":"","agenda_item_sort_order":45,"ainumber":"7.5.3","ainame":"Study on Charging Aspects of 5G System Architecture Phase 1","tdoc_agenda_sort_order":17700,"status":"revised","reservation_date":"2017-03-20 18:16:18","uploaded":"2017-03-20 22:16:05","revisionof":"","revisedto":"S5-171888","release":"Rel-15","crspec":32.899,"crspecversion":"0.0.0","workitem":[{"winame":"FS_5GS_Ph1_CH"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_SA\/WG5_TM\/TSGS5_112\/Docs\/S5-171770.zip","group":"S5","meeting":"S5-112","year":2017,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]