[{"name":"S2-2507476","title":"KI#2: Solution for IMS signaling performance optimization to support voice over GEO .","source":"Qualcomm Incorporated, NTT DOCOMO","contact":"Kefeng Zhang","contact-id":103832,"tdoctype":"pCR","for":"Approval","abstract":"This contribution proposes a solution for optimization of IMS signaling performance on WT-1.2.","secretary_remarks":"Revision of S2-2506914, merging S2-2507318. Revised in parallel session to S2-2507630.","agenda_item_sort_order":149,"ainumber":"20.1.1","ainame":"Study on Integration of satellite components in the 5G architecture Phase 4 (FS_5GSAT_Ph4_ARC)","tdoc_agenda_sort_order":18320,"status":"revised","reservation_date":"2025-08-28 10:37:39","uploaded":"2025-09-01 14:11:07","revisionof":"S2-2506914","revisedto":"S2-2507630","release":"Rel-20","crspec":"23.700-19","crspecversion":"0.2.0","workitem":[{"winame":"FS_5GSAT_Ph4_ARC"}],"crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/tsg_sa\/WG2_Arch\/TSGS2_170_Goteborg_2025-08\/Docs\/S2-2507476.zip","group":"S2","meeting":"S2-170","year":2025,"uicc_affected":"","me_affected":"","ran_affected":"","cn_affected":"","clauses_affected":"","crsinpack":null,"crsinpacknumber":0}]